• 제목/요약/키워드: time schedule

검색결과 1,356건 처리시간 0.031초

프로젝트 일정에서 선행활동 품질이 후행활동의 시간과 비용에 미치는 문제 - 자원제약이 존재하는 프로젝트 일정문제 - (The Problem of the Quality of the Predecessor Activity on the Time and Cost of the Successor Activity in the Project Schedule - Project Schedule with Resource Constraints -)

  • 김갑식;배병만;안태호
    • 품질경영학회지
    • /
    • 제50권2호
    • /
    • pp.265-286
    • /
    • 2022
  • Purpose: The time and cost of a project activity exists in a selected mode and there is a quality level for the selected mode, and the time and cost of the current activity is determined by the quality level of the preceding activity. When an activity is a predecessor activity of an activity, it is characterized as a trade-off problem in which the time and cost of the activity are determined according to the quality level of the activity. Methods: A neighbor search heuristic algorithm obtains a solution by (1) randomly determining the mode, quality level, and assignment order for each activity. (2) get a solution by improving the solution by changing the possible modes and quality levels; (3) to find a solution by improving the solution from the point where it is feasible to advance the start time. Here, Case[1] is a method to find the optimal solution value after repeating (1). Case [2] is a method for finding a solution including (1) and (2). Case [3] refers to a method for finding solutions including (1), (2), and (3). Results: It can be seen that the value of the objective function presented by the algorithm changes depending on how the model of the heuristic algorithm is designed and applied. In other words, it suggests the importance of algorithm design and proves the importance of the quality problem of activities in the project schedule. Conclusion: A study significance of the optimization algorithm and the heuristic algorithm was applied to the effect of the quality of the preceding activity on the duration and cost of itself and the succeeding activity, which was not addressed in the project schedule problem.

분산관리 시스템을 위한 동적 스케쥴링의 연구 (A Study on the Dynamic Scheduling for Distributed Management Systems)

  • 정남기
    • 대한산업공학회지
    • /
    • 제21권2호
    • /
    • pp.207-216
    • /
    • 1995
  • Constructing a distributed management system has its own advantages in addressing the issue of implementing a quick responsive management system in dynamically changing environment of enterprise. We suggest a basic scheduling methodology applicable to a distributed production management system. A new concept of "flexible schedule" is introduced as a tool to accommodate dynamically changing situations of job shops. Then a search technique (referred to as CSP-CBA search) is presented to obtain such a schedule for the job shop scheduling problem, which is converted into a constraint satisfaction problem(CSP), by using the constraint based analysis(CBA). This approach is tested on more than 100 test problems. The results show that the suggested approach required shorter CPU time and solved more problems in given time than another fixed schedule method.

  • PDF

ATO 자동운전 기반의 무인운전 경전철 TPS에 관한 연구 (A Study on TPS based on ATO for Driverless LRT)

  • 이창형;이종우
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.1132-1137
    • /
    • 2008
  • Automatic Operation based on ATO (Automatic Train Operation) is necessary for driverless Light Rail Transit business. When this kind of driverless LRT operation plan is made, TPS (Train Performance Simulation) is traditionally simulated at all-out mode and coasting mode based on manual operation. Commercial schedule speed equals to all-out speed minus $9{\sim}15%$ make-up margin. Coasting mode TPS simulation is also run at commercial schedule speed to calculate run time and energy consumption. But TPS based on manual operation should make an improvement on accuracy in case of driverless LRT operation Plan. In this paper, new fast mode TPS simulation using ATO pattern is proposed and show near actual ATO result. The actual ATO pattern can be accurately simulated with the introduction of 4 parameters such as commercial braking rate, jerk, station stop profile and grade converted distance. Normal mode TPS simulation for commercial schedule speed can be designed to have fast mode trip time plus 3 seconds/km margin recommended by korean standard LRT specification.

  • PDF

교착 회피를 고려한 Job-Shop 일정의 최적화 (Optimization of Job-Shop Schedule Considering Deadlock Avoidance)

  • 정동준;이두용;임성진
    • 대한기계학회논문집A
    • /
    • 제24권8호
    • /
    • pp.2131-2142
    • /
    • 2000
  • As recent production facilities are usually operated with unmanned material-handling system, the development of an efficient schedule with deadlock avoidance becomes a critical problem. Related researches on deadlock avoidance usually focus on real-time control of manufacturing system using deadlock avoidance policy. But little off-line optimization of deadlock-free schedule has been reported. This paper presents an optimization method for deadlock-free scheduling for Job-Shop system with no buffer. The deadlock-free schedule is acquired by the procedure that generates candidate lists of waiting operations, and applies a deadlock avoidance policy. To verify the proposed approach, simulation resultsare presented for minimizing makespan in three problem types. According to the simulation results the effect of each deadlock avoidance policy is dependent on the type of problem. When the proposed LOEM (Last Operation Exclusion Method) is employed, computing time for optimization as well as makespan is reduced.

테이블 패턴 스케줄 기반 OTP 인증 (New OTP Authentication Approach based on Table Pattern Schedule)

  • ;;;변영철
    • 전기학회논문지
    • /
    • 제66권12호
    • /
    • pp.1899-1904
    • /
    • 2017
  • This paper presents a new one-time password approach generated based on $4{\times}4$ pattern schedule. It demonstrates generation of passkey from initial seed of random codes and mapping out in table pattern schedule which will produce a new form of OTP scheme in protecting information or data. The OTP-2FA has been recognized by many organizations as a landmark to authentication techniques. OTP is the solution to the shortcomings of the traditional user name/password authentication. With the application of OTP, some have benefited already while others have had second thoughts because of some considerations like cryptographic issue. This paper presents a new method of algorithmic approach based on table schedule (grid authentication). The generation of OTP will be based on the random parameters that will be mapped out in rows and columns allowing the user to form the XY values to get the appropriate values. The algorithm will capture the values and extract the predefined characters that produce the OTP codes. This scheme can work in any information verification system to enhance the security, trust and confidence of the user.

양팔 클러스터장비의 초기 전이 기간 스케줄링 (Scheduling Start-up Transient Periods of Dual Armed Cluster Tools)

  • 홍경효;김자희
    • 한국시뮬레이션학회논문지
    • /
    • 제24권3호
    • /
    • pp.17-26
    • /
    • 2015
  • 생산성과 웨이퍼의 품질을 향상하기 위해 다양한 공정에서 사용되는 클러스터 장비는 단순한 구성에도 불구하고 병렬 공정모듈, 중간버퍼의 부재, 시간 제약 때문에 스케줄이 쉽지 않다. 그래서 스케줄링에 대한 많은 연구가 진행되었지만 대부분 시간이 변동되지 않는다는 가정 하에서 주기별로 동일한 스케줄이 반복되는 안정 상태를 연구하였다. 본 연구에서는 시간 제약을 만족시키면서도 원하는 안정 상태의 스케줄로 안착할 수 있는 스케줄 전략을 제시한다. 제안된 스케줄 전략은 작업시간이 지속적으로 변동되는 상황에서도 강건하다. 마지막으로 이 전략들이 실제로 강건하고, 원하는 안정 상태로 갈 수 있다는 것을 보여주기 위하여 시뮬레이션을 수행한다.

중복시험을 배제할 수 있는 사이버대학의 온라인 실시간 시험 시간표 작성 방안 (A Heuristic Approach for Establishing On-line Real-time Exam Timetables in Cyber Universities)

  • 박찬권;김형도;염지환
    • Journal of Information Technology Applications and Management
    • /
    • 제14권3호
    • /
    • pp.227-236
    • /
    • 2007
  • Students in cyber universities can take every course because there are no physical constraints such as class rooms. On the other hand. cyber universities should take a heavy burden to schedule real-time exams in a designated time period. Any two courses a student takes must not be simultaneously allocated to a time slot in such a schedule. It is well known that the complexity of this kind of scheduling problem increases exponentially as the number of courses does. This research provides a heuristic method to make on-line real-time exam timetables with minimal exam time span. It considers the constraint of not allocating courses a student takes to simultaneous exam time and prioritizes courses by the number of students.

  • PDF

화력발전소 원료 공급계획을 위한 휴리스틱 알고리즘 (A Heuristic Algorithm for Power Plant Coal Supply Planning Problems)

  • 김철연;문형근;최경현
    • 대한산업공학회지
    • /
    • 제37권2호
    • /
    • pp.132-143
    • /
    • 2011
  • This paper deals with a coal supply planning problem for power plants. We propose a mathematical optimization model to make decisions for coal pile sections, movement of reclaimers, and operation time of conveyor belts. The objective of the proposed model is to minimize the total operation time of conveyor belts and total movement time of reclaimers. The algorithm firstly selects a pile section by considering both the location of reclaimers and the stock amount on that pile section. And then the shortest path from the selected pile section has to be put into the operation schedule and check whether the total operation time is satisfied. Then finally the new schedule is updated. To this end, we have tested the proposed algorithm comparing with the general standard optimization package for the simplified problem SCSPP. From the numerous test runs for comparing with the existing coal supply scheduling methods, We see that the proposed model may improve the coal supply operation by reducing significant coal supply costs.

실시간요금제하에서 산업용 수용가의 부하제어알고리즘 개발 (Development of Industrial Load Control Algorithm for Factory Energy Management System (F-EMS) under Real Time Pricing Environment)

  • 전정표;장성일;김광호
    • 전기학회논문지
    • /
    • 제63권12호
    • /
    • pp.1627-1636
    • /
    • 2014
  • In real-time electricity price environment, the energy management system can provide the significant advantage to the residential, commercial and industrial customers since it can reduce the electricity charge by controlling the load operation effectively in response to time-varying price. However, the earlier studies for load management mainly focus on the residential and commercial customers except for the industrial customers because most of load operations in industrial sector are intimately related with production schedule. So, it is possible that the inappropriate control of loads in industrial sector causes huge economic loss. In this paper, therefore, we propose load control algorithm for factory energy management system(F-EMS) to achieve not only minimizing the electricity charges but also maintaining production efficiency by considering characteristics of load operation and production schedule. Considering characteristics of load operation and production schedule, the proposed load control algorithm can reflect the various characteristics of specific industrial customer and control their loads within the range that the production efficiency is maintained. Simulation results show that the proposed load control algorithm for F-EMS leads to significant reduction in the electricity charges and peak power in industrial sector.

Development of a Flash-based Schedule Management Tool for Smart Devices

  • Jang, Myunghoun
    • 한국건축시공학회지
    • /
    • 제12권6호
    • /
    • pp.558-565
    • /
    • 2012
  • Schedule management of construction work is critical to completing construction projects within a given period of time. Many efforts have been made and multiple tools have been developed to support the management of construction projects using smart devices such as smartphones and tablet PCs. This study proposed a method for managing construction schedules via a smart device using Flash. The interactive and graphic properties of Flash enable the development of an app that can allow a field manager to manage schedules easily and efficiently. A prototype was implemented using Adobe Flex Builder, and a sample network was applied in a smartphone. It is convenient for a construction manager to manage construction schedules using the tool because Flash controls graphic components easily. In further studies, network diagrams such as CPM (Critical Path Method) should be developed and applied to the app.