• Title/Summary/Keyword: the mixed unit cost

Search Result 45, Processing Time 0.025 seconds

The method for the classification according to their kinds and the estimation of unit generation rate for promoting recycling of construction and demolition(c&d) debris (건설폐기물 재활용촉진을 위한 종류별 분류 및 발생원단위 산정 방안)

  • Lee, Hi Sun;Kim, Dong Sik
    • Journal of the Society of Disaster Information
    • /
    • v.4 no.1
    • /
    • pp.86-100
    • /
    • 2008
  • It is needed to classify the kinds of construction and demolition(c&d) debris to 6 catagories of waste concrete, waste asphalt concrete, waste wood, scraps, combustible waste and incombustible waste in order to properly do a separate discharge and to estimate unit generation rate in construction site. Also, in this case, the unit treating cost for mixed wastes should be applied with the unit treating cost for combustible waste. The construction standard materials estimation data is used for basic data for estimating unit generation rate. The mixed wastes in this data should be classified to waste wood, combustible waste and incombustible waste, and their ratio is obtained by using the unit generation rate of Asia Pacific Environment and Management Institute and Seoul Metropolitan Development Institute. The waste amounts generated from newly-built construction can be obtained from multiplying the loss rate by the amount of materials used from construction standard estimation data. Also, those from dismantling construction can be obtained by subtracting waste amount generated during newly-built construction from total input amount of materials in newly-built construction. Those in two cases can be used in construction site. It can be used for estimating the amount generated and establishing the treating plan in the case of setting up the policy of waste management and doing the environment impact assessment.

  • PDF

A Mixed Integer Linear Programming Approach for the Profit Based Unit Commitment Problem under Non-Linear Fuel Consumption Constraint and Maintenance Cost (비선형 연료 제약 및 유지보수 비용을 고려한 Mixed Integer Linear Programming 기반 발전기 주간 운용계획 최적화)

  • Song, Sang-Hwa;Lee, Kyung-Sik
    • Korean Management Science Review
    • /
    • v.25 no.1
    • /
    • pp.43-53
    • /
    • 2008
  • This paper considers a profit-based unit commitment problem with fuel consumption constraint and maintenance cost, which is one of the key decision problems in electricity industry. The nature of non-linearity inherent in the constraints and objective functions makes the problem intractable which have led many researches to focus on Lagrangian based heuristics. To solve the problem more effectively, we propose mixed integer programming based solution algorithm linearizing the complex non-linear constraints and objectives functions. The computational experiments using the real-world operation data taken from a domestic electricity power generator show that the proposed algorithm solves the given problem effectively.

A Comparative Study on the Costs of Structural Materials Based on Different Types of Soil Load on Artificial Ground (인공지반에서 토양하중에 따른 건축구조물 골조원가의 비교연구)

  • 김도경;황지환
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.29 no.6
    • /
    • pp.72-81
    • /
    • 2002
  • The purpose of this study is to determine the impact of the soil load for artificial ground on a building's structural expenses. Three types of soil - 100% soil, soil mixed with 50% perlite, and 100% artificial soil - were used for this study. A one story concrete steel building specific to each soil load was designed, and then, the cost of steel and concrete used for the design was estimated. As the result of this study, the structural expenses in the case of 5:5 mixed soil can be reduced about 17% compare with 100% soil. Using artificial soil, the structural expenses can be cut about 32% compare to 100% soil and about 12% less when 5:5 mixed soil is used. However, considering total expense which includes the structural expense and soil expense, the expense of 5:5 mixed soil have an increase 25% compared with 100% soil. In the artificial soil, the total expense is 45% more expensive than 100% soil and 17% higher when 5:5 mixed soil is used because of the high unit price of artificial soil. This study expected substantial savings in structural cost as the soil-load was lightened. But, savings were significantly reduced because the unit price of the artificial soil is much more expensive than the price of the natural one. Therefore, further research on methods of reducing the unit price of the artificial soil should be conducted in order to extend green space on to artificial ground.

Daily Unit Commitment Scheduling of Power System with Energy Storage System (전력저장장치를 고려한 일간 최적 기동정지계획 수립연구)

  • Song, Ha-Na;Jang, Se-Hwan;Kim, Hyeong-Jung;Roh, Jae-Hyung;Park, Jong-Bae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.4
    • /
    • pp.717-725
    • /
    • 2011
  • In the power system with an electric storage system that can increase utilization rate of the source of such new renewable energy, this paper introduces the approach on the daily unit commitment scheduling that determines simultaneously optimum operational condition and output of thermal generators and electric storage device. The unit commitment is one of the most important issues in economic operation and security of short-term operational plan of the power system. It is to determine on/off status of generator to minimize operational cost during the given period. The committed generator should satisfy various operational limitation such as estimated demand by system, spinning reserve condition within minimum operational cost. In order to determine on/off or charge/discharge/idle condition and output level of units and electric storage system, the MILP(Mixed Integer Linear Programming) is suggested. The proposed approach is the mixed method between LP(Linear Programming) and IP(integer programming) which seeks the value of real number and integer that maximize or minimize function objective within given condition. The daily unit commitment problem with the electric storage system is applied to MILP algorithm through linearization and formulation process. The proposed approach is applied to the test system.

The Conceptual Cost Estimate Model on Preliminary Design Phase for RC Rahmen Bridge (RC라멘교의 기본설계단계 개략공사비 산정모델)

  • Kim, Byung-Soo;Kwon, Suk-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.111-120
    • /
    • 2009
  • The conceptual cost estimation used the construction project needs for confirm budget not only at the planning phase but also at the preliminary design phase of the construction project. Present, the conceptual cost estimation model have problems the rate of error is very large because the linear simple model calculate by use the cost of the unit meter or the unit square. This study development the model used grouping and the key quantity method, the mixed unit cost for solve problem of the very large rate of error. The result of this study reduced difference of between the real design construction cost therefor it expect that contribute to the client or the service company estimate budget of RC rahmen bridge.

Analysis on Unit-Commitment Game in Oligopoly Structure of the Electricity Market (전력시장 과점구조에서의 발전기 기동정지 게임 해석)

  • 이광호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.11
    • /
    • pp.668-674
    • /
    • 2003
  • The electric marketplace is in the midst of major changes designed to promote competition. No longer vertically integrated with guaranteed customers and suppliers, electric generators and distributors will have to compete to sell and buy electricity. Unit commitment (UC) in such a competitive environment is not the same as the traditional one anymore. The objective of UC is not to minimize production cost as before but to find the solution that produces a maximum profit for a generation firm. This paper presents a hi-level formulation that decomposes the UC game into a generation-decision game (first level game) and a state(on/off)-decision game (second level game). Derivation that the first-level game has a pure Cournot Nash equilibrium(NE) helps to solve the second-level game. In case of having a mixed NE in the second-level game, this paper chooses a pure strategy having maximum probability in the mixed strategy in order to obviate the probabilistic on/off state which may be infeasible. Simulation results shows that proposed method gives the adequate UC solutions corresponding to a NE.

Optimal Scheduling in Power-Generation Systems with Thermal and Pumped-Storage Hydroelectric Units

  • Kim, Sehun;Rhee, Minho
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.15 no.1
    • /
    • pp.99-115
    • /
    • 1990
  • This paper is concerned with the unit commitment problem in an electric power system with both thermal and pumped-storage hydroelectric units. This is a mixed integer programming problem and the Lagrangean relaxation method is used. We show that the relaxed problem decomposes into two kinds of subproblems : a shortest-path problem for each thermal unit and a minimum cost flow problem for each pumped-storage hydroelectric unit. A method of obtaining an incumbenet solution from the solution of a relaxed problem is presented. The Lagrangean multipliers are updated using both subgradient and incremental cost. The algorithm is applied to a real Korean power generation system and its computational results are reported and compaired with other works.

  • PDF

Stochastic Programming Approach to Scheduling Elective Surgeries and the Effects of Newsvendor Ratio on Operating Room Utilization (추계적 계획법을 이용한 수술실 예약 모델과 Newsvendor 비율의 자원 효율성에 대한 영향 분석)

  • Min, Dai-Ki
    • Korean Management Science Review
    • /
    • v.28 no.2
    • /
    • pp.17-29
    • /
    • 2011
  • The purpose of this paper is to schedule elective surgery patients using a stochastic programming approach and to illustrate how operating room utilization behaves when a decision-maker varies costs associated with utilization. Because of the uncertainty in surgery durations, the underage and overage costs that a decision-maker considers plays an important role in allocating surgery cases into available operating room capacity. We formulate the problem as a stochastic mixed integer programming and propose a sampling-based approximation method for a computational purpose. Newsvendor model is employed to explain the results from numerical experiments that are conducted with the actual data from a hospital. The results show that the operating room utilization is more sensitive when the unit overtime cost is relatively larger than the unit cost for underutilized time.

A Study on the Bi-level Genetic Algorithm for the Fixed Charge Transportation Problem with Non-linear Unit Cost (고정비용과 비선형 단위운송비용을 가지는 수송문제를 위한 이단유전알고리즘에 관한 연구)

  • Sung, Kiseok
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.41 no.4
    • /
    • pp.113-128
    • /
    • 2016
  • This paper proposes a Bi-level Genetic Algorithm for the Fixed Charge Transportation Problem with Non-linear Unit Cost. The problem has the property of mixed integer program with non-linear objective function and linear constraints. The bi-level procedure consists of the upper-GA and the lower-GA. While the upper-GA optimize the connectivity between each supply and demand pair, the lower-GA optimize the amount of transportation between the pairs set to be connected by the upper-GA. In the upper-GA, the feasibility of the connectivity are verified, and if a connectivity is not feasible, it is modified so as to be feasible. In the lower-GA, a simple method is used to obtain a pivot feasible solution under the restriction of the connectivity determined by the upper-GA. The obtained pivot feasible solution is utilized to generate the initial generation of chromosomes. The computational experiment is performed on the selected problems with several non-linear objective functions. The performance of the proposed procedure is analyzed with the result of experiment.

Optimal Road Maintenance Section Selection Using Mixed Integer Programming (혼합정수계획법을 활용한 도로포장 보수구간 선정 최적화 연구)

  • Cho, Geonyoung;Lim, Heejong
    • International Journal of Highway Engineering
    • /
    • v.19 no.3
    • /
    • pp.65-70
    • /
    • 2017
  • PURPOSES : Pavement Management System contains the data that describe the condition of the road. Under limited budget, the data can be utilized for efficient plans. The objective of this research is to develop a mixed integer program model that maximizes remaining durable years (or Lane-Kilometer-Years) in road maintenance planning. METHODS : An optimization model based on a mixed integer program is developed. The model selects a cluster of sectors that are adjacent to each other according to the road condition. The model also considers constraints required by the Seoul Metropolitan Facilities Management Corporation. They select two lanes at most not to block the traffic and limit the number of sectors for one-time construction to finish the work in given time. We incorporate variable cost constraints. As the model selects more sectors, the unit cost of the construction becomes smaller. The optimal choice of the number of sectors is implemented using piecewise linear constraints. RESULTS : Data (SPI) collected from Pavement Management System managed by Seoul Metropolitan City are fed into the model. Based on the data and the model, the optimal maintenance plans are established. Some of the optimal plans cannot be generated directly in existing heuristic approach or by human intuition. CONCLUSIONS:The mathematical model using actual data generates the optimal maintenance plans.