• Title/Summary/Keyword: time schedule

Search Result 1,364, Processing Time 0.025 seconds

The Studies of the Dietary Survey and Daily Living Schedule of College Women - Changes during six years - (여대생의 섭식태도 및 생활시간에 관한 조사연구 - 6년간의 추이 조사 -)

  • Lee, Myoung-Hee;Moon, Soo-Jae
    • Journal of Nutrition and Health
    • /
    • v.16 no.2
    • /
    • pp.97-106
    • /
    • 1983
  • For the purpose of implementing health and nutrition education for college women, we investigated changes in height, weight, and daily living schedule, as well as the relationship between energy intake and expenditure, and food and nutrients intake levels for the six years from 1977 to 1982. A special form of questionaires was prepared and distributed to well-trained subjects (total 213) in order to find out their general characteristics, daily living schedule and dietary intakes. The recovery of questionaires distributed to each subject was 90%. Then the quality of their living, energy balance, nutrient intake and food intake were evaluated and the F-test was used to test the statistical significances. It was found that : 1) The range of weights and heights of subjects were between 48-50 kg, 157-161cm respectively over the 6 year period. 2) In daily living schedule, that is, the average physiological activity time including sleeping ranged from 760 to 801 minutes. Free time decreased gradually, from 318 minutes per day in 1977 to 275 minutes in 1982. Average time for study and for house work was 196-280 minutes and 68 - 157 minutes respectively for 6 years, and study time was significantly varied in each year. 3) The energy intake of the subjects averaged 1762 Kcal, whereas the expended energy was 1892 Kcal. In the energy balance determined by the relationship between energy intake and expendituye, the ratio of subjects who maintained a negative energy balance gradually increased from 53% (1977) to 64%(1982). 4) The average nutrient intake was higher than the recommended dietary allowance except for calorie (1997 - 1982), calcium (1979) and iron (1979, 1980). The total calorie intake was composed of 59-63% carbohydrate, 19 - 24% fat and 15 - 18% protein Of the total protein intake the percentage of animal was 47 -51% for six years, showing acceptable nutritional status. 5) The average total food intake of the subjects increased from 1,080 g (1977) to 1,184g (1982), but this was not a significant difference. Cereal composed the highest proportion among the total food intakes, and rice intake was 58-78% of cereals. Cereal was followed in decreasing order by vegetables, dairy products, fruits, meat and fish products. The option available for the selection of cooking methods as well as the selection of food item was limited, so there were few changes over time.

  • PDF

Effects of Olanzapine on the Schedule-Induced Polydipsic Rats (Olanzapine이 백서의 Schedule-Induced Polydipsia에 미치는 영향)

  • Lee, Gi-Chul;Lee, Kyung-Kyu;Chang, Hwan-Il;Lee, Jung-Ho;Kim, Hyun-Woo;Ha, Jun-Myung;Jeong, Jae-Hyun;Jeong, Hong-Kyung
    • Korean Journal of Biological Psychiatry
    • /
    • v.6 no.2
    • /
    • pp.240-245
    • /
    • 1999
  • Object : This study was designed to evaluate the effects of olanzapine on the schedule-induced polydipsia(SIP) which is one of animal model of obsessive-compulsive disorder in rats. We administered olanzapine as a serotonin and dopamine blocking agent, fluoxetine as a selective serotonin reuptake inhibitor, and haloperidol for the dopamine antagonist to rats which showed schedule-induced polydipsic behavior. Methods : Spraque-Dawley rats weighing 200-250gm were individually housed and maintained and allowed free access to water. The rats were placed on a restricted diet. To induce polydipsia, rats were placed in the cage where a pellet dispenser automatically dispensed 90mg pellets on a fixed-time 60 seconds(FT-60s) feeding schedule over 150 minute test session per day. Water was available at all times in the cage. After 4 weeks of daily exposure to the FT 60s feeding schedule, experimental rats met a predetermined criterion for polydipsic behavior(greater than 3 times of water per session on average). 5 groups of rats were administered olanzapine(3mg/kg, i.p), olanzapine(10mg/kg, i.p), fluoxetine(5mg/kg, i.p.), haloperidol(0.1mg/kg, i.p.), and vehicle(1cc/kg, i.p.) for 3 weeks. The rats were tested once a week to access schedule induced polydipsic behavior. Water bottles were weighed before and after the 150-minute test session. The chronic effects of administration of experimental drugs on schedule induced polydipsic behavior were analyzed with ANOVA and Scheffe test as a posthoc comparison. In order to measure water consumption in non-polydipsic food-deprived rats, a separate group of rats(N=8) were individually housed and given a single bolus(14.5gm) of food per day which maintained them at their average body weight. Results and Conclusion : The results were as follows ; 1) After 4 weeks of scheduled feeding procedure, the experimental group showed significant differences than the bolus control in the amount of water consumption as compared with their average water intakes for 4 weeks. At the same periods, there were no differences between the experimental group and the bolus control in the body weight. 2) The fluoxetine group showed significant decrease in the amount of water intake over the 3 weeks of drug treatment as compared with their average amount of polydipsic water intakes. The olanzapine 3mg group showed significant decrease in the amount of water intake at 3rd weeks of drug treatment as compared with their average amount of polydipsic water intakes. The olanzapine 10mg group showed significant decrease in the amount of water intake at 2nd and 3rd weeks of drug treatment as compared with their average amount of polydipsic water intakes. However, the haloperidol group and the vehicle control group showed no changes of amounts of water intake for 3 weeks of treatment as compared with their average amount of polydipsic water intakes. 3) The fluoxetine group showed significantly lower amounts of water intake than the haloperidol group at 2nd weeks of drug treatment. And also the fluoxetine group showed significantly lower amounts of water intake than the haloperidol group and the vehicle control at 3rd weeks of drug treatment. The olanzapine 3mg group and the olanzapine 10mg group showed significantly lower amounts of water intake than the haloperidol group and the vehicle control at 3rd weeks of drug treatment. Above findings suggest that the fixed time feeding procedure for schedule-induced polydipsia as an animal model of obsessive compulsive disorder was effective to the evaluation of pharmacological challenge study. The authors assume that the serotonin hypothesis and the serotonin-dopamine interaction hypothesis are preferred to the dopamine hypothesis in the biological etiology of obsessive-compulsive disorder.

  • PDF

The Scheduling of Real-Time tasks using Performance Evaluation through fuzzy-random in Real-Time Systems

  • Cho, H-G;Kim, H-B
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.487-487
    • /
    • 2000
  • The scheduling of real-time tasks needs both correctness and timeliness. But it is not easy to schedule real-time tasks having different characteristics in a single system. In this paper we solve the problem through an approach using the performance evaluation of real-time tasks through fuzzy-random variables. Using the performance evaluation through fuzzy-random variable, we can achieve flexible and efficient scheduling for real-time systems.

  • PDF

Estimation of Nursing Costs by a Patient Classification System(PCS) in ICU (중환자 간호단위의 환자분류군별 간호원가 산정연구)

  • Sung, Young-Hee;Song, Mi-Sook;Park, Jung-Ho
    • Journal of Korean Academy of Nursing
    • /
    • v.37 no.3
    • /
    • pp.373-380
    • /
    • 2007
  • Purpose: The objective of our study was to figure out costs of nursing services in ICU based on the PCS in order to determine an appropriate nursing fee schedule. Method: Data was collected from 2 hospitals from April 15-16 to April 22-23, 2003. The costs of nursing services in the ICU were analyzed by nursing time based on the nursing intensity. The inpatients in the ICU were classified by a PCS tool developed by the Korean Clinical Nurses Association(2000). Results: The distribution of patients by PCS in the ICU ranged from class IV to Class VI. The higher PCS in ICU consumed more nursing time. As a result, the higher nursing intensity, the more the daily average nursing costs in the ICU. Conclusion: Our study provides evidence to refine the current nursing fee schedule that does not differentiate from the volume of nursing services based on nursing time. We strongly recommend that the current reimbursement system for nursing services should be applied not only to the general nursing units but also to the ICU or other special nursing units.

Development and Analysis of Real-time Distributed Air Defense System Simulator Using a Software Framework (소프트웨어 프레임워크를 이용한 대공유도무기 실시간 분산 시뮬레이터 개발 및 분석)

  • Cho, Byung-Gyu;Youn, Cheong
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.8 no.4 s.23
    • /
    • pp.58-67
    • /
    • 2005
  • To overcome limitations of test scope, schedule and cost, M&S(Modeling & Simulation) technique has been applied for T&E(Test and Evaluation) of the state-of-art weapon systems. This paper proposes an air defense simulation software framework to reduce both redundancy an[1 programming errors in system simulator. The proposed framework consists of a 'model' and a 'middleware' The 'middleware' is a reliable communication service layer that supports not only HLA(High Level Architecture) which is an international standard in M&S but also TCP/IP, UDP and etc. The main role of 'model' is to schedule and to run the real-time distributed simulation. The proposed framework has been applied to M-SAM(Middle range Surface to Air Missile) system simulator. The proposed framework's scheduling and communication performance results are satisfactory and were measured by hardwired NTP(Network Timer Protocol) time-stamp with GPS(Global Positioning System) timer for better precision.

Fault-tolerant Scheduling of Real-time Parallel Tasks with Energy Efficiency on Multicore Processors (멀티코어 프로세서 상에서 에너지 효율을 고려한 실시간 병렬 작업들의 결함 포용 스케쥴링)

  • Lee, Kwanwoo
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.3 no.6
    • /
    • pp.173-178
    • /
    • 2014
  • By exploiting parallel processing, the proposed scheduling scheme enhances energy saving capability of multicore processors for real-time tasks while satisfying deadline and fault tolerance constraints. The scheme searches for a near minimum-energy schedule within a polynomial time, because finding the minimum-energy schedule on multicore processors is a NP-hard problem. The scheme consumes manifestly less energy than the state-of-the-arts method even with low parallel processing speedup as well as with high parallel processing speedup, and saves the energy consumption up to 86%.

An Optimal Scheduling Method Using Probability on the Estimation of Construction Duration (확률적 공기산정에 의한 공정계획 합리화 방안)

  • Kim Sang-Joong;Lee Jae-Soeb
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.72-79
    • /
    • 2004
  • Critical Path-based project management has been applied to the construction projects with a goal of delivering projects within original costs and time estimates. These current project management methods, rarely make early finishes of construction Projects. In addition, current practices on time management seems not to take advantages of early finishes concepts due to student syndrome and Parkinson's Law, This research study applied the Theory of Constraints(n) in the estimation of construction project duration. While the TOC includes variety of management techniques, in this study, it refers to critical chain that has been used to develop the specific management technique in scheduling. The concept of critical chain is applied to this study to solve the problems associated with the current scheduling method. The efforts focus to solve the p개blems associated with current construction project scheduling methods by adopting both stochastic estimation technique and the concept of schedule buffer,

A Study on the Satisfaction of Clinical Practice in School Hospital (학교병원 임상실습 만족도에 관한 연구)

  • Lee, Jae-Hong;Kwon, Won-An;Kim, Sang-Soo;Kim, Gi-Chul;Lee, Jin-Hwan;Min, Dong-Ki
    • PNF and Movement
    • /
    • v.11 no.1
    • /
    • pp.69-78
    • /
    • 2013
  • Purpose : This study was to investigate the satisfaction of clinical practice according to medical institute. Methods : A survey was administered for 70 college students with experience in clinical practices. We investigated using a questionnaire on 'curriculum factors on practice', 'environmental factors on practice', 'time-schedule factors on practice', 'teaching factors on practice'. A statistical analysis was performed using SPSS 17.0 for window version. Results : 1. The degree of satisfaction on curriculum of clinical practice was higher college hospital than other hospital in 3 among 5 items(p<.05). 2. The degree of satisfaction on environmental factors of clinical practice was higher school hospital than other hospital in 4 among 6 items(p<.05). 3. The degree of satisfaction on time-schedule factors of clinical practice was higher college hospital than other hospital in 1 among 5 items(p<.05). 4. The degree of satisfaction on teaching factors of clinical practice was higher college hospital than other hospital in 4 among 6 items(p<.05). Conclusion : It was revealed by this survey that the satisfaction of clinical practice in school hospital had higher other hospital in curriculum, environment and teaching factors. To maximize the effects of clinical practice, a clinical practice program in school hospital is required and further research and attention are suggested.

Estimating System for Responsible Days of Schedule Delay for Construction Projects through Time Impact Analysis (건설공사 공기지연 영향분석을 통한 책임일수 산정체계 구축방안)

  • Kang, Leen-Seok;Kwon, Jung-Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.685-694
    • /
    • 2008
  • Recently, construction projects are being gradually changed to large projects with complicated work processes. As a result, claims are increasing as well. Of these, the claims by delayed construction duration are given much weight in the general construction claims. To solve this problem, researches to estimate damages due to delay are carried out in research institutes by analyzing the causes of schedule delay. A system to easily estimate responsible days by analyzing the complicated processes needs for project manager. This study suggests a methodology based on the time impact analysis method, which can utilize the consequential analytical method with the consideration of reduced construction period. The suggested methodology is verified by comparing with actual data of case study by the computerized system for estimating the responsible days.

Development of a Nursing Fee Schedule Model (적정간호수가 산정모형 개발을 위한 연구)

  • 조소영;박정호
    • Journal of Korean Academy of Nursing
    • /
    • v.23 no.1
    • /
    • pp.68-89
    • /
    • 1993
  • This study was conducted to develop a model of a fee schedule for nursing services.'Regardless of the demand for skilled and professional nursing service today, the Korean health insurance system does not furnish a chapter for the nursing service fee schedule. A nation-wide survey of hospital nursing service fee schedules was to provide practical and realistic data about how the variety of nursing services are being charged. From September 1990 to April 1991, data from the fee schedule used by twenty hospitals located in eight large cities which are designated large medical regions in the Korea Health Care and Patient Referral System were collected. Nursing services and the fees charged for them were analyzed. The nursing services were subjected to a secondary analysis with referrence to reports on “nursing services to be charged in Korea”. The total number of nursing services recommended by the literatures was 177 : finally 141 types of nursing services were selected by investigator as chargable nursing services. In addition, data on managerial characteristics of the hospitals were collected to discover influential variables for a nursing fee schedule model. Under the assumption that all the managerial characteristics of the hospitals influenced the fee schedule, the following model was tested : Fee of nursing services (C) = f(A₁, A₂, A₃, A₄, A/sub 5/, A/sub 6/, A/sub 7/, A/sub 8/,) When, A₁ = number of nurses A₂ = the first salary of a nurse educated in a four year A₃ = scale of nursing management division A₄ = location of the hospital A/sub 5/ = the type of hospital management (profit / non-profit) A/sub 6/ = number of hospital beds A/sub 7/ = years of hospital operation A/sub 8/ = number and kinds of clinical divisions The results showed that the model should be built as follows : C = f (A₁, A/sub 4/, A/sub 5/) Each nursing service was applied to the fee schedule with consideration for the professional level and time-taken to provide the services. Detailed fee schedules were presented in the related tables. Of the 141 kinds of nursing services, 24.8% were chargeble to the Korea Health Insurance, 32.6% of the nursing services were being paid directly by the patienty. The rest of nursing services (42.6%) were not being charged to any source. It was recommened that the Korea Health Insurance Reimbursement system should add a classification system for nursing services that can be used in the national health care program. Further study is needed about how to include 32.6% of the nursing services now being paid for directly by the patients in the health insurance system.

  • PDF