• 제목/요약/키워드: the Han River Estuary

검색결과 172건 처리시간 0.024초

농업생산기반 정비사업의 산업연관효과분석 -황락 저수지지구를 중심으로- (Analysis of Industrial Linkage Effects for Farm Land Base Development Project -With respect to the Hwangrak Benefited Area with Reservoir -)

  • 임재환;한석호
    • 농업과학연구
    • /
    • 제26권2호
    • /
    • pp.77-93
    • /
    • 1999
  • This study is aiming at identifying the foreward and backward lingkage effects of the farm land base development project. Korean Government has continuously carried out farmland base development projets including the integrated agricultural development projects. large and medium scale irrigation projects and the comprehensive development of the four big river basin including tidal land reclamation and estuary dam construction for the all weather farming since 1962. the starting year of the five year economic development plans. Consequently the irrigation rate of paddy fields in Korea reached to 75% in 1998 and to escalate the irrigation rate, the Government had procured heavy investment fund from IBRD. IMF and OECF etc. To cope with the agricultural problems like trade liberalization in accordance with WTO policy, the government has tried to solve such problems as new farmland base development policy, preservation of the farmland and expansion of farmland to meet self-sufficiency of foods in the future. Especially, farmland base development projects have been challanged to environmental and ecological problems in evaluating economic benefits and costs where the value of non-market goods have not been included in those. Up to data, in evaluating benefits and costs of the projects, farmland base development projects have been confined to direct incremental value of farm products and it's related costs. Therefore the projects'efficiency as a decision making criteria has shown the low level of economic efficiencies. In estimating economic efficiencies including Leontiefs input-output analysis of the projects could not be founded in Korea at present. Accordingly this study is aimed at achieving and identifying the following objectives. (1) To identify the problems related to the financial supports of the Government in implementing the proposed projects. (2) To estimated backward and foreward linkage effects of the proposed project from the view point of national economy as a whole. To achieve the objectives, Hwangrak benefited area with reservoir which is located in Seosan-haemi Disticts, Chungnam Province were selected as a case study. The main results of the study are summarized as follows : a. The present value of investment and O & M cost were amounted to 3,510million won and the present value of the value added in related industries was estimated at 5.913million won for the period of economic life of 70 years. b. The total discounted value of farm products in the concerned industries derived by the project was estimated at 10,495million won and the foreward and backward linkage effects of the project were amounted to 6,760 and 5,126million won respectively. c. The total number of employment opportunities derived from the related industries for the period of project life were 3,136 man/year. d. Farmland base development projects were showed that the backward linkage effects estimated by index of the sensitivity dispersion were larger than the forward linkage effect estimated by index of the power of dispersion. On the other hand, the forward linkage effect of rice production value during project life was larger than the backward linkage effect e. The rate of creation of new job opportunity by means of implementing civil engineering works were shown high in itself rather than any other fields. and the linkage effects of production of the project investment were mainly derived from the metal and non-metal fields. f. According to the industrial linkage effect analysis, farmland base development projects were identified economically feasible from the view point of national economy as a whole even though the economic efficiencies of the project was outstandingly decreased owing to delaying construction period and increasing project costs.

  • PDF

지하방수로 설계를 위한 적정 위치선정 및 규모 결정에 관한 연구 (A Study on the Determination of Optimal Location and Size for Underground Sluiceway Design)

  • 이종태;임택선;허성철;박상식
    • 한국방재학회 논문집
    • /
    • 제8권5호
    • /
    • pp.137-145
    • /
    • 2008
  • 이 연구는 계획규모를 초과하는 홍수량으로 인하여 예상되는 하천범람피해를 경감하기 위한 지하방수로 계획에서의 적정 위치선정 및 규모를 결정하기 위한 기초분석기술에 대한 것으로서, 1998년과 2001년에 집중호우로 일부제방의 범람 및 붕괴에 의해 막대한 손실이 발생한 중랑천을 대상으로 하였다. 지하방수로의 유입부 위치는 200년 빈도홍수에 취약한 서울시경계, 당현천 합류부, 월계 1교, 묵동천 합류부의 4곳을 후보지로 선정하였고, 유출부는 국공유지로서 사용이 가능한 중랑천하구부와 한강의 반포대교 우안부을 선정하였다. 유입부의 월류고별 횡월류량을 산정하고 홍수저감효과를 분석하였다. 검토결과, 유입부의 위치는 당현천 합류부가 적정한 것으로 판단되었는바, 이곳에 지하방수로 유입부를 설치하였을 때 홍수저감효과가 가장 큰 것으로 나타났다. 지하방수로의 적정규모검토를 위해 방류구 운영규칙을 단순저류, 일정률, 일정량, 일정률+일정량의 혼합방류의 4가지 방식을 기본으로 하는, 총 8가지 경우를 적용하여 비교 분석하였다. 200년 규모의 홍수에 대응하는 지하방수로의 적정규모를 검토한 결과 방수로의 크기는 단순저류(Rule D)일때 가장 큰 규모인 직경 12 m로 분석되었고, 일정률 방류(Rule E)에서는50%방류에서 직경 9 m, 일정량 방류(Rule F)에서는 직경 8 m, 일정량 + 일정률 방류(Rule G)의 경우는 직경 7 m로 각각 산정하였다. 이 연구에서 제시한 검토과정은 하천제방의 범람으로 연안의 침수피해가 막대할 것으로 예상되는 경우에 EAP 차원에서의 방수로 건설 계획에 유용할 것으로 판단된다. 또한, 중랑천 방수로를 건기시에는 서울시와 의정부지역을 연결하는 지하 도로로 활용하는 방안을 함께 고려함으로써 방수로의 활용성을 크게 증대시킬 수 있을 것으로 판단된다.