• Title/Summary/Keyword: the preliminary design phase

Search Result 137, Processing Time 0.024 seconds

A Study on the modeling of horizontal launch at submarine in the preliminary design phase (초기설계 단계에서의 잠수함 수평발사 모델링 연구)

  • Kim Dong-Hun
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.7 no.3 s.18
    • /
    • pp.38-46
    • /
    • 2004
  • This paper deals with the development of simulation model for the horizontal launch at submarines in the preliminary design phase. The simulation model is composed of submarine motion model, cross flow force model in the bow of submarine, and weapon motion model In launch through torpedo tubes. Using submarine and weapon characteristics and simulation condition, it can simulate the exit velocity of weapon through torpedo tubes and reaction forces. It should be helpful for the analysis of the safe launch and design requirements in the preliminary design phase of a submarine or a weapon launched through torpedo tubes.

Study on the Preliminary Design of ARGO-M Operation System

  • Seo, Yoon-Kyung;Lim, Hyung-Chul;Rew, Dong-Young;Jo, Jung-Hyun;Park, Jong-Uk;Park, Eun-Seo;Park, Jang-Hyun
    • Journal of Astronomy and Space Sciences
    • /
    • v.27 no.4
    • /
    • pp.393-400
    • /
    • 2010
  • Korea Astronomy and Space Science Institute has been developing one mobile satellite laser ranging system named as accurate ranging system for geodetic observation-mobile (ARGO-M). Preliminary design of ARGO-M operation system (AOS) which is one of the ARGO-M subsystems was completed in 2009. Preliminary design results are applied to the following development phase by performing detailed design with analysis of pre-defined requirements and analysis of the derived specifications. This paper addresses the preliminary design of the whole AOS. The design results in operation and control part which is a key part in the operation system are described in detail. Analysis results of the interface between operation-supporting hardware and the control computer are summarized, which is necessary in defining the requirements for the operation-supporting hardware. Results of this study are expected to be used in the critical design phase to finalize the design process.

Preliminary Design Conditions for a Thermally Actuated Refrigerator Based on the Vuilleumier Cycle (Vuilleumier 사이클로 작동되는 열구동 냉동기의 예비설계조건)

  • 유호선;강병하
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.16 no.12
    • /
    • pp.2358-2367
    • /
    • 1992
  • This paper deals with preliminary design conditions for a thermally actuated Vuilleumier refrigerator/heat pump. The previously reported approximate adiabatic analysis which is based on the 8-volume model makes it possible to evaluate exchanged heats per cycle as well as cyclic pressure, temperature and mass variation of each working volume. Calculated results reveal not only there exists an optimum value for the phase angle and the swept volume ratio maximizing a specific thermal output, but also design parameters can be determined independently of each other. Under a given combination of operating temperature levels, the optimum conditions for refrigeration are different from those for heat pumping and the differences between two operating modes become larger with decreasing the dead volume ratio. Both the optimum phase angle and the optimum swept volume ratio are increased asymptotically toward 0.5 pi and 1.0 respectively, as the dead volume ratio approaches to unity. When a VM machine is used for cooling and heating simultaneously, the design parameters should be carefully determined to reach the best performance.

A Study on Economics of Air Stripping Towers and Activated Carbon Adsorption(Multicomponent System) (충전탑 공기 스트리핑과 활성탄 흡착의 경제성에 관한 연구(다중성분계))

  • Yoo, Ho Sik
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.12 no.4
    • /
    • pp.33-42
    • /
    • 1998
  • The optimum design and preliminary cost estimations of air stripping towers ASTs with granular activated carbon adsorption (GAC) systems as the off-gas treatment were done and compared to liquid-phase GAC system. The optimum design and preliminary cost estimations were done for either single or multicomponent systems. A computer program was developed for this study. 15 single compounds and their multicomponent systems were studies. Even with off-gas treatment, AST was generally a less expensive process for treatment of volatile organics than liquid-phase GAC system. Treatment costs of small systems were sensitive to system capacity. Accumulative effect of treatment costs was found in multicomponent systems. The cost of a multicomponent system was highly dependent on the least strippable component in ASTs even with gas-phase GAC or the least adsorbable component in liquid-phase GAC system.

  • PDF

Aspects of Preliminary Probabilistic Safety Assessment for a Research Reactor in the Conceptual Design Phase (연구용원자로 기본설계에 대한 예비 확률론적 안전성 평가)

  • Lee, Yoon-Hwan
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.3
    • /
    • pp.102-110
    • /
    • 2019
  • This paper describes the work and results of the preliminary Probabilistic Safety Assessment (PSA) for a research reactor in the design phase. This preliminary PSA was undertaken to assess the level of safety for the design of a research reactor and to evaluate whether it is probabilistically safe to operate and reliable to use. The scope of the PSA described here is a Level 1 PSA which addresses the risks associated with core damage. After reviewing the documents and its conceptual design, eight typical initiating events are selected regarding internal events during the normal operation of the reactor. Simple fault tree models for the PSA are developed instead of the detailed model at this conceptual design stage. A total of 32 core damage accident sequences for an internal event analysis were identified and quantified using the AIMS-PSA. LOCA-I has a dominant contribution to the total CDF by a single initiating event. The CDF from the internal events of a research reactor is estimated to be 7.38E-07/year. The CDF for the representative initiating events is less than 1.0E-6/year even though conservative assumptions are used in reliability data. The conceptual design of the research reactor is designed to be sufficiently safe from the viewpoint of safety.

The Conceptual Cost Estimate Model on Preliminary Design Phase for RC Rahmen Bridge (RC라멘교의 기본설계단계 개략공사비 산정모델)

  • Kim, Byung-Soo;Kwon, Suk-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.111-120
    • /
    • 2009
  • The conceptual cost estimation used the construction project needs for confirm budget not only at the planning phase but also at the preliminary design phase of the construction project. Present, the conceptual cost estimation model have problems the rate of error is very large because the linear simple model calculate by use the cost of the unit meter or the unit square. This study development the model used grouping and the key quantity method, the mixed unit cost for solve problem of the very large rate of error. The result of this study reduced difference of between the real design construction cost therefor it expect that contribute to the client or the service company estimate budget of RC rahmen bridge.

Set-Based Multi-objective Design Optimization at the Early Phase of Design(The First Report) : Theory and Design Support System (초기 설계단계에서의 셋 베이스 다목적 설계 최적화(제1보) : 이론 및 설계지원 시스템)

  • Nahm, Yoon-Eui
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.2
    • /
    • pp.112-120
    • /
    • 2011
  • The early phase of design intrinsically contains multiple sources of uncertainty in describing design, and nevertheless the decision-making process at this phase exerts a critical effect upon drawing a successful design. This paper proposes a set-based design approach for multi-objective design problem under uncertainty. The proposed design approach consists of four design processes including set representation, set propagation, set modification, and set narrowing. This approach enables the flexible and robust design while incorporating designer's preference structure. In contrast to existing optimization techniques, this approach generates a ranged set of design solutions that satisfy changing sets of performance requirements.

New shipyard layout design for the preliminary phase & case study for the green field project

  • Song, Young Joo;Woo, Jong Hun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.5 no.1
    • /
    • pp.132-146
    • /
    • 2013
  • For several decades, Asian nations such as Korea, Japan and China have been leading the shipbuilding industry since the decline in Europe and America. However, several developing countries such as India, Brazil, etc. are going to make an entrance into the shipbuilding industry. These developing countries are finding technical partners or information providers because they are in situation of little experiences and technologies. Now, the shipbuilding engineering companies of shipbuilding advanced countries are getting a chance of engineering business against those developing countries. The starting point of this business model is green field project for the construction of new shipyard. This business model is started with a design of the shipyard layout. For the conducting of the shipyard layout design, four kinds of engineering parts are required. Those are civil engineering, building engineering, utility engineering and production layout engineering. Among these parts, production layout engineering is most important because its result is the foundation of the other engineering parts and it determines the shipyard capacity during the shipyard operation lifecycle. Previous researches about the shipyard layout design are out of the range from the business requirements because most research cases are in the tower of ivory, which means that there are little consideration of real ship and shipbuilding operation. In this paper, a shipyard layout design for preliminary phase is conducted for the target of newly planned shipyard at Venezuela of South America with an integrated method that is capable of dealing with actual master data from the shipyard. The layout design method of this paper is differentiated from the previous researches in that the actual product data from the target ship and the actual shipbuilding operation data are used for the required area estimation.

Study on the Impact-proof Internal Structure Design of a Spent Nuclear Fuel Transport Cask (내충격성을 고려한 사용후연료 수송용기 내부구조물의 설계 연구)

  • Shin, Tae-Myung;Kim, Kap-Sun
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.19 no.4
    • /
    • pp.370-377
    • /
    • 2009
  • A simple preliminary analysis is often useful to check a validity of design alternatives before the detailed analysis phase in the viewpoint of efficiency. This paper describes a preliminary analysis procedure for the selection among basket design candidates for the spent fuel shipping cask of Korean standard nuclear power plant. As the cask should maintain the structural integrity in hypothetical accident condition, the case of 9 m drop is significantly considered as the worst scenario among the accident conditions in structural design viewpoint in this paper. As basket design options, totally four different types are considered and analyzed in the point of structural integrity at drop impact and weldability for fabrication. As a result, an insertion round plate type with densely spaced supports turns out to be the best in both of the viewpoints, though the weld plate type shows a bit more design margin.

The Optimum Design Conditions of Stirling Engines Using The Ideal Adiabatic Model (이상적인 단열모델에 의한 스터링기관의 최적설계조건)

  • 유호선
    • Transactions of the Korean Society of Mechanical Engineers
    • /
    • v.14 no.3
    • /
    • pp.656-663
    • /
    • 1990
  • To investigate the optimum design conditions of Stirling Engines at the preliminary design stage, comparative study between adoabatoc analysis based on an approximate analytical solution to the Ideal Adiabatic Model and the existing isothermal analysis has been carried out. The optimum phase angle obtained from adiabatic analysis to achieve the maximum work with given combination of design parameters is greater than that from isothermal analysis, while the optimum swept volume ratio is smaller. Effect of variation in the temperature ratio on the work parameter is proved to be stronger in adiabatic analysis. On the contrary, the work parameter by adiabatic analysis is less sensitive to a change in the dead volume ratio. Especially in adiabatic analysis there exists the optimum dead volume ratio maximizing the work parameter, which may provide a lower limit of it. Considering that the adiabatic model is more reasonable, signifiant differences between two methods lead to the conclusion that adiabatic analysis is preferable to isothermal one for the preliminary design of Stirling Engines.