A Study on the Development of Domestic-Oriented Prototype for EVMS Operation System by Using Work Task (작업관리 개념을 응용한 EVMS 운영 시스템 프로토타입 개발)

  • Park, Hong-Tae;Yang, Keum-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.6
    • /
    • pp.1281-1286
    • /
    • 2009
  • Our government operates earned value management system (EVMS)of construction schedule and cost for improving earned management system of the construction projects. but There is two unification Method construction schedule and cost to estimate construction progress currently. This weight a staff work. therefore this study present unification method which operate integrate schedule and cost by using work task. In order to inflect verification and model of schedule and cost, this study develop prototype of EVMS.

Prediction of Final Construction Cost and Duration by Forecasting the Slopes of Cost and Time for Each Stage (공사 진행단계별 기울기 추정을 통한 최종 공사비 및 공기 예측)

  • Jin, Eui-Jae;Kwak, Soo-Nam;Kim, Du-Yon;Kim, Hyoung-Kwan;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.137-142
    • /
    • 2006
  • Cost and duration is important factors which directly affect profit therefore must be forecasted correctly to accomplish success of projects. So construction company uses EVMS(Earned Value Management System) to forecast final cost and duration. But previous forecasting model has low accuracy because of its linear forecasting method and can't reflect characteristic of company and project and changes as each progress. This paper presents cost and duration forecasting model using the slope prediction of cost and duration as each progress to reflect the various characteristics of construction industry. EVMS data of 23 road construction projects was used to make up regression analysis equation of slope forecasting model.

  • PDF

A Suggestion for Merging Quality Management into Software Project Schedule Management (소프트웨어개발 일정관리와 품질관리의 통합 방안)

  • Paek, Seon-Uck;Han, Yong-Soo;Hong, Sug-Won
    • Information Systems Review
    • /
    • v.6 no.2
    • /
    • pp.195-208
    • /
    • 2004
  • In this paper we propose a new software project development management model incorporating quality management to schedule management. Though many efficient techniques such as code review and inspection are used to remove defects, the effect of defect removal time on project schedule hasn't been studied much. However, poor quality management has an important effect upon overall schedule and sometimes software projects fails due to it. Thus, quality management and schedule management should be considered together and we need to reflect the time to maintain software quality into the schedule management. For the proposed model we introduced "Quality Value" representing the needed time to remove software defects. We assume PSP/TSP to gather the needed data for quality value. The proposed model can be used to predict the effect of software defects on schedule in advance and to prevent schedule lag.