• 제목/요약/키워드: the cost of capital

검색결과 711건 처리시간 0.026초

Measuring Economic Externalities of IT and R&D

  • Rim, Myung-Hwan;Cho, Sang-Sup;Moon, Choon-Geol
    • ETRI Journal
    • /
    • 제27권2호
    • /
    • pp.206-218
    • /
    • 2005
  • We measure and compare externalities of IT and R&D capital stocks in different Korean industry sectors using inter-industry input-output tables of 1985, 1990, 1995 and 2000. We also compute the multiplier effects that relate to the directions of future economic effects. The key findings are as follows. First, we observed continuous capital deepening in all nine industries over the period of 1985 to 2000. Second, the backward multipliers of IT capital were the highest in the manufacturing industry. As for inter-industry externalities, the indirect backward multipliers, which exclude intra-industry backward multiplier effects within the industry, were also the highest in the manufacturing industry. Third, the forward multiplier effects of IT capital stock were the most substantial in the construction industry during the 1980s and in the manufacturing industry thereafter. Finally, using the transition multiplier matrix reflecting the backward effects of the two capitals in the past, the economic backward effects, especially the external economic effects, are predicted to increase through 2010 among all industries. The above findings suggest that, in order to maximize the forward and backward effects of the ever-increasing IT capital, we need to formulate an industry policy reducing the cost of capital accumulation in the manufacturing industry through improvement in productivity of the IT industry.

  • PDF

Capital Structure and Its Determinants: Evidence from Vietnam

  • NGUYEN, Tan Gia;NGUYEN, Lan;NGUYEN, Tuan Duc
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제8권10호
    • /
    • pp.1-10
    • /
    • 2021
  • This paper attempts to investigate the determinants of capital structure of Vietnamese firms and also shed light on some of the factors of the modern theory of capital structure which is relevant for explaining the capital structure in advanced countries which are also relevant in the context of Vietnam. Using panel data from more than 1000 Vietnamese listed enterprises census 2017-2020, the paper finds that leverage ratio of Vietnamese firms is significantly related to probability. The firms have high level of fixed assets which they use as collateral, resulting in higher debt ratio, which is in line with the pecking order theory. The result also confirm that highly targeted debt ratio is positively correlated with the industry characteristics (using real estate firms as a benchmark), in which firm operates. Furthermore, consistent with the trade-off hypothesis, the leverage ratio is positively affected by non - debt tax shield. The result confirms that a large number of companies are state - owned, will have an insignificant impact of firm's size (as reverse proxy for bankruptcy cost) on leverage ratio. We also find that there is no distinction between state-owned enterprises and private enterprises due to strict adherence to the rules set by the Vietnamese government. Distinct from other countries, corporate income tax has slight impact on capital structure in Vietnamese firms.

육계 건물 및 시설에 대한 투자 분석 (A Normative Analysis on Broiler Farm investment in Korea)

  • 김정주
    • 한국축산시설환경학회지
    • /
    • 제3권1호
    • /
    • pp.49-56
    • /
    • 1997
  • Most of Korean broiler farms are constructed with vinyl houses. Such types of broiler farms might be cheaper in terms of cost, but poor in terms of environment condition. According to enlargement of broiler farm size, high value production systems or automatic facilities are introduced in this field. However, investment may not always guarantee the profit of the management. Therefore, it is necessary to undertake the investment analysis before decision making for the investment. Under the assumption that 870 Pyoung(≒$3.3㎡) of a broiler farm within 1,740 Pyoung(≒3.3㎡) of land is built with the producing capacity of 50,000 heads of chicken in a time. The total investment is calculated to be 600 million won(1,000 won≒$1.1), and out of them 58.1% is provided by the owner, 31.6% from the government loan, 5.8% from government subsidy, and 5.3% from other agencies or banks. The expected profit of the broiler farm is 64.6 million won(1,000 won≒$1.1) per year. The IRR calculated is 0.0808 which means that the rate to profit of this project would be 8.1%. This also means that for this investment the interest rate of the capital provided should be less than 8.1% per year. Considering that the current opportunity cost of the own capital is 8.5% this project is not so attractive for those who is going to build broiler farms mainly with their own capital. In other words this project would not be profitable, unless the average interest rate of the loans provided for this project is less than 8.1% per year.

SOC 자본스톡 추계에 있어서 수익적 지출과 자본적 지출의 적합 분배 (An Appropriated Share between Revenue Expenditure and Capital Expenditure in Capital Stock Estimation for Infrastructure)

  • 조진형;이세재;오현승;권정훈;정남용;김명수
    • 산업경영시스템학회지
    • /
    • 제41권2호
    • /
    • pp.153-158
    • /
    • 2018
  • At the Bank of Korea, capital stock statistics were created by the PIM (perpetual inventory method) with fixed capital formation data. Asset classifications also included 2 categories in residential buildings, 4 non-residential buildings, 14 constructions, 9 transportation equipment, 28 machinery, and 2 intangible fixed assets. It is the Korean government accounting system which is developed much with the field of the national accounts including the valuation, but until 2008 it was consistent with single-entry bookkeeping. Many countries, including Korea, were single-entry bookkeeping, not double-entry bookkeeping which can be aggregated by government accounting standard account. There was no distinction in journaling between revenue and capital expenditure when it was consistent with single-entry bookkeeping. For example, we would like to appropriately divide the past budget accounts and the settlement accounts data that have been spent on dredging into capital expenditure and revenue expenditure. It, then, tries to add the capital expenditure calculated to FCF (fixed capital formation), because revenue expenditure is cost for maintenance etc. This could be a new direction, especially, in the estimation of capital stock by the perpetual inventory method for infrastructure (SOC, social overhead capital). It should also be noted that there are differences not only between capital and income expenditure but also by other factors. How long will this difference be covered by the difference between the 'new series' and 'old series' methodologies? In addition, there is no large difference between two series by the major asset classification level. If this is treated as a round-off error, this is a problem.

우리나라의 낙농단지규모에 알맞는 사료가공시설의 모델개발(I) -TMR 터미널의 모델 개발- (Development of Farm Size Dairy Feedmill System in Korea(I) -Development of the TMR Terminal-)

  • 박경규;김태욱
    • Journal of Biosystems Engineering
    • /
    • 제19권4호
    • /
    • pp.329-342
    • /
    • 1994
  • In order to reduce the production cost and improve the quality of dairy feed, several dairy feed mill models suitable for Korean farm size were developed. 6 TMR models were developed for the 1000, 600, 200 head of dairy cattle, and evaluated for capital investments and production costs to suggest the best model. Followings are summary of this study : 1. TMR terminal models were designed that dairy production capacity of TMR1000 models are 40 ton/day, TMR600 model is 20 ton/day and TMR200 models are 10 ton/day. Also, they can be extended their capacity up to twice. 2. Capital investment of TMR terminal models is 145 million won for TMR200-1,205 million won for TMR600 and 609 million won for TMR1000-3 model. 3. The bigger TMR terminal model has the more advantage in production cost. The best model for 1000 head of dairy cattle farm was TMR1000-3 with 10,849 won/ton of production cost, TMR600 for 600 head of dairy cattle farm with 13,829 won/ton, TMR200-1 for 200 head of dairy cattle farm with 16,943 won/ton of production cost, so feed production cost for the 200 head farm was 50% higher than 1,000 head size farm.

  • PDF

자본구조의 관성과 상품시장 경쟁간의 관계 (Capital Structure Inertia and Product Market Competition)

  • 최칠선;손판도;이상은;김상현
    • 국제지역연구
    • /
    • 제21권2호
    • /
    • pp.143-169
    • /
    • 2017
  • 본 논문에서는 1981년부터 2015년까지 거래소에 상장된 비-금융기업을 대상으로 자본구조의 관성이 어떻게 산업 간에 차이가 존재하며 이러한 차이가 상품시장 경쟁에 의해 설명될 수 있는지를 실증검증 한다. 본 논문의 실증분석 결과는 '보다 경쟁적 산업에 속하는 기업일수록 자본구조의사결정에 보다 더 관성적으로 하는 경향이 있다'는 것이다. 이러한 결과는 부채의 규율효과에 의해 설명되며, 상품시장경쟁에 대한 대체재로서 기여한다고 할 수 있다. 상품시장 경쟁이 낮을 때, 경영자는 자본구조의사결정과 관련하여 보다 능동적으로 의사결정을 하며 특히 잉여현금 흐름문제를 제약하기 위하여 부채를 사용한다는 것이다. 더욱이 거래비용이 얼마나 설명력이 있는지를 조사하며 자본구조관성에 대한 일반적인 설명이 되는지 파악한다. 본 논문의 결과는 기업의 자본구조에 관성현상이 존재하지만 미국 기업들만큼은 강하지 않았다. 둘째, 이러한 관성효과는 상품시장경쟁과의 관계를 통하여 강하게 나타나지만, OLS 추정모형에서 관성효과가 사라지는 현상이 나타났다. 이러한 결과는 거래비용이 자본구조의 관성을 설명하는 데 중요한 역할을 하지 않는다는 증거로 해석될 수 있다.

Economic analysis of thorium extraction from monazite

  • Salehuddin, Ahmad Hayaton Jamely Mohd;Ismail, Aznan Fazli;Bahri, Che Nor Aniza Che Zainul;Aziman, Eli Syafiqah
    • Nuclear Engineering and Technology
    • /
    • 제51권2호
    • /
    • pp.631-640
    • /
    • 2019
  • Thorium ($^{232}Th$) is four times more abundant than uranium in nature and has become a new important source of energy in the future. This is due to the ability of thorium to undergo the bombardment of neutron to produce uranium-233 ($^{233}U$). The aim of this study is to investigate the production cost of thorium oxide ($ThO_2$) resulted from the thorium extraction process. Four main parameters were studied which include raw material and chemical cost, total capital investment, direct cost and indirect cost. These parameters were justified to obtain the final production cost for the thorium extraction process. The result showed that the raw material costs were $63,126.00 - $104,120.77 (0.5 ton), $126,252.00 - $178,241.53 (1.0 ton), and $1,262,520.00 - $1,782,415.33 (10.0 tons). The total installed equipment and total cost investment were estimated to be approximately $11,542,984.10 and $13,274,431.715 respectively. Hence, the total costs for producing 1 kg $ThO_2$ were $6829.79 - $6911.78, $3540.95 - $3592.94, and $501.18 - $553.17 for 0.5, 1.0, and 10.0 tons respectively. The result concluded that with higher mass production, the cost of 1 kg $ThO_2$ would be reduced which in this scenario, the lowest production cost was $$501.18kg^{-1}$-$$553.17kg^{-1}$ for 10.0 tons of $ThO_2$ production.

Techno-economic Analysis of Power to Gas (P2G) Process for the Development of Optimum Business Model: Part 1 Methane Production

  • Roy, Partho Sarothi;Yoo, Young Don;Kim, Suhyun;Park, Chan Seung
    • 청정기술
    • /
    • 제28권2호
    • /
    • pp.182-192
    • /
    • 2022
  • This study provides an overview of the production costs of methane and hydrogen via water electrolysis-based hydrogen production followed by a methanation based methane production technology utilizing CO2 from external sources. The study shows a comparative way for economic optimization of green methane generation using excess free electricity from renewable sources. The study initially developed the overall process on the Aspen Plus simulation tool. Aspen Plus estimated the capital expenditure for most of the equipment except for the methanation reactor and electrolyzer. The capital expenditure, the operating expenditure and the feed cost were used in a discounted cash flow based economic model for the methane production cost estimation. The study compared different reactor configurations as well. The same model was also used for a hydrogen production cost estimation. The optimized economic model estimated a methane production cost of $11.22/mcf when the plant is operating for 4000 hr/year and electricity is available for zero cost. Furthermore, a hydrogen production cost of $2.45/GJ was obtained. A sensitivity analysis was performed for the methane production cost as the electrolyzer cost varies across different electrolyzer types. A sensitivity study was also performed for the changing electricity cost, the number of operation hours per year and the plant capacity. The estimated levelized cost of methane (LCOM) in this study was less than or comparable with the existing studies available in the literature.

Revisiting Social Discount Rates for Public Investment

  • SONG, JOONHYUK
    • KDI Journal of Economic Policy
    • /
    • 제39권2호
    • /
    • pp.75-98
    • /
    • 2017
  • This paper aims to estimate the social discount rate (SDR) rather than dig into its theoretical foundation. As SDRs can be derived by investigating both the rate of return on investment and the social time preference rate, we estimate the marginal productivity of both private and public capital and the time preference rate based on the Euler equation. In order to provide a single representative SDR, the weighted averages of the marginal productivity and time preference rate, whose weights are determined by the flow of funds data reflecting the social demand of funds, are presented. Based on the empirical results, we argue that the marginal productivity of private capital stands in the middle of the 3% range while that of public capital varies from 4.5% to 8.6%, with the time preference rate showing a decreasing trend from 3.2% in the early 2000s to 1.2% by around 2030. The single representative SDR or the weighted SDR is estimated to be approximately 3.0~4.5% and expected to continue its downward trend for the foreseeable future.

An Optimal Design of Paddy Irrigation Water Distribution System

  • Ahn, Tae-Jin;Park, Jung-Eung
    • Korean Journal of Hydrosciences
    • /
    • 제6권
    • /
    • pp.107-118
    • /
    • 1995
  • The water distribution system problem consists of finding a minimum cost system design subject to hydraulic and operation constraints. The design of new branchin network in a paddy irrigation system is presented here. The program based on the linear programming formulation is aimed at finding the optimal economical combination of two main factors : the capital cost of pipe network and the energy cost. Two loading conditions and booster pumps for design of pipe network are considered to obtain the least cost design.

  • PDF