• Title/Summary/Keyword: test system

Search Result 26,837, Processing Time 0.066 seconds

Design and Verification of Mission Equipment Package System for Korean Utility Helicopter (한국형 기동헬기 임무탑재장비체계 설계 및 입증)

  • Kim, Sung-Woo;Lee, Byoung-Hwa;Yu, Yeon-Woon;Lee, Jong-Hoon;Yim, Jong-Bong
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.14 no.3
    • /
    • pp.388-396
    • /
    • 2011
  • Mission Equipment Package(MEP) system is a collection of avionic components that are integrated to perform the mission of the Korean Utility Helicopter(KUH). MEP system development is classified mission-critical embedded system but KUH MEP system developed including flight-critical data implementation. It is important to establish the good development and verification process for the successful system development. This paper describe the development and verification process in each phase for the KUH MEP system. MEP system design is verified through the qualification test, system failure test and compatibility test in System Integration Laboratory(SIL).

On an Enhanced Model of System Readiness Level by Incorporating Safety for the Development of Live Fire Test Systems (실사격 시험시스템의 효율적인 개발을 위해 안전도 반영을 통해 개선된 시스템 성숙도 모델에 관한 연구)

  • Ye, Sung Hyuck;Lee, Jae-Chon
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.195-204
    • /
    • 2015
  • The live fire test has been playing a critical role in evaluating the goals-to-meet of the weapon systems which utilize the power of explosives. As such, the successful development of the test systems therein is quite important. The test systems development covers that of ranges and facilities including system-level key components such as mission control, instrumentation or observation, safety control, electric power, launch pad, and so on. In addition, proper operational guidelines are needed with well-trained test and operation personnel. The emerging weapon systems to be deployed in future battle field would thus have to be more precise and dynamic, smarter, thereby requiring more elaboration. Furthermore, the safety consideration is becoming more serious due to the ever-increasing power of explosives. In such a situation, development of live fire test systems seems to be challenging. The objective of the paper is on how to incorporate the safety and other requirements in the development. To achieve the goal, an architectural approach is adopted by utilizing both the system components relationship and safety requirement when advanced instrumentation technology needs to be developed and deteriorated components of the range are replaced. As an evaluation method, it is studied how the level of maturity of the test systems development can be assessed particularly with the safety requirement considered. Based on the concepts of both systems engineering and SoS (System-of-Systems) engineering process, an enhanced model for the system readiness level is proposed by incorporating safety. The maturity model proposed would be helpful in assessing the maturity of safety-critical systems development whereas the costing model would provide a guide on how the reasonable test resource allocation plan can be made, which is based on the live fire test scenario of future complex weapon systems such as SoS.

A review of ATP Onboard System's Test procedure (열차방호장치(ATP) 차상설비 시험절차에 대한 고찰)

  • Chang, Seok-Gahk;Kim, Jin-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1163-1168
    • /
    • 2008
  • Automatic Train Protection(ATP) System is developed by ETCS(European Train Control System) CONSORTIUM for unify Europe railway system. ATP system is composed of Eurobalise and EuroATC. Nowadays, Korea construct ATP system in conventional line and new electrical locomotives also install ATP system. It is important to verify quality which form checklist during Factory Acceptance Test at beyond the seas. In this paper, review the process, test item, norm and checklist for the Balise Transmission Module, Compact Antenna Unit, Vehicle Control Unit and Communication Controller at the Plymouth Bombardier and Vasteras enics factory.

  • PDF

Full Scale Airframe Static Test of 4 Seater Canard Airplane (4인승 선미익 경항공기 전기체 정적 구조시험)

  • Shin, Jeong-Woo;Kim, Sung-Chan;Kim, Sung-Jun;Chae, Dong-Chul;Lee, Sang-Wook;Kim, Tae-Uk;Shim, Jae-Yeul
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.9 no.4
    • /
    • pp.15-23
    • /
    • 2006
  • In this paper, full-scale airframe static test of 4-seater canard airplane(the Firefly) was explained. From the results of the structural analysis, 5 design limit loads test conditions and 11 design ultimate loads test conditions were selected. Test loads analysis was performed and test fixtures and load control system(LCS) were prepared to realize the test loads. To protect the test article during the test, the overload protection system was prepared. Strain and deflection values were acquired through the data acquisition system(DAS) to verify the structural analysis results.

Introduction to Daegwallyeong Wind Turbine Test Site and Field Test Study (대관령 풍력실증단지 및 실증연구 소개)

  • Yoo Neung-Soo;Nam Yun-Soo;Lee Jung-Wan
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.5-8
    • /
    • 2005
  • This paper aims to introduce the Daegwallyeong wind turbine test site which is the first official wind turbine test site in Korea. The current status of test site, the characteristics, the projects performed and future plan of this test site are described. The results of wind condition measurements and monitoring system established by the Kangwon National University are presented. The importance of field test is also commented.

  • PDF

Instrumentation technology for flight test (비행시험 계측기술에 관한 연구)

  • 황명신
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1993.10a
    • /
    • pp.460-465
    • /
    • 1993
  • The instrumentation system is the most important aspect of a flight test program. It is the means by which the objective of a flight test, the production of accurate, useful data, is achieved. An instrumentation system consists of everything required to sense, condition, and record all parameters of interest The task of a flight test engineer is to select a system that is adequate to obtain all needed data, but not complex, expensive, and heavy than the situation demands. In this paper, the primary factors that determine the design of an instrumentation system are discussed.

  • PDF

Verification of Hi9h Impedance Fault Relay through Low Voltage Power System Implementation (저압모의계통 구성을 통한 고저항지락사고 검출용 계전기의 실계통 적응성 검증)

  • Hong, Sun-Chun;Jang, Byung-Tae;Yoo, Heung-Jun
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1437-1439
    • /
    • 1999
  • This paper describes test method though low voltage power system implementation for high impedance fault relay test before its operation in real power system. Through this test, relay tested its function and algorithm. In this paper, we will provides test method using low voltage power system and its results.

  • PDF

Micro computer-controlled automatic test method for automotive brake system (Micro computer를 이용한 자동차용 brake 시험 자동화 system에 대한 고찰)

  • 정화영
    • Journal of the korean Society of Automotive Engineers
    • /
    • v.9 no.5
    • /
    • pp.6-18
    • /
    • 1987
  • Owing to remarkable development in automotive industry, vehicle performance comes close to perfection and guarantee of stability is getting emphasized in accordance with high speed trend in vehicle. In recent years, the utilization of automatic test method for research and development of automotive brake system is being propelled actively, which pursue whole automatic control from simple measurement to data acquisition. The main subject of this paper is to make a brief explanation on Micro computer controlled Automatic Test Method for Automotive Brake System which makes it possible to test with high accuracy and speed.

  • PDF

Design and Development of Shaker for Acceleration test of Gimbal (김발의 가속도 시험용 Shaker의 설계 및 개발)

  • Yoon, Jae-Youn
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.18 no.1
    • /
    • pp.147-153
    • /
    • 2001
  • This paper proposes a shaker system design for acceleration test of gimbal. Main reason of shaker system design is to give acceleration to the gimbal, which is moving and tracking the target on the tracking test equipment. The shaker system is mounted on the tracking test equipment. It uses the scotch yoke mechanism to have the constant movement in return. The Scotch yoke mechanism changes the rotational movement of constant velocity to simple harmonic motion.

  • PDF

A Study on the Implementation of Protocol Conformance Test System on LAN and the Conformance Test for CCITT No.7 TCAP (LAN을 이용한 적합성 시험 시스템의 구현과 No.7 TCAP에의 적용에 관한 연구)

  • 윤재일;노승환;조현준;김덕진
    • Journal of the Korean Institute of Telematics and Electronics A
    • /
    • v.29A no.8
    • /
    • pp.18-25
    • /
    • 1992
  • Given a protocol specification, the task of testing whether an implementation conforms to the specification is called conformance testing. In this paper, the design and implementation of the protocol conformance test system using LAN on heterogeneous systems is descreibed. The test sequence used in this test system is generated using an algorithm on the basis of multiple UIO. The usability of this test system as an application was confirmed by performing the conformance test on the CCITT No.7 TCAP(transaction capabilities application part), implemented by ISDN Laboratory, Korea University in 1990.

  • PDF