• Title/Summary/Keyword: the Operation Schedule

Search Result 413, Processing Time 0.034 seconds

Analysis of Saving Rates according to Energy Consumption Factors in Office Building (사무소 건물의 에너지 소비 요소별 절감률 분석)

  • Park, Byung-Il;Yang, In-Ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.28 no.3
    • /
    • pp.115-122
    • /
    • 2016
  • In this study, 21 energy reduction factors were selected as architecture, system & operation, and lighting and equipment parts to analyze reduction method of the load occurring in office buildings. Energy consumption simulation was performed. In the architecture part, saving rate (1.53%) of "occupant density" factor was the most efficient. In the system and operation part, saving rate (1.28%) of "interior VAV and exterior FPU type" factor was the most efficient. In case of lighting and equipment part, saving rate (12.42%) of "schedule" factor was the most efficient. In the three parts, saving rate of the lighting and equipment part was 27.32%. This was caused by the "schedule" factor. Saving rates of the architecture part and the system and operation part were 3.39% and 1.20%, respectively.

A study of control system on Permanent Magnet Linear Synchronous Motor with Z-axis operation structure (Z축 운전구조를 갖는 선형 영구자석형 동기 전동기 운전제어에 관한 연구)

  • Lee C.H.;Choi C.;Park H.W.;Kim C.U.
    • Proceedings of the KIPE Conference
    • /
    • 2003.07b
    • /
    • pp.654-658
    • /
    • 2003
  • In this study a control system with variable gain schedule using real speed and moving direction is proposed to control a Permanent Magnet Linear Synchronous Motor (PMLSM) with Z-axis operation structure. The implementation of the controller is designed on the DSP TMS320C32 board. PMLSM is operated by using 4-point absolute positions profile with each velocity, acceleration and deceleration. The direction of the initial angle action for starting is set from the lower limit point to the upper limit point on PMLSM operation stroke. The effectiveness of a control system with variable gain schedule is demonstrated by some experimental results.

  • PDF

Development of the annual power generation schedule package for various generation type system(I) (다양한 발전원 계통에서의 연간발전계획 전산화 시스템 개발(I))

  • Chu, Jin-Boo;Jeon, Dong-Hoon;Kim, Sung-Hak;Yoon, Sang-Hyun;Kim, Hoi-Cheol
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.707-710
    • /
    • 1996
  • This paper is to build and develop the generation schedule program to provide a stable power supply and economic operation of power generation system. A practical algorithm is presented for solving the thermal unit commitment problem which is one of very important areas in economic operation of power system. This algorithm is based on priority ordering by the unit generation cost and it is shown that the operation cost of chosen sets of generators is the minimum. The proposed method is proven to be very practical, accurate and efficient in a KEPCO system.

  • PDF

Development of Rollgap Simulator and Its Application to Draft Schedule Adjustment (롤갭 시뮬레이터의 개발과 패스스케쥴 개선)

  • Ahn Jaehwan;Lee Youngho;Lee In-Woo
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2004.08a
    • /
    • pp.163-172
    • /
    • 2004
  • A fast, accurate model for calculating roll gap variables are critical to the implementation of computer based automation systems for cold rolling mills. Based on the work of Fleck and Johnson, rollgap simulator with non-circular arc model was developed using the influence function. This developed model is capable of predicting values of force, torque and slip which can be applied over the wide range of rolling conditions including cold rolling/DR/temper mill with high execution speed. Friction coefficient was obtained as a function of operation conditions through analyzing measured data. After combination of rollgap simulator with production strategy, draft schedule for No.3 RCM (Reversible Cold Rolling Mill) in Incheon works of Dongbu Steel was developed. This draft schedule will be installed in the setup computer of No.3 RCM replacing old Hitachi model.

  • PDF

A Stochastic Simulation Model for Estimating Activity Duration of Super-tall Building Project

  • Minhyuk Jung;Hyun-soo Lea;Moonseo Park;Bogyeong Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.397-402
    • /
    • 2013
  • In super-tall building construction projects, schedule risk factors which vertically change and are not found in the low and middle-rise building construction influence duration of a project by vertical attribute; and it makes hard to estimate activity or overall duration of a construction project. However, the existing duration estimating methods, that are based on quantity and productivity assuming activities of the same work item have the same risk and duration regardless of operation space, are not able to consider the schedule risk factors which change by the altitude of operation space. Therefore, in order to advance accuracy of duration estimation of super-tall building projects, the degree of changes of these risk factors according to altitude should be analyzed and incorporated into a duration estimating method. This research proposes a simulation model using Monte Carlo method for estimating activity duration incorporating schedule risk factors by weather conditions in a super-tall building. The research process is as follows. Firstly, the schedule risk factors in super-tall building are identified through literature and expert reviews, and occurrence of non-working days at high altitude by weather condition is identified as one of the critical schedule risk factors. Secondly, a calculating method of the vertical distributions of the weather factors such as temperature and wind speed is analyzed through literature reviews. Then, a probability distribution of the weather factors is developed using the weather database of the past decade. Thirdly, a simulation model and algorithms for estimating non-working days and duration of each activity is developed using Monte-Carlo method. Finally, sensitivity analysis and a case study are carried out for the validation of the proposed model.

  • PDF

Development of optimal algorithm for PV-ESS integrated system by 3 Dimensional Dynamic Programming (3차원 동적계획법에 의한 PV-ESS 연계형 시스템의 최적운용 알고리즘 개발)

  • Choi, You-Rim;Lim, Tae-Hun;Jung, Jea-Hoon;Kim, Yong-Ha
    • Journal of IKEEE
    • /
    • v.23 no.3
    • /
    • pp.1027-1032
    • /
    • 2019
  • In this paper, we had developed an algorithm that can cope with all the economic variables that may occur in the operation of PV-ESS system by developing the algorithm for the operation method of PV-ESS connected system. Based on this, the optimal operation schedule of PV-ESS was decided to minimize the electric charges of customers. Through this, we developed a three-dimensional dynamic planning method based on case generation to determine the optimal PV-ESS operation schedule stably even when exogenous variables change.

Dispatching Rule based Job-Shop Scheduling Algorithm with Delay Schedule for Minimizing Total Tardiness (지연 스케쥴을 허용하는 납기최소화 잡샵 스케쥴링 알고리즘)

  • Kim, Jae-Gon;Bang, June-Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.1
    • /
    • pp.33-40
    • /
    • 2019
  • This study focuses on a job-shop scheduling problem with the objective of minimizing total tardiness for the job orders that have different due dates and different process flows. We suggest the dispatching rule based scheduling algorithm to generate fast and efficient schedule. First, we show the delay schedule can be optimal for total tardiness measure in some cases. Based on this observation, we expand search space for selecting the job operation to explore the delay schedules. That means, not only all job operations waiting for process but also job operations not arrived at the machine yet are considered to be scheduled when a machine is available and it is need decision for the next operation to be processed. Assuming each job operation is assigned to the available machine, the expected total tardiness is estimated, and the job operation with the minimum expected total tardiness is selected to be processed in the machine. If this job is being processed in the other machine, then machine should wait until the job arrives at the machine. Simulation experiments are carried out to test the suggested algorithm and compare with the results of other well-known dispatching rules such as EDD, ATC and COVERT, etc. Results show that the proposed algorithm, MET, works better in terms of total tardiness of orders than existing rules without increasing the number of tardy jobs.

Mixed Operation with Express Train for Urban Railways in Seoul Metropolitan Area (대피선 설치를 통한 수도권 광역철도 급행화 방안)

  • Son, Gi-Min
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.5
    • /
    • pp.195-207
    • /
    • 2007
  • The urban railways connecting between the inner city and suburb of Seoul metropolitan area, has lost the competitiveness against cars because too many stops deteriorated operating speed and passenger's level of service. This paper suggests that an express train should be introduced into the urban railway system in order to sort out such a complication. There are two considerations in the present study. Firstly, train schedule problem should be taken into account. In this regard, a new model for urban railway system was developed by revising the existing models dealing with single line freight railway. Approximate branch and bound algorithm based on conflict group rather than a single conflict was adopted. Consequently, it was found that the time saving in calculating the optimal schedule is the most meaningful contribution of the algorithm. The second consideration is associated with the application of the model. A case study was carried out using the actual operation data from Ansan line. In conclusion, the operation speed of the line can increase considerably with minimal number of new sidings.

A Study on the Development of Domestic-Oriented Prototype for EVMS Operation System by Using Work Task (작업관리 개념을 응용한 EVMS 운영 시스템 프로토타입 개발)

  • Park, Hong-Tae;Yang, Keum-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.6
    • /
    • pp.1281-1286
    • /
    • 2009
  • Our government operates earned value management system (EVMS)of construction schedule and cost for improving earned management system of the construction projects. but There is two unification Method construction schedule and cost to estimate construction progress currently. This weight a staff work. therefore this study present unification method which operate integrate schedule and cost by using work task. In order to inflect verification and model of schedule and cost, this study develop prototype of EVMS.

A Study of Optimal Operation of Sewage Treatment Plants Using NLP (비선형계획법을 이용한 수도권 하수처리장의 최적운영에 관한 연구)

  • 김중훈;윤용남
    • Water for future
    • /
    • v.29 no.4
    • /
    • pp.131-138
    • /
    • 1996
  • The objective of this study is to develop an optimal operation model for the sewage treatment plants using nonlinear programming (NLP) technique and the QUAL2E model. The model finds the minimum-cost operation of sewage treatment plants while satisfying all design constraints and water quality (BOD) standard. The model is applied to four sewage treatment plants in Han River for the city of Seoul. It has been found that optimal operation schedule for the sewage treatment plants can be computed and it is more economic to operate the plants according to the schedule which satisfies the water quality constraints in the river. In addition, the water quality in the river can be predicted using the model under the treatment policy.

  • PDF