• 제목/요약/키워드: time comparison

검색결과 9,257건 처리시간 0.04초

Duty Ratio Predictive Control Scheme for Digital Control of DC-DC Switching Converters

  • Sun, Pengju;Zhou, Luowei
    • Journal of Power Electronics
    • /
    • 제11권2호
    • /
    • pp.156-162
    • /
    • 2011
  • The control loop time delay caused by sampling, the zero-order-holder effect and calculations is inevitable in the digital control of dc-dc switching converters. The time delay will limit the bandwidth of the control loop and therefore degrade the transient performance of digital systems. In this paper, the quantization time delay effects with different time delay values based on a generic second-order system are analyzed. The conclusion that the bandwidth of digital control is reduced by about 20% with a one cycle delay and by 50% with two cycles of delay in comparison with no time delay is obtained. To compensate the time delay and to increase the control loop bandwidth, a duty ratio predictive control scheme based on linear extrapolation is proposed. The compensation effect and a comparison of the load variation transient response characteristics with analogy control, conventional digital control and duty ratio predictive control with different time delay values are performed on a point-of-load Buck converter by simulations and experiments. It is shown that, using the proposed technique, the control loop bandwidth can be increased by 50% for a one cycle delay and 48.2% for two cycles of delay when compared to conventional digital control. Simulations and experimental results prove the validity of the conclusion of the quantization effects of the time delay and the proposed control scheme.

열화데이터의 등분산 가정에 따른 저장수명예측 비교 연구 (Study for comparison of storage lifetimes estimation between constant and time-variant variance of degradation data)

  • 백승준;손영갑;박상현;이문호;강인식
    • 한국추진공학회:학술대회논문집
    • /
    • 한국추진공학회 2017년도 제48회 춘계학술대회논문집
    • /
    • pp.154-156
    • /
    • 2017
  • 종래에는 등분산 가정을 기반으로 가속열화시험 데이터로부터 저장수명을 예측하는 방식이 일반적이었다. 그러나, 실제로는 대부분의 탄약류의 특성치 데이터는 시간의 경과에 따라 산포가 증가한다. 따라서, 본 연구에서는 등분산과 이분산을 가정한 경우에 저장수명 예측 결과의 차이를 확인하고 향후 이분산 가정을 기반으로 데이터 분석을 수행함이 타당함을 제안한다.

  • PDF

3차원 모델을 위한 형상 유사성 평가 (Evaluation of shape similarity for 3D models)

  • 김정식;최수미
    • 정보처리학회논문지A
    • /
    • 제10A권4호
    • /
    • pp.357-368
    • /
    • 2003
  • 3차원 모델의 형상 유사성 평가는 의학, 기계 공학, 분자 생물학 등의 많은 분야에서 매우 중요하다. 더욱이 3차원 모델이 웹 상에 보편화됨에 따라 3차원 모델들의 분류와 검색에 관한 연구들이 활발하게 이루어지고 있다. 본 논문에서는 3차원 형상 표현 방법들과 유사성 평가에 대한 주요 개념들을 기술하고, 최근의 형상 비교에 관한 연구들을 다해상도, 위상 기하학, 2차원 영상, 통계학 기반 방법들로 분류하여 그 특징들을 분석하였다. 또한 논문에서 채택한 유일성, 강인성, 불변성, 다해상도, 효율성, 비교범위와 같은 기준을 사용하여 그 성능을 비교 평가하였다. 다해상도 기반 방법은 비교를 위한 계산 시간은 감소시킨 반면 전처리 시간은 증가시켰다. 기하 및 위상 정보를 이용한 방법은 보다 다양한 형태의 모델들을 비교할 수 있었고 부분적인 형상 비교에도 강인하였다. 2차원 영상을 이용한 방법들은 시간 및 공간 복잡도가 높게 나타났다. 통계학 기반 방법들은 포즈 정규화 작업 없이 형상 비교가 가능하였고, 어파인 변환 및 잡음에도 강인한 결과를 보였다.

실시간 하이브리드 실험법을 이용한 대형 MR감쇠기의 준능동 제어알고리즘 성능 비교 (Performance Comparison of Semi-active Control Algorithms for a Large-scale MR Damper using Real-time Hybrid Test Method)

  • 박은천;이성경;이헌재;최강민;문석준;정형조;정희산;민경원
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2007년도 추계학술대회논문집
    • /
    • pp.648-654
    • /
    • 2007
  • This paper presents the result of a comparison study to evaluate the performance of several semi-active control algorithms for use with large-scale MR damper applied to a building structure under seismic excitation using real-time hybrid test method. Recently, a variety of semi-active control algorithm studies are developed and generally evaluated the performance by using numerical analysis. In this paper real-time hybrid test method was applied to performance evaluating of semi-active control algorithms including a clipped optimal algorithm and the modulated homogeneous friction algorithm.

  • PDF

Global Finite-Time Convergence of TCP Vegas without Feedback Information Delay

  • Choi, Joon-Young;Koo Kyung-Mo;Lee, Jin S.;Low Steven H.
    • International Journal of Control, Automation, and Systems
    • /
    • 제5권1호
    • /
    • pp.70-78
    • /
    • 2007
  • We prove that TCP Vegas globally converges to its equilibrium point in finite time assuming no feedback information delay. We analyze a continuous-time TCP Vegas model with discontinuity and high nonlinearity. Using the upper right-hand derivative and applying the comparison lemma, we cope with the discontinuous signum function in the TCP Vegas model; using a change of state variables, we deal with the high nonlinearity. Although we ignore feedback information delay in analyzing the model of TCP Vegas, the simulation results illustrate that TCP Vegas in the presence of feedback information delay shows very similar dynamic trends to TCP Vegas without feedback information delay. Consequently, dynamic properties of TCP Vegas without feedback information delay can be used to estimate those of TCP Vegas in the presence of feedback information delay.

도시유역의 내수배제시스템 설계를 위한 유출특성분석 -SWMM의 적용- (Runoff Characteristics Analysis for Interior Drainage Systems in Urban Basin -Application of SWMM-)

  • 최윤영;이영화
    • 한국환경과학회지
    • /
    • 제9권3호
    • /
    • pp.193-199
    • /
    • 2000
  • This study is carried out the analysis of the runoff characteristics for the design of the interior drainage systems by SWMM in urbanization basin. The basin analyzed in this study is Bumuh-chun basin which is located in Susung-gu of Taegu city. Huff method is used for rainfall distribution analysis. The optimal rainfall duration in Bumuh-chun basin is analyzed as about 90 minutes decided from comparison of arrival time and critical duration. Flood flow variation pattern is proposed through the comparison of the results of peak flow and peak time analyzed by SWMM about pre-urbanization and post-urbanization of Bumuh-chun basin. It is known that the variation of arrival time caused by the rapid increase of pavement rate in the upper area shows about 20∼25 minutes faster than pre- urbanization. Therefore, the management of surface water for design of water supply and drainage, and channel alteration has to considered the variation of geological factors according to urbanization.

  • PDF

SSTDR에서 시간-주파수 상관을 활용한 저압 케이블의 고장 검출 (Fault Detection of Low Voltage Cable using Time-Frequency Correlation in SSTDR)

  • 전정채;김택희;유재근
    • 전기학회논문지
    • /
    • 제64권3호
    • /
    • pp.498-504
    • /
    • 2015
  • This paper proposed an Spread Spectrum Time Domain Reflectometry (SSTDR) using time-frequency correlation analysis in order to have more accurate fault determination and location detection than classical SSTDR despite increased signal attenuation due to the long distance to cable fault location. The proposed method was validated through comparison with classical SSTDR methods in open- and short-circuit fault detection experiments of low-voltage power cables. The experimental results showed that the proposed method can detect correlation coefficients at fault locations accurately despite reflected signal attenuation so that cable faults can be detected more accurately and clearly in comparison to existing methods.

COMPARISON OF PLASMA-INDUCED SURFACE DAMAGES IN VARIOUS PLASMA SOURCES

  • Yi, Dong-Hyen;Lee, Jun-Sik;Kim, Sang-Kyun;Kim, Jae-Jeong
    • 한국표면공학회지
    • /
    • 제29권5호
    • /
    • pp.338-344
    • /
    • 1996
  • This study was an investigation of plasma-induced damages on silicon substrate in the semiconductor manufacturing technology. The plasma-induced damage level on silicon substrate was analyzed and compared in various plasma etching systems. The analysis methods were therma wave, life-time recovery, SCA (Surface Charge Analyzer) and TRXF (Total Reflection X-ray Fluorescence) measurements, and the measured values were compared for each systems. In the comparison of the values which were obtained by a system that had low life-time recovery, there was not any differences in DC parameters. However, the reflesh time distribution of device of that system had decreased about 10 to 20m sec compared to a system which had high life-time recovery.

  • PDF

Performance Comparison of Parallel Programming Frameworks in Digital Image Transformation

  • Shin, Woochang
    • International Journal of Internet, Broadcasting and Communication
    • /
    • 제11권3호
    • /
    • pp.1-7
    • /
    • 2019
  • Previously, parallel computing was mainly used in areas requiring high computing performance, but nowadays, multicore CPUs and GPUs have become widespread, and parallel programming advantages can be obtained even in a PC environment. Various parallel programming frameworks using multicore CPUs such as OpenMP and PPL have been announced. Nvidia and AMD have developed parallel programming platforms and APIs for program developers to take advantage of multicore GPUs on their graphics cards. In this paper, we develop digital image transformation programs that runs on each of the major parallel programming frameworks, and measure the execution time. We analyze the characteristics of each framework through the execution time comparison. Also a constant K indicating the ratio of program execution time between different parallel computing environments is presented. Using this, it is possible to predict rough execution time without implementing a parallel program.

공급사슬 내의 재고관리를 위한 모의실험에 기초한 발견적 기법: 봉사척도 관점 (A Simulation-based Heuristic Algorithm for Determining a Periodic Order Policy at the Supply Chain: A Service Measure Perspective)

  • 박창규
    • 산업공학
    • /
    • 제13권3호
    • /
    • pp.424-430
    • /
    • 2000
  • Supply chain management (SCM) is an area that has recently received a great deal of attention in the business community. While SCM is relatively new, the idea of coordinated planning is not. During the last decades, many researchers have investigated multi-stage inventory problems. However, only a few papers address the problem of cost-optimal coordination of multi-stage inventory control with respect to service measures. Even published approaches have a shortcoming in dealing with a delivery lead time consisted of a shipping time and a waiting time. Assumed that there is no waiting time, or that the delivery lead time is implicitly compounded of a shipping time and a waiting time, the problem is often simplified into a multi-stage buffer allocation and a single-stage stochastic buffer sizing problem at all installations. This paper presents a simulation-based heuristic algorithm and a comparison with others for the problem that cannot be decomposed into a multi-stage buffer allocation and a single-stage stochastic buffer sizing problem because the waiting time ties together all stages. The comparison shows that the simulation-based heuristic algorithm performs better than other approaches in saving average inventory cost for both Poisson and Normal demands.

  • PDF