• Title/Summary/Keyword: technology risk

Search Result 4,862, Processing Time 0.042 seconds

A Risk Classification Based Approach for Android Malware Detection

  • Ye, Yilin;Wu, Lifa;Hong, Zheng;Huang, Kangyu
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.11 no.2
    • /
    • pp.959-981
    • /
    • 2017
  • Existing Android malware detection approaches mostly have concentrated on superficial features such as requested or used permissions, which can't reflect the essential differences between benign apps and malware. In this paper, we propose a quantitative calculation model of application risks based on the key observation that the essential differences between benign apps and malware actually lie in the way how permissions are used, or rather the way how their corresponding permission methods are used. Specifically, we employ a fine-grained analysis on Android application risks. We firstly classify application risks into five specific categories and then introduce comprehensive risk, which is computed based on the former five, to describe the overall risk of an application. Given that users' risk preference and risk-bearing ability are naturally fuzzy, we design and implement a fuzzy logic system to calculate the comprehensive risk. On the basis of the quantitative calculation model, we propose a risk classification based approach for Android malware detection. The experiments show that our approach can achieve high accuracy with a low false positive rate using the RandomForest algorithm.

The Effect of Risk-Based Efficiency Value on Firm Value: A Case Study in Indonesia

  • JUNIAR, Asrid;FADAH, Isti;UTAMI, Elok Sri;PUSPITASARI, Novi
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.5
    • /
    • pp.231-239
    • /
    • 2021
  • The purpose of this study is to analyze the effect of risk efficiency, financial decisions, and financial performance on firm value due to advances in financial reporting technology. This research was conducted on all banking sub-sector companies listed on the Indonesian capital market during a period of eight years, namely 2012-2019 which were selected using the purposive sampling method. The advancement of financial reporting technology is measured by two indicators based on the Internet financial reporting approach. Risk efficiency is measured using three indicators with a risk proxy relative efficiency approach using value at risk. Financial decisions are measured by two indicators that represent funding decisions and investment decisions. Financial performance is measured by two indicators with the profitability approach, and firm value is measured by two indicators based on the investor perception approach. The data analysis technique in this study used multivariate analysis with SEM-PLS. The empirical findings of this study are the advances in financial reporting technology, financial decisions, and risk-based efficiency value have a significant effect on firm value, while financial performance does not have a significant effect on firm value. Banking companies reduce risk to achieve efficiency and result in lower profits.

Secure and Resilient Framework for Internet of Medical Things (IoMT) with an Effective Cybersecurity Risk Management

  • Latifah Khalid Alabdulwahhab;Shaik Shakeel Ahamad
    • International Journal of Computer Science & Network Security
    • /
    • v.24 no.5
    • /
    • pp.73-78
    • /
    • 2024
  • COVID-19 pandemic outbreak increased the use of Internet of Medical Things (IoMT), but the existing IoMT solutions are not free from attacks. This paper proposes a secure and resilient framework for IoMT, it computes the risk using Risk Impact Parameters (RIP) and Risk is also calculated based upon the Threat Events in the Internet of Medical Things (IoMT). UICC (Universal Integrated Circuit Card) and TPM (Trusted Platform Module) are used to ensure security in IoMT. PILAR Risk Management Tool is used to perform qualitative and quantitative risk analysis. It is designed to support the risk management process along long periods, providing incremental analysis as the safeguards improve.

Risk Analysis of Ammonia Leak in the Refrigeration Manufacturing Facilities (냉동제조 시설의 암모니아 누출사고 위험 분석)

  • Kang, Su-Jin;Lee, Ik-Mo;Moon, Jin-Young;Chon, Young-Woo
    • Journal of the Korean Institute of Gas
    • /
    • v.21 no.1
    • /
    • pp.43-51
    • /
    • 2017
  • Recently, ammonia leak occurred frequently in the domestic refrigeration manufacturing facilities. Ammonia caused great damage to the environment and human health in the event of an accident as combustible gases and toxic gases. After considering the types of ammonia accidents of domestic refrigeration manufacturing facilities and selected accident scenarios and to analyze the risk analysis through Impact range estimates and frequency analysis and there was a need to establish measures to minimize accident damage. In this study, depending on the method of analysis quantitative risk assessment we analyzed the risk of the receiver tank of ammonia system. Scenario analysis conditions were set according to the 'Technical guidelines for the selection of accident scenario' under the chemicals control act and 'Guidelines for chemical process quantitative risk analysis' of center for chemical process safety. The risk estimates were utilized for consequence analysis and frequency analysis by SAFETI program of DNV, event tree analysis methodology and part count methodology. The individual risk of ammonia system was derived as 7.71E-04 / yr, social risk were derived as 1.17E-03 / yr. The derived risk was confirmed to apply as low as reasonably practicable of the national fire protection association and through risk calculation, it can be used as a way to minimize accidents ammonia leakage accident damage.

Distribution of the Population at Risk of Cholangiocarcinoma in Bua Yai District, Nakhon Ratchasima of Thailand Using Google Map

  • Kaewpitoon, Soraya J;Rujirakul, Ratana;Sangkudloa, Amnat;Kaewthani, Sarochinee;Khemplila, Kritsakorn;Cherdjirapong, Karuna;Kujapun, Jirawoot;Norkaew, Jun;Chavengkun, Wasugree;Ponphimai, Sukanya;Polsripradist, Poowadol;Padchasuwan, Natnapa;Joosiri, Apinya;Wakkhuwattapong, Parichart;Loyd, Ryan A;Matrakool, Likit;Tongtawee, Taweesak;Panpimanmas, Sukij;Kaewpitoon, Natthawut
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.17 no.3
    • /
    • pp.1433-1436
    • /
    • 2016
  • Background: Cholangiocarcinoma (CCA), a major problem of health in Thailand, particularly in Northeastern and Northern regions, is generally incurable and rapidly lethal because of presentation in stage 3 or 4. Early diagnosis of stage 1 and 2 could allow better survival. Therefore, this study aimed to provide a distribution map of populations at risk for CCA in BuaYai district of Nakhon Ratchasima province, Northeast Thailand. Materials and Methods: A cross-sectional survey was carried out in 10 sub-districts and 122 villages, during June and November 2015. The populations at risk for CCA were screened using the Korat CCA verbal screening test (KCVST) and then risk areas were displayed by using Google map (GM). Results: A total of 11,435 individuals from a 26,198 population completed the KCVST. The majority had a low score of risk for CCA (1-4 points; 93.3%). High scores with 6, 7 and 8 points accounted for 1.20%, 0.13% and 0.02%. The population at risk was found frequently in sub-district municipalities, followed by sub-district administrative organization and town municipalities, (F=396.220, P-value=0.000). Distribution mapping comprised 11 layers: 1, district; 2, local administrative organization; 3, hospital; 4, KCVST opisthorchiasis; 5, KCVST praziquantel used; 6, KCVST cholelithiasis; 7, KCVST raw fish consumption; 8, KCVST alcohol consumption; 9, KCVST pesticide used; 10, KCVST relative family with CCA; and 11, KCVST naive northeastern people. Geovisual display is now available online. Conclusions: This study indicated that the population at high risk of CCA in Bua Yai district is low, therefore setting a zero model project is possible. Key success factors for disease prevention and control need further study. GM production is suitable for further CCA surveillance and monitoring of the population with a high risk score in this area.

A method to evaluate the risk-based robustness index in blast-influenced structures

  • Abdollahzadeh, Gholamreza;Faghihmaleki, Hadi
    • Earthquakes and Structures
    • /
    • v.12 no.1
    • /
    • pp.47-54
    • /
    • 2017
  • Introduction of robustness index in the structure is done in three ways: deterministic robustness index, probabilistic robustness index, and risk-based robustness index. In past decades, there have been numerous researches to evaluate robustness index in both deterministic and probabilistic ways. In this research, by using a risk analysis, a risk-based robustness index has been defined for the structure. By creating scenarios in accordance with uncertainty parameters of critical and unexpected gas blast accident, a new method has been suggested for evaluating risk-based robustness index. Finally, a numerical example for the evaluation of risk-based robustness index of a four-storey reinforced concrete moment frame, designed and built based on Eurocode 8 code, has been presented with results showing a lower risk of robustness.

Analysis of Construction-phase Risk Factors for SMEs' Advance into the Overseas Plant Construction Projects

  • Park, Moonsun;Lee, Kyosun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.328-331
    • /
    • 2017
  • The purpose of this study is to derive construction-phase risk factors in SMEs' advance into overseas plant construction projects. For this, construction-phase risk factors were investigated on the basis of the analysis of Korean construction companies, overseas plant industry-related research institutes, and overseas data. In addition, major risk factors were derived from the investigated construction-phase risk factors, and quantitative risk factors and qualitative risk factors were analyzed and derived from these major risk factors, by the use of three rounds of the Delphi analysis.

  • PDF

Analysis of the Project Risk Factors Using Modified Kano Model (수정된 Kano 모델을 이용한 프로젝트의 위험요인 연구)

  • Jang, Deok-Jae;Song, HaeGeun;Park, Young T.
    • Journal of Korean Society for Quality Management
    • /
    • v.41 no.2
    • /
    • pp.221-232
    • /
    • 2013
  • Purpose: This paper examines risk factors which affect project success, and proposes a method utilizing the average potential satisfaction index(API) to evaluate how much the satisfaction level of the personnel involved in the project can change by reducing the risk. Methods: The current study derives 11 risk factors affecting project success from literature review and conducts survey of 253 subjects who have project work experience. A modified Kano's questionnaire using 5-point Likert-scale is applied to investigate the amount of satisfaction or dissatisfaction when the risk factors are reducted or not, respectively. Results: The respondents consider that the risk factors which include the three elements of project management(schedule, quality, cost) is more important than other risk factors related to the project environment, and technology and profitability. Conclusion: The average potential satisfaction index proposed in this study can measure the perception on the risk factors of the personnel involved in the project, since it has a strong correlation with the perceived importance by the respondents in this study.

Theoretical Grounding of Perceived Risk in Adoption of Mobile Payment System and Behavioural Intention

  • Bharti Ramtiyal;Deepak Verma;Ajay Pal Singh Rathore
    • Asia pacific journal of information systems
    • /
    • v.31 no.4
    • /
    • pp.543-574
    • /
    • 2021
  • This study focuses on a better understanding of the importance of risk perception in adopting Mobile Payment Systems (MPS) by conducting a systematic literature review. From the social science field (using Scopus and Web of Science database) articles were selected. Overall, forty-four significant pieces were determined using a systematic methodology. In addition to providing a summary of the most used theories used to address perceived risk in MPS this paper also investigates the definition for the perceived risk in MPS literature. The study is performed through the identification of dominant theories used to explain perceived risk in the literature. The article gives a thematic analysis of theories and the relation of perceived risk with behavioural intention. As far as we know, this is the first effort of its kind to give a holistic, systematic literature review in light of perceived risk in MPS. Consequently, it is a crucial first step in establishing a solid theoretical framework involving the constructs of perceived risk and laying the groundwork for future research in this area.

Establishment of the Appropriate Risk Standard through the Risk Assessment of Accident Scenario (사고시나리오별 위험도 산정을 통한 적정 위험도 기준 설정)

  • Kim, Kun-Ho;Chun, Young-Woo;Hwang, Yong-Woo;Lee, Ik-Mo;Kwak, In-ho
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.39 no.2
    • /
    • pp.74-81
    • /
    • 2017
  • An off-site consequence analysis is used to calculate the risks when hazardous chemicals that is being used on-site has been exposed off-site; the biggest factor that impacts the risk is the risks of accident scenarios. This study seeks to calculate risks according to accident scenarios by applying OGP/LOPA risk calculating methods for similar facilities, calculate risk reduction ratio by inspecting applicable IPL for incidents, and propose an appropriate risk standard for different risk calculating methods. Considering all applicable IPL when estimating the safety improvement of accident scenarios, the risk of OGP is 8.05E-04 and the risk of LOPA is 1.00E-04, According to the case of IPL, the risk is 1.34E-02. The optimal risk level for accident scenarios using LOPA was $10^{-2}$, but the appropriate risk criteria for accident scenarios in foreign similar studies were $10^{-3}{\sim}10^{-4}$, the risk of a scenario can be determined at an unacceptable level. When OGP is applied, it is analyzed as acceptable level, but in case of applying LOPA, all applicable IPL should be applied in order to satisfy the acceptable risk level. Compared to OGP, the risk is high when LOPA is applied. Therefore, the acceptable risk level should be set differently for each risk method.