• Title/Summary/Keyword: tensioned anchors

Search Result 4, Processing Time 0.016 seconds

Seismic Performance Improvement of Concrete Gravity Dam by Post-tensioned Anchors (앵커공법을 적용한 기존 콘크리트 중력식 댐의 내진성능 보강방안)

  • Kim, Yongon;Kim, Se-Il;Ok, Seung-Yong
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.5
    • /
    • pp.49-53
    • /
    • 2013
  • This paper describes the assessment of seismic performance of the concrete gravity dam seismically reinforced by post-tensioned anchors. In order to evaluate the seismic performance, the response spectrum analyses have been carried out for 7 different configurations of the post-tensioned anchors, and then their performance improvement in the maximum tensile and compressive stresses is compared to each other. The comparative results demonstrate that the layout of the post-tensioned anchors strongly influences the seismic performance of the concrete gravity dam. In this study, the slightly-inclined vertical anchorage system shows the largest improvement on the overall performance of the seismically-excited concrete gravity dam.

Theoretical determination of stress around a tensioned grouted anchor in rock

  • Showkati, Alan;Maarefvand, Parviz;Hassani, Hossein
    • Geomechanics and Engineering
    • /
    • v.8 no.3
    • /
    • pp.441-460
    • /
    • 2015
  • A new theoretical approach for analysis of stress around a tensioned anchor in rock is presented in this paper. The solution has been derived for semi-infinite elastic rock and anchor and for plane strain conditions. The method considers both the anchor head bearing plate and its grouted bond length embedded in depth. The solution of the tensioned rock anchor problem is obtained by superimposing the solutions of two simpler but fundamental problems: A distributed load applied at a finite portion (bearing plate area) of the rock surface and a distributed shear stress applied at the anchor-rock interface along the bond length. The solution of the first problem already exists and the solution of the shear stress distributed along the bond length is found in this study. To acquire a deep understanding of the stress distribution around a tensioned anchor in rock, an illustrative example is solved and stress contours are drawn for stress components. In order to verify the results obtained by the proposed solution, comparisons are made with finite difference method (FDM) results. Very good agreements are observed for the teoretical results in comparison with FDM.

Repair of seismically damaged RC bridge bent with ductile steel bracing

  • Bazaez, Ramiro;Dusicka, Peter
    • Steel and Composite Structures
    • /
    • v.26 no.6
    • /
    • pp.745-757
    • /
    • 2018
  • The inclusion of a ductile steel bracing as means of repairing an earthquake-damaged bridge bent is evaluated and experimentally assessed for the purposes of restoring the damaged bent's strength and stiffness and further improving the energy dissipation capacity. The study is focused on substandard reinforced concrete multi-column bridge bents constructed in the 1950 to mid-1970 in the United States. These types of bents have numerous deficiencies making them susceptible to seismic damage. Large-scale experiments were used on a two-column reinforced concrete bent to impose considerable damage of the bent through increasing amplitude cyclic deformations. The damaged bent was then repaired by installing a ductile fuse steel brace in the form of a buckling-restrained brace in a diagonal configuration between the columns and using post-tensioned rods to strengthen the cap beam. The brace was secured to the bent using steel gusset plate brackets and post-installed adhesive anchors. The repaired bent was then subjected to increasing amplitude cyclic deformations to reassess the bent performance. A subassemblage test of a nominally identical steel brace was also conducted in an effort to quantify and isolate the ductile fuse behavior. The experimental data from these large-scale experiments were analyzed in terms of the hysteretic response, observed damage, internal member loads, as well as the overall stiffness and energy dissipation characteristics. The results of this study demonstrated the effectiveness of utilizing ductile steel bracing for restoring the bent and preventing further damage to the columns and cap beams while also improving the stiffness and energy dissipation characteristics.

Behavior of simple precast high-strength concrete beams connected in the maximum bending moment zone using steel extended endplate connections

  • Magdy I. Salama;Jong Wan Hu;Ahmed Almaadawy;Ahmed Hamoda;Basem O. Rageh;Galal Elsamak
    • Steel and Composite Structures
    • /
    • v.50 no.6
    • /
    • pp.627-641
    • /
    • 2024
  • This paper presents an experimental and numerical study to investigate the behavior of the precast segmental concrete beams (PSCBs) utilizing high-strength concrete (HSC) connected in the zone of the maximum bending moment using steel extended endplate connections (EECs). The experimental study consisted of five beams as follows: The first beam was the control beam for comparison, which was an unconnected one-piece beam made of HSC. The other four other beams consisted of two identical pieces of precast concrete. An important point to be noted is that at the end of each piece, a steel plate was used with a thickness of 10 mm. Moreover, this steel plate was welded to the lower and upper reinforcing bars of the beam. Furthermore, the steel plate was made to connect the two pieces using the technique of EECs. Several variables were taken in these four beams, whether from the shape of the connection or enhancing the behavior of the connection using the post-tensioning technique. EECs without stiffeners were used for some of the tested beams. The behavior of these connections was improved using stiffeners and shear bolts. To get accurate results, a comparison was made between the behaviors of the five beams. Another important point to be noted is that Abaqus and SAP2000 programs were used to investigate the behavior of PSCBs and to ensure the accuracy of the modeling process which showed a good agreement with the experimental results. Additionally, the simplified modeling using SAP2000 was able to model the nonlinear behavior of PSCBs connected using steel EECs. It was found that the steel pre-tensioned bolted EECs, reinforced with steel stiffeners and shear anchors, could be used to connect the precast HSC segmental beams via the internal pre-stressing technique.