• 제목/요약/키워드: time and resource management

검색결과 1,089건 처리시간 0.027초

워크플로우 완료시간 최소화를 위한 실시간 자원할당 알고리즘 (A Real-time Resource Allocation Algorithm for Minimizing the Completion Time of Workflow)

  • 윤상흠;신용승
    • 산업경영시스템학회지
    • /
    • 제29권1호
    • /
    • pp.1-8
    • /
    • 2006
  • This paper proposes a real-time resource allocation algorithm for minimizing the completion time of overall workflow process. The jobs in a workflow process are interrelated through the precedence graph including Sequence, AND, OR and Loop control structure. A resource should be allocated for the processing of each job, and the required processing time of the job can be varied by the resource allocation decision. Each resource has several inherent restrictions such as the functional, geographical, positional and other operational characteristics. The algorithm suggested in this paper selects an effective resource for each job by considering the precedence constraint and the resource characteristics such as processing time and the inherent restrictions. To investigate the performance of the proposed algorithm, several numerical tests are performed for four different workflow graphs including standard, parallel and two series-parallel structures. In the tests, the solutions by the proposed algorithm are compared with random and optimal solutions which are obtained by a random selection rule and a full enumeration method respectively.

고층건축공사 적시생산을 위한 관리모델 사례 -콘크리트 자재의 Life Cycle을 중심으로- (A Conceptual Model Study For J.I.T(Just In Time) Construction Managemaent On High-rise Building-Concerned On Resource Life Cycle Of Concrete Construction-)

  • 송영석;임형철;최윤기
    • 한국건설관리학회논문집
    • /
    • 제2권4호
    • /
    • pp.127-134
    • /
    • 2001
  • 초고층 공사의 다양한 공정들을 정해진 시간내에 효율적으로 관리하기 위해서 최근 자재의 생산에서부터 현장반입, 설치에 이르는 자재 생애주기별 관리를 시스템화하고, 정보화하는 작업들이 많이 이루어지고 있다. 이러한 건설공사에서의 자재 적시생산 개념은 초고층평면의 다양화 및 각종 새로운 설비, 자재들의 적용으로 인해서 앞으로도 건설프로젝트 각 부문별로 다양하게 활용될 것으로 보인다. 이에 본 연구에서는 이러한 적시생산의 기법을 활용한 그동안의 사례들을 살펴보고, 이러한 사례들을 바탕으로 문제점 및 개선방안을 도출하여 자재의 생애주기(Life Cycle)을 고려한 현장 작업 흐름별 관리 포인트를 설정하여 적시생산 개념을 적용하는 연구를 수행하고자 한다. 현장의 활용가능성 및 적용을 통한 검증의 용이성, 또한 현장 내부의 양중 및 소운반에 대한 고려가 상대적으로 낮은 골조공사로 연구범위를 설정하여 콘크리트와 철근자재를 중심으로 연구를 진행하고자 한다. 이러한 골조공사에서의 적시생산(Just-In-Time) 개념 도입은 앞으로 커튼월, 가구공사, 창호공사, 철골 등의 부재로의 확대적용을 위한 방향성 제시를 함과 동시에 자재의 생애주기에 따른 정형화된 관리 운용 모델을 제시함으로서 건설공사의 최종적인 생산성 향상을 위한 도구로서 활용될 수 있음을 목적으로 한다.

  • PDF

부모 자녀 간 시간에 관한 규칙 유무에 따른 일본 중학생의 시간관리 행동 및 시간사용 자기평가의 차이 (The Difference between Time Management Practices and Self-evaluation of Time Use by Time Rules in Families, Focused on Middle School Students in Japan)

  • 이수진
    • 가족자원경영과 정책
    • /
    • 제19권4호
    • /
    • pp.55-70
    • /
    • 2015
  • This study aims to clarify the difference between scores for time management practice and the self-evaluation of time use according to time rules in families. This study used data obtained from the first survey on after-school activities in 2008, conducted by the Benesse Educational Research and Development Institute in Japan. The study sample consists of 3,372 middle school students. First, scores for independence and planning were highest in third grade, yet the score for regularity was also lowest in third grade. There will be different lifestyles even among middle school students of the same grade, so it is necessary to consider their characteristics and family rules. Second, the scores for independence, regularity and planning were lowest in groups whose families had rules about time (time rules for curfew, time rules for watching television, time rules for playing games), but in which those rules were not kept. These results were similar for both boys and girls and show that it is more important keep rules rather than to make rules.

생태관광 실천을 위한 자원관리시스템에 관한 연구 -일본 이리오모떼섬을 대상으로- (A Study on Nature Resource Management System for Ecotourism Practices)

  • 김현;가이즈 유리에
    • 한국환경복원기술학회지
    • /
    • 제5권6호
    • /
    • pp.64-71
    • /
    • 2002
  • This study aimed to provide data for establishment of resource management system of Iriomote Island in Okinawa Japan. Nature resource management system of Iriomote Island can be categorized into eight stages which are equivalent to regional development stages. 1) Networking among local people, tourists, researchers, tour operators and government authorities enhanced collection of resource data. 2) On the early stage, resource data were available only to researchers and government authorities. From the third stage of this system, however, local people were also involved in resource investigation, so they became to well recognize the values of their local resources. 3) On the sixth stage, data on unfamiliar local resources and attractions became to be known to people by real-time data collection and data provision services. The tourist number gradually increased and their visitation patterns were dispersed into different sites and seasons. In addition, some tourists also participated in resource investigation and they were likely to visit the place again. 4) To achieve successful ecotourism development, it is necessary to establish a management system with a feed-back process to identify, evaluate, use and protect the resources.

베이지안 규칙을 사용한 비즈니스 프로세스 관리 시스템에서의 인적 자원 배정 (Bayesian Selection Rule for Human-Resource Selection in Business Process Management Systems)

  • ;;김승;배혜림
    • 한국전자거래학회지
    • /
    • 제17권1호
    • /
    • pp.53-74
    • /
    • 2012
  • 본 연구에서는 비즈니스 프로세스 관리(Business Process Management, BPM) 환경에서 자원의 성능에 영향을 미치게 되는 여러 요소를 고려하여 인적자원을 선택하는 방법론을 개발한다. 스케줄링에 있어서 자원의 선택 문제는 작업 수행도에 직접적인 영향을 미치기 때문에 중요한 문제로 인식되어져 왔다. 비록 많은 문제에 있어서 전통적인 자원선택 방법론이 의미를 가져왔으나, 인적자원을 다루는데 있어서는 가장 좋은 방법론이라고 볼 수 없다. 인적자원은 작업부하, 작업소요시간, 작업간 시간 등의 다양한 요소에 의해서 영향을 받는 특이한 요소이며 본 연구는 이러한 다양한 요소를 고려하여 작업자를 선택하는 방법론을 제시한다. 이를 위해서 베이지안 네트워크를 사용하며, 앞서 기술한 여러 요소들을 한꺼번에 고려하기 위한 베이지안 선택규칙(Bayesian Selection Rule, BSR)을 도입하였다. 또한, 시뮬레이션을 통해서 본 연구에서 개발된 방법론이 대기시간, 작업수행시간과 사이클 타임을 줄일 수 있음을 보였다.

연구개발 프로젝트관리를 위한 시각화모델 (Dongeui Visual-PERT/CPM for R&D Project Management)

  • 황흥석
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2000년도 추계학술대회 및 정기총회
    • /
    • pp.268-271
    • /
    • 2000
  • In these days, the technical advances and complexities have generated much of the difficulties in managing the project resources, both time and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgements concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a two-step approaches :in the step 1, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning, In the second step, we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. Computer implementation of this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of visual graphical. Also developed GUI-type program, Dongeui Visual-PERT/CPM. The results of this research will provide the project managers with an efficient management tool.

  • PDF

교육과정 시기에 따른 중학교 가정교과서 가정관리분야 단원의 내용 변천 (Analysis of Changes in Contents of Home Management Part in Home Economics Textbooks for Middle School)

  • 이연숙
    • 가족자원경영과 정책
    • /
    • 제10권2호
    • /
    • pp.19-42
    • /
    • 2006
  • The purpose of this study is to analyze the changes in contents of home management part in the home economics textbooks fur middle school from the 1st to the 7th curriculum period. The contents in the all of home economics textbooks published in every curriculum period are analyzed. The major findings of this study are as follows: 1. The part of home management is divided into seven specific areas including 'definition and process of home management', 'utilization of family resource and environment management', 'time management', 'household labor/work nanagement', 'family financial management', 'purchasing', and 'consumer protection'. 2. From the 6th curriculum period, the area of 'definition and process of home management' begun to be explained using system's approach and the area of 'household labor/work management' changed its' focus from household to self management. 3. The areas emphasized in the beginning of curriculum period were 'family financial management' and 'household labor/work management'. The 'consumer protection' ' and 'utilization of family resource and environment management' were the areas emphasized in the later curriculum period. 4. The contents of 'family financial management' area have changed very little, however, the contents of 'purchasing' area have changed a lot during the all curriculum periods. 5. The contents of illustrations, tables, pictures, and activities have changed according to changes of the contents of the textbooks.

  • PDF

효율적인 자원 할당을 위한 사전 예약과 즉석 예약 간 공유 자원 관리 (Shared Resource Management Scheme in Advance and Immediate Reservations for Effective Resource Allocation)

  • 이동훈;김종원
    • 한국통신학회논문지
    • /
    • 제29권7B호
    • /
    • pp.685-696
    • /
    • 2004
  • 많은 양의 대역폭을 사용하는 실시간 멀티미디어 응용들은 일정 수준의 서비스 품질을 보장받기 위해 필요한 자원을 사전에 예약하고 이를 사용할 수 있어야 한다. 자원의 사전 예약을 위해서는 해당 자원에 대한 사용 기간의 명시와 이를 이용해 자원을 사전에 예약하고 할당하는 자원 관리자가 필요하다. 따라서 자원의 사용 기간에 관계없이 예약 요청 발생시점에서 가용 자원의 양만을 고려하는 전통적인 자원 할당 방식과는 달리 사전 예약을 제공하는 자원 관리자는 사전에 예약된 자원과 사용 기간을 명시하지 않는 즉석 예약을 위해 할당된 자원이 서로충돌하지 않도록 예약 요청들을 처리해야 한다. 일반적으로 자원 예약의 충돌은 예약 형태에 따라 할당 자원을 분리함으로써 해결할 수 있지만 이는 자원의 낭비를 초래하게 된다. 본 논문은 즉석 예약과 사전 예약 요청을 위해 준비된 자원 공간을 변동하는 자원 경계를 이용해 효율적으로 공유하는 자원 관리 방식을 제안한다. 제안하는 자원 관리 방식은 네트워크 비용 함수를 이용해 자원 간 경계를 설정하고, 예약 자원의 충돌에 따라 비용 함수의 가중치 변수를 조정해 경계를 변화시킴으로써 공유 자원을 효과적으로 할당하고 관리한다. 또한, 사용자 효용 함수의 정의를 통해 예약된 자원을 사용하는 서비스의 품질로부터 사용자가 얻는 효용을 정량적으로 측정하며, 자원의 사전 예약이 사용자 효용 및 전체 자원 활용에 미치는 영향을 고찰한다. 네트워크 시뮬레이터(NS-2)를 이용한 실험은 제안한 자원 관리 방식이 자원 공간의 고정 분할과 같은 방식과 비교해 높은 자원 활용율과 더불어 안정적인 서비스 품질을 제공할 수 있음을 보여준다.

한국기업에서 비정규직의 인적자원관리전략에 관한 탐색적 연구 (An Exploratory Study on the Human Resource Management Strategy of Non-Standard Workers in the Korean Companies)

  • 박민생
    • 경영과정보연구
    • /
    • 제24권
    • /
    • pp.73-75
    • /
    • 2008
  • The purpose of this study is to propose the human resource management strategies of non-standard workers that can contribute to accomplishing both corporate social responsibility and business purpose in efficient and effective ways. For the purpose, this researcher investigated circumstances under which Korean companies are using non-standard workers and systems related to those workers. In Korea, the Non-Standard Workers Protection Act was enacted and revised, and became effective on July 1, 2007. The main provisions of the act are as follows. First, the systems of discriminatory treatment prohibition was legally stipulated, Second, restrictions on overwork for fixed-term and part-time employees and the written statement of working conditions were compelled. Third, only 26 kinds of jobs were permitted for worker dispatch in accordance with positive list system. To achieve their business purpose, companies often use standard workers, but sometimes non-standard workers unavoidably in accordance with their business strategy. This study propose main human resource management strategies of non-standard workers such as determining the scope of jobs, strengthening legal and systematic human resource management, improving human relations, extending the grievance procedure and converting non-standard workers into standard ones.

  • PDF

Genetic Algorithm based Resource Management for Cognitive Mesh Networks with Real-time and Non-real-time Services

  • Shan, Hangguan;Ye, Ziyun;Bi, Yuanguo;Huang, Aiping
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제9권8호
    • /
    • pp.2774-2796
    • /
    • 2015
  • Quality-of-service (QoS) provisioning for a cognitive mesh network (CMN) with heterogeneous services has become a challenging area of research in recent days. Considering both real-time (RT) and non-real-time (NRT) traffic in a multihop CMN, [1] studied cross-layer resource management, including joint access control, route selection, and resource allocation. Due to the complexity of the formulated resource allocation problems, which are mixed-integer non-linear programming, a low-complexity yet efficient algorithm was proposed there to approximately solve the formulated optimization problems. In contrast, in this work, we present an application of genetic algorithm (GA) to re-address the hard resource allocation problems studied in [1]. Novel initialization, selection, crossover, and mutation operations are designed such that solutions with enough randomness can be generated and converge with as less number of attempts as possible, thus improving the efficiency of the algorithm effectively. Simulation results show the effectiveness of the newly proposed GA-based algorithm. Furthermore, by comparing the performance of the newly proposed algorithm with the one proposed in [1], more insights have been obtained in terms of the tradeoff among QoS provisioning for RT traffic, throughput maximization for NRT traffic, and time complexity of an algorithm for resource allocation in a multihop network such as CMN.