Effect of Inadequate Design on Cost and Time Overrun of Road Construction Projects in Tanzania

  • Rwakarehe, Eradius E.;Mfinanga, David A.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.15-28
    • /
    • 2014
  • Completing road construction projects within the budget and time has been a problem for the Tanzania National Roads Agency (TANROADS); and the major problem highlighted in almost all projects being inadequate design. However, the extent to which inadequate design contributes to both time and cost overruns and its causes remained under-studied. The objective of this study is therefore to determine the extent of the effect of inadequate design, its causes and remedial measures. The methodology used in this study includes reviewing recent projects completion reports, holding roundtable discussions with consultants and TANROADS officials and analyzing the information. Cost and time overruns for the reviewed projects averaged 44% and 26% respectively. Similarly, the extents to which inadequate design contributes to cost and time overruns were on average found to be 61% and 85% respectively. The overruns are predominantly related to problems that occurred during the design process. To alleviate the problem, TANROADS is advised to improve the management of design projects, enhance the process of reviewing design reports, improve the design process including introducing Road Safety Audit and geometric design manuals, and increase staff to match the work-load.

Identification of Factors Affecting Time and Cost Performance in Vietnam Construction Projects

  • Long, Le-Hoai;Lee, Young-Dai;Lee, Jun-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.728-731
    • /
    • 2007
  • In-planned duration and cost at project closing are the two of criteria of successful project and successful project management. In Vietnam, regularly, construction projects are delayed and their costs are overrun. This research employed a questionnaire survey to elicit the causes of this situation by interviewing 87 Vietnamese construction experts. After processing data, 21 causes of delay and cost overruns appropriate with building and industrial project in construction stage were inferred and ranked. Spearman's rank correlation tests showed that there're no differences in the viewpoints between parties in project.

  • PDF

A study of the factors affecting delay in apartment projects in Vietnam

  • Luu, Truong-Van;Kim, Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.718-721
    • /
    • 2007
  • Construction schedule plays a key role in project management due to its influence on the project success. Thus, it is important to identify factors affecting construction delay. The major objective of this study is to identify and evaluate factors affecting construction delay in apartment projects in Vietnam. The findings confirmed that financial difficulties of owners and contractors, contractors without adequate experience, non-available materials on time, slow site clearance, inappropriate construction methods, defective works and reworks, and lack of capable owners/project managers are the major causes of delay in apartment projects.

  • PDF

IMPROVING CONSTRUCTION PROJECT DELIVERY THROUGH AUTOMATION AND ROBOTICS

  • Jasper Mbachu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.237-241
    • /
    • 2009
  • Automation and robotic technology (ART) has been successfully applied in the manufacturing and allied industries to achieve on-time delivery of quality products at increasingly reduced costs. Meeting time, quality and cost targets still remains a big challenge in the global construction industry with prevalence of time and cost overruns. Application of ART in the construction industry could contribute to significant improvement in the efficient and effective delivery of projects to meet and exceed client expectations. However, the uptake of ART is still low in the construction industry. This study investigates the various ways in which ART could be applied to improve construction project delivery, potential areas of applications, and constraints to the uptake of the technology in the construction industry. Recommendations are made for improving the uptake of ART in the construction industry.

  • PDF

The Impact of Design-Bid-Build Procurement Methods on Project Performance in Libya

  • Ghadamsi, Alaeddin;Braimah, Nuhu
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.16-23
    • /
    • 2016
  • The use of inappropriate procurement methods to deliver construction projects has long been acknowledged as a major source of poor project performance and is particularly problematic for the Libyan Construction Industry. Poor procurement method selection has been recognised as a major contributory factor to frequent time and cost overruns. This paper offers a way of selecting specific procurement methods to maximize successful project performance. The methodology involves an intensive review of relevant literature, followed by a semi-structured questionnaire survey. The key findings of the study reveal that 11 out of its 12 common selection criteria exhibit a significant contribution to one or more project performance criteria (time, cost and quality). Project clients should therefore prioritise these criteria when selecting a design-bid-build method. Knowledge of the criteria that contribute positively to project performance will also enable clients to work out, prior to and during construction, the best measures and provisions for successful project outcomes.

Stakeholders' Perception of the Causes and Effects of Construction Delays on Project Delivery

  • Akinsiku, Olusegun Emmanuel;Akinsulire, Akintunde
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.25-31
    • /
    • 2012
  • The growing rate of delays is adversely affecting the timely delivery of construction projects. This study therefore assesses construction stakeholders' perception of the causes of delays and its effects on project delivery in a bid to proffer solution in minimizing the occurrences of delays. Questionnaire was used to elicit responses from construction stakeholders; a total of thirty three causes of delays, seventeen resultant effects of delays and fifteen methods of minimizing construction delays were identified for the study based on literature reviews. The results suggest that client's cash flow related problems are the main causes of delays while time and cost overruns are the major identifiable effects of delays in construction projects. However, adequate project planning and budgeting were suggested as possible ways of minimizing the occurrences of delays.

Global Trade Management Strategies for Export Companies from the Supply Chain Management Perspective (공급사슬관점에서 수출기업의 글로벌 무역관리 전략)

  • Yang, Jung-Ho
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.35
    • /
    • pp.179-219
    • /
    • 2007
  • Cross-border supply chains undergone complexity in the global trade process, unpredictability and continually evolving regulations and information requirements. Under these circumstances, longer lead time inhibiting quick response to market demands, unanticipated supply chain costs eroding product cost savings, compliance and documentation errors causing delays and fines are challenging global trade companies when they execute global business. These problems are mainly caused by unautomated, unintegrated process which lead to longer and more unpredictable lead times, slower cash flow, cost overruns, and ultimately lower profits and less satisfied customers. Complex and unpredictable global trade environment requires global trade companies of global trade management functions to automate and control this complex environment for driving out cost, time and risk from their business. Global trade management allows cost savings, supply chain efficiencies and improved compliance through improving global supply chain visibility, facilitating cash flow by supply chain financing, enhancing supply chain security and risk management.

  • PDF

Risk-Incorporated Trajectory Prediction to Prevent Contact Collisions on Construction Sites

  • Rashid, Khandakar M.;Datta, Songjukta;Behzadan, Amir H.;Hasan, Raiful
    • Journal of Construction Engineering and Project Management
    • /
    • v.8 no.1
    • /
    • pp.10-21
    • /
    • 2018
  • Many construction projects involve a plethora of safety-related problems that can cause loss of productivity, diminished revenue, time overruns, and legal challenges. Incorporating data collection and analytics methods can help overcome the root causes of many such problems. However, in a dynamic construction workplace collecting data from a large number of resources is not a trivial task and can be costly, while many contractors lack the motivation to incorporate technology in their activities. In this research, an Android-based mobile application, Preemptive Construction Site Safety (PCS2) is developed and tested for real-time location tracking, trajectory prediction, and prevention of potential collisions between workers and site hazards. PCS2 uses ubiquitous mobile technology (smartphones) for positional data collection, and a robust trajectory prediction technique that couples hidden Markov model (HMM) with risk-taking behavior modeling. The effectiveness of PCS2 is evaluated in field experiments where impending collisions are predicted and safety alerts are generated with enough lead time for the user. With further improvement in interface design and underlying mathematical models, PCS2 will have practical benefits in large scale multi-agent construction worksites by significantly reducing the likelihood of proximity-related accidents between workers and equipment.

Basic Study on the Measurement of Unit Productivity Data By Image Processing Technology (이미지 프로세싱을 활용한 생산성 정보 측정방안에 관한 연구)

  • Lee, Chan-Kyu;Lee, Seung-Hyun;Son, Jae-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.281-282
    • /
    • 2012
  • Construction performance and productivity improvement are key focus areas in construction industry for any nation. There have been frequent delays and cost overruns in construction projects and poor productivity is one of the major contributions. For this reasons, there have been many research studies performed on the improvement of construction productivity for several decades. However, measuring productivity on a construction job site is still not an easy work. Because collecting reliable data consistently from the job site requires a lot of personnel efforts causing extra time and cost. This paper provides a basic study on the application of image processing technology for measuring unit productivity. It presented the possibility of unit productivity measurement by image processing technology through case study.

  • PDF

Delays and its Analysis: Indian Residential Construction Projects

  • Metha, Rakesh L.;Gaikwad, Suraj V.
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.4
    • /
    • pp.20-28
    • /
    • 2017
  • In almost every construction project, delay is an inevitable yet controllable phenomenon. The Indian construction industry encounters an enormous amount of delays in projects. Delay affects both time and money in the forms of schedule and cost overruns, respectively. Due to impressive and dynamic growth in the Indian construction sector, planned efforts are essential to limit these undesirable delays. On account of the surge in the rate of residential building construction, the task of identification and analysis of the delays in residential projects in India has been attempted by the authors. A questionnaire survey was conducted involving 100 stakeholders. Further analysis included an Importance Index to rank the identified delays, Principle Component Analysis for advanced statistical analysis, and Correlation Analysis to check the extent of agreement amongst stakeholders. Conclusions drawn with reference to the analysed data eventually reflected finance-related issues, as well as labour related problems as the dominating causes of delays. The aim of the research is to provide insight to the construction stakeholders and researchers, on an international scale, with the obtained results.