• Title/Summary/Keyword: total pollution load management system

Search Result 70, Processing Time 0.026 seconds

Application of the Load Duration Curve (LDC) to Evaluate the Achievement Rate of Target Water Quality in the Han-River Watersheds (부하지속곡선(Load Duration Curve; LDC)을 이용한 한강수계 오염총량관리 목표수질 평가방법 적용 방안)

  • Kim, Eunkyoung;Ryu, Jichul;Kim, Hongtae;Kim, Yongseok;Shin, Dongseok
    • Journal of Korean Society on Water Environment
    • /
    • v.31 no.6
    • /
    • pp.732-738
    • /
    • 2015
  • Water quality in four major river basin in Korea was managed with Total Maximum Daily Load (TMDL) System. The unit watershed in TMDL system has been evaluated with Target Water Quality (TWQ) assessment using average water quality, without considering its volume of water quantity. As results, although unit watershed are obtained its TWQ, its allocated loads were not satisfied and vice versa. To solve these problems, a number of TWQ assessments with using Load Duration Curve (LDC) have been studied at other watersheds. The purpose of this study was to evaluate achievement of TWQ with Flow Duration Curve (FDC) and Load Duration Curve(LDC) at 26 unit watersheds in Han river basin. The results showed that achievement rates in TWQ assessment with current method and with LDC were 50~56 % and 69~73%, respectively. Because of increasing about 20% of achievement rates with using LDC, the number of exceeded unit watershed at Han river Basin was decreased about 4~6 unit watersheds.

Excessive State of Pollutant Load Allocation and Penalty Application Schemes based on Pollutant Reduction Plan Types for Solving Excessive Problem of Allocation (오염할당부하량의 초과현황 및 초과해소를 위한 삭감계획 유형에 따른 페널티 적용방안)

  • Park, Jae Hong;Park, Bae Kyoung;Oh, Seung Young;Hwang, Ha Sun;Lee, Jae Kwan
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.1
    • /
    • pp.66-73
    • /
    • 2013
  • Total Maximum Daily Loads (TMDLs) system was introduced to manage pollution load of watershed and to improve water quality of unit watershed so that it is possible to protect dringking water soureces. Load allocation observation is the most important factor in TMDLs system. Because if load allocation is not observed, it is difficult to achieve water quality goal of unit watershed. Also it is impossible to improve water quality of the drinking water sources. Therefore it is necessary to apply some kind of sanctions (penalty) in case of excess of load allocation. The sanctions have to be, however, applied differently based on various reduction plan types, i.e., using the reduction load planed in 2nd phase, delay the completion, additional reduction in 2nd phase, error of the pollution sources, etc. Moreover, the penalty load should be properly imposed, lest it should be overburden the provence. The reduction load trade inter province must be restrictively permmitted only the same unit watershed.

A Study on the Total Pollutant Load Management of Masan Bay Using GIS Technique (GIS 기법을 이용한 마산만 오염총량관리에 관한 연구)

  • Cho, Bo-Hyun;Yang, Keum-Chul
    • Journal of Wetlands Research
    • /
    • v.14 no.1
    • /
    • pp.89-99
    • /
    • 2012
  • This study aims to develop the Masan bay special management system of the point and nonpoint sources of pollution using GIS as part of the Integrated Management System of the Masan Bay Special Management Area and utilize Total Pollution Loads Management System in Masan Bay more systematically and scientifically. The result of the pollution sources management at the Masan bay in conjunction with GIS was made possible the comparison of the source of pollution and the pollutant load among each administration area. It also developed Arc-GIS watershed management program which enables to estimate the population for discharge facilities, the water use of domestic population and commercial population, and pollutant load and discharge load of COD, TN and TP by the administration areas, years, and usages. In addition, this study anticipated minimizing temporal, economical efforts in utilizing large amounts of property and space utilization data and expediting the decision making process of policies in relation to the systematic and effective management system of pollutant loads at the Masan bay area. Further studies are required to plan the systematic management of the point and nonpoint sources of pollution and complement the watershed management system using GIS program for pollutant load which enables to predict the current and future state of point and nonpoint sources.

Determination of Interception Flow by Pollution Load Budget Analysis in Combined Sewer Watershed - Analysis of Pollution Load Budget in Watershed - (오염부하 물질수지 분석을 통한 합류식 하수관거 적정 차집용량 결정(I) -오염부하 물질수지 분석-)

  • Lee, Doojin;Kim, Juwhan;Woo, Hyungmin;Ahn, Hyowon
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.19 no.5
    • /
    • pp.547-556
    • /
    • 2005
  • The objective of this study is to obtain adequate intercepting flow during wet weather conditions in combined sewer system. Two study sites are selected under considering different population density, one is developed area with heavy urbanization. Another is recently developing area. In the analysis of field investigation, SS was most significant in initial flushing effects compared with other factors and showed the result with the order of COD, TP, TN. As compared with event mean concentration(EMC) of runoff, BOD, TN and TP showed high concentrations in wide area with relatively large population density. It is by the reason that much pollution load was discharged to receiving water from urbanized area during wet period. According to results of storm-water modeling, 53% of total COD and 52% of total SS pollution load were discharged to receiving water by overflow than intercepting capacity in middle population density site. Also, in the urbanized area, pollution load was discharged to receiving water by 49% of total COD and 77% of total SS. These results can be applied to setup for pollution load flow(budget) generation, collection, treatment and discharging in order to obtain adequate intercepting flow.

A Study on the Method of Implementation Assessment for Total Maximum Daily Load Management (수질오염총량관리를 위한 효율적 이행평가방안 연구)

  • Park, Jun-Dae;Park, Ju-Hyun;Rhew, Doug-Hee;Jeong, Dong-Hwan
    • Journal of Environmental Impact Assessment
    • /
    • v.17 no.2
    • /
    • pp.125-132
    • /
    • 2008
  • It is desirable that implementation assessment (IA) should be carried out efficiently in order to make successful progress of Total Maximum Daily Load (TMDL) in watershed management. There are many difficulties in the process of the implementation assessment because of the early stage in the application of TMDL in Korea. This study reviewed the present status of IA and proposed the methodology of its improvement such as flexible application of TMDL ledger, and standardization of assessment index and criteria. The deficient time for assessment period could be corrected by the consideration of the post-procedure after the submission of IA report.

Wastewater Flowrate Analysis of Drainage Basin for Application of Total Water Pollution Load Management System (수질오염총량관리제도 적용을 위한 도시유역의 하수발생량 분석)

  • Kwon, Jun-Hee;Park, In-Hyeok;Ha, Sung-Ryoung
    • Journal of Wetlands Research
    • /
    • v.11 no.1
    • /
    • pp.75-82
    • /
    • 2009
  • The regulation of emission concentration for stream water qualities doesn't control quantitative increase on pollution loads, it has limits for improvement of water qualities. Total water pollution load management system(TMDL) can control the total amount of pollutant in waste water which is allowed to assign and control the total discharged pollutant loads in a permissible level. When it comes to generated wastewater value of TMDL system, there is difference between calculated value based on individual pollutant unit load and observed value. Calculated sewer inflow, calculated sewer outflow, measured sewer inflow, and measured sewer outflow at dry season are $26,460.9m^3$/d, $17,778.6m^3$/d, $17,106.1m^3$/d and $19,033.9m^3$/d respectively, Calculated sewer inflow, calculated sewer outflow, measured sewer inflow, and measured sewer outflow at rainy season are $49,512.2m^3$/d, $18,628.7m^3$/d, $30,918.2m^3$/d, $19,700.7m^3$/d respectively. This result presents the necessity to acquire the precise observed data to fulfill the efficient TMDL system.

  • PDF

Application of the Load Duration Curve (LDC) to Evaluate the Rate of Achievement of Target Water Quality in the Youngsan · Tamjin River Watersheds (부하지속곡선(LDC)을 이용한 영산강 · 탐진강수계 오염총량관리 목표수질 평가방법 적용 방안)

  • Cheong, Eunjeong;Kim, Hongtae;Kim, Yongseok;Shin, Dongseok
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.4
    • /
    • pp.349-356
    • /
    • 2016
  • Total Maximum Daily Loads (TMDLs) System has been used to improve water quality in the Youngsan·Tamjin river basin since 2004. The Basic Policy of TMDLs sets up the standard flow based on the average dry condition or mid-range flow during the last 10 years. However, Target Water Quality (TWQ) assessment on TMDLs has been used to evaluate water quality through eight-day intervals over 36 times a year. The results for allocation evaluation and target water quality evaluation were different from each other in the same unit watershed during the first period. In order to improve the evaluation method, researchers applied Load Duration Curve (LDC) to evaluate water quality in nine unit watersheds of the Youngsan·Tamjin river basin. The results showed that achievement rates of TWQ assessment with the current method and LDC were 67~100% and 78~100%, respectively. Approximately 11% of the achievement rates with use of LDC were higher than those with use of the current method. In conclusion, it is necessary to review the application of the LDC method in all Four Major River Watersheds.

Unit-load Method for the Estimation of Non-point Pollution Loads by Subcategorizing the Land-use Category Reflected in the National Land Register Data : A Case Study of Kyeongan Watershed in South korea (경안천 유역 지적공부에 나타난 특정지목의 토지이용 특성 세분화를 통한 비점오염 부하량 산정 개선방안)

  • Lee, Bum-Yeon;Lee, Chang-Hee;Ha, Do;Lee, Su-Woong
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.4
    • /
    • pp.598-607
    • /
    • 2010
  • One of constraints in the application of unit-load method to estimate non-point pollution loads in the total water pollutant load management system (TWPLMS) is the limited numbers of applicable unit-loads. Since only 7 unit-loads are currently available for total 28 land-use categories in the national land register data, each unit-loads inevitably have to represent several land-use categories regardless of their actual land coverage characteristics. As a way to minimize the problem, this study suggested a nested application of the available unit-loads based on the analysis of high resolution aerial images taken in the Kyeongan watershed. Statistical analysis of three selected land-use categories such as school, apartment complex, and golf course showed that there exit significant (95% confidence level) relationships between the registered land-uses and actual land coverages. The school and apartment complex currently considered as 100% ground have only 65% and 80% of ground characteristics, respectively. Golf course, which is considered as 100% pasture, has about 5% of ground area. This indicates that the unit-load method using in TWPLMS can give over estimated non-point pollutant loads for the school and apartment complex (19.8~54.4%) but under estimation for the golf course (80.9%).

Evaluation and Application of CLUE-S Model for Spatio-Temporal Analysis of Future Land use Change in Total Water Pollution Load Management System (오염총량관리제의 시공간적 미래 토지이용 변화분석을 위한 CLUE-S 모델의 적용 및 평가)

  • Ryu, Jichul;Ahn, Ki Hong;Han, Mideok;Hwang, Hasun;Choi, Jaewan;Kim, Yong Seok;Lim, Kyoung Jae
    • Journal of Korean Society on Water Environment
    • /
    • v.30 no.4
    • /
    • pp.418-428
    • /
    • 2014
  • The purpose of this study is to predict the spatio-temporal changes in land uses and to evaluate land-based pollutant loads in the future under Total Water Pollution Load Management System using CLUE-S model. For these ends, sensitive parameters of conversion elasticities in CLUE-S model were calibrated and these calibrated parameters of conversion elasticities, level II land cover map of year 2009, and 7 driving factors of land use changes were used in predicting future land uses in 2002 with two scenarios(Scenario 1: non area restriction, Scenario 2: area restriction). This projected land use map of 2020 was used to estimate land-based pollutant loads. It was expected that urban areas will increase in 2020 from both scenarios 1 and 2. In Scenario 1, urban areas are expected to increase within greenbelt areas and deforest would be expected. Under Scenario 2, these phenomena were not expected. Also the results of estimation of BOD and TP pollutant loads, the BOD difference between scenarios 1 and 2 was 719 kg/day in urban areas and TP difference was 17.60 kg/day in urban areas. As shown in this study, it was found that the CLUE-S model can be useful in future pollutant load estimations because of its capability of projecting future land uses considering various socio-economic driving factors and area-restriction factors, compared with conventionally used land use prediction model.

Estimation of Discharge Load due to Combined Sewer Overflows in the Management of Total Maximum Daily Loads (수질오염총량관리 관거월류부하 변화에 따른 배출부하량 산정방법)

  • Park, Jun Dae;Oh, Seung Young;Choi, Ok Youn
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.3
    • /
    • pp.293-299
    • /
    • 2011
  • The quantity of a discharge load can change with changes in rainfall in the area with a combined sewer system (CSS). To evaluate the implementation appropriately in the management of total maximum daily loads (TMDLs), the effects of rainfall changes should be considered in the estimation of the discharge load. The rainfall condition for the estimation of the discharge load in a certain year should be standardized to the same rainfall condition as that of the reference year. However, the calculation process is very complicated with its potential limitations. This study investigated and developed relatively simple methods for estimating the discharge load. Load conversion method (LCM) is designed to convert the discharge load under the current rainfall condition into that of the reference rainfall conditions. Simple rainfall data method (SRDM) is to simplify the estimation process of the discharge load by the simple conversion of rainfall data. These methods were applied to calculate the discharge load and examine the estimation results. From the results of this study the application of these methods may be useful for estimating the discharge load in the TMDL process.