• Title/Summary/Keyword: survey system

Search Result 9,016, Processing Time 0.039 seconds

Study on the National Quality Certification System based on KS and the new JIS Certification (KS 및 신JIS인증을 중심으로 한 품질인증제도에 관한 연구)

  • Park, Nou-Kyung;Kim, Kwang-Soo
    • Journal of Korean Society for Quality Management
    • /
    • v.38 no.2
    • /
    • pp.225-235
    • /
    • 2010
  • In this study, a comparative research between KS certification system, which is Korea's quality certification system and new JIS certification system are conducted. Compared with the results and the issue of quality certification system to look for ways to improve the company can be helpful in the development plan was presented. The survey obtained from the representatives on the company which currenty maintains certification. Survey was distributed and collected via e-mail., Highlights of the survey, were composed of four categories such as opinions of KS certification, criteria, production test and follow up, etc., these categories were put together for final conclusion.

A Study on the Analysis System of Customer Satisfaction Survey (고객만족도 설문 분석 시스템에 관한 연구)

  • Kang, Min-Shik
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.4
    • /
    • pp.899-905
    • /
    • 2014
  • In order for corporations and institutions to perform efficient management, they first have to infer what factors customers seek for, then continuously strive to provide them with better service. The most important element to provide better service is accurate feedback from customers; however, Korea lacks of standardized system for measuring customer satisfaction. This study suggests the analysis system for survey, which evaluates customer satisfaction efficiently. The system sets up measuring factor for each service quality, and makes it possible to perform methodically. Especially, the system introduces scoring scheme so that it evaluates quality of service or unit service and prioritizes factors those need to be improved. Furthermore, the survey is operated via mobile and online system, which can be analyzed in real time, and lets foreigners use in their own languages. Through applying the analysis system of customer satisfaction survey to students who participated in work-study program, it substantiates the effectiveness of this system.

Hydro-acoustic survey on fish distribution and aggregated fish at artificial reefs in marine ranching area (음향조사기법을 이용한 수산자원 관리수면의 어류분포 및 인공어초지역의 어군위집조사)

  • Kim, Hyun-Young;Hwang, Bo-Kyu;Lee, Yoo-Won;Shin, Hyeon-Ok;Kwon, Jung-No;Lee, Kyung-Hoon
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.47 no.2
    • /
    • pp.139-145
    • /
    • 2011
  • Hydro-acoustic survey was carried out to estimate a fish distribution at marine ranching area and aggregated fish schools at artificial reef area in Oeyeondo, Korea. The survey system was set up with DGPS system, scientific echo sounder (EK60, Simrad Co.), and ECDIS (Mecys. Co. LTD). A track survey and a random survey was respectively applied to the marine ranching area (474.4ha) and to the artificial reef area (within a radius of 300m). As the result, fish distribution and MVBS values in marine ranching area showed that created fisheries resources didn't come to be abundant yet as to appear fish distribution in all of the area. In the artificial reef area, it was, however, able to detect many fish school signals on the top of and around artificial reefs and to confirm the luring effect of artificial reefs.

Research for the survey of method to serviced customer Interruption cost evaluation (전력수용가 정전비용 산출물 위한 설문조사 방법론에 관한 연구)

  • Park, Soo-Man;Kim, Jae-Chul;Moon, Jong-Fil;Bae, Ju-Chun
    • Proceedings of the KIEE Conference
    • /
    • 2002.11b
    • /
    • pp.259-261
    • /
    • 2002
  • KEPCO(Korea Electric Power Corporation) has been management alone before some time. However through the electrical industry reorganization generation and KPX(Korea Power Exchange) were separated on 2001. A marketing and distribution part will be separated in the future. While many problem for appear in future. how to management for power system network is important. unfortunallity, electrical power industry is starting point right now. Thus, detail data is incomplete for this field and detail research for this field is required with distribution reorganazation. In this paper suggest for customer interruption cost compute method to establish a standard. The standard is need to security operation of power system network. The customer interruption cost compute method necessity of customer interruption cost compute method is minimizing process for total cost. As final total cost compute through the interruption cost compute, we can recognize investment point exactly. We cited foreign survey questions, because exactly matched survey questions for in the country circumstance is not exist. And process to survey performance suggest after modify for match in the country circumstance. Survey questions that suggested fer this paper are classified five categories. This paper suggests to detail survey questions and survey method before survey and suggest to how to customer interruption compute when survey data is ensured. Moreover this paper suggest to average interruption cost compute for residential customer using statistical method.

  • PDF

Improving Digital Map Production Using a Field Survey System -Focusing on Geographic Survey and Structural Editing Processes (현장측량시스템 활용을 통한 수치지도 제작공정 개선 -지리조사와 구조화 편집과정 중심으로)

  • Jeon, Bu-Nam;Choi, Yun-Soo;Lee, Im-Pyeong
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.13 no.2 s.32
    • /
    • pp.71-77
    • /
    • 2005
  • Digital maps that art the primitive components for GIS has been increasingly used for various applications. Although their production processes has been noticeably improved, particularly, the geographic survey and structural editing processes still depends on the traditional process depending on maps printed on papers. This study thus proposes a new efficient method employing a computerized filed survey system into these processes. We applied this method to producing a digital map ver 2.0 and compare the results nth those based on the existing method. From this comparison analysis, it is shown that the proposed method saves about 5% from the overall cost by reducing the man power and processing steps required for digital map production.

  • PDF

A study on the Site Survey and Detection Efficiency for Kepco Lightning Detection and Information Network (낙뢰측정 네트워크(KLDNet)를 위한 감지기 사이트서베이와 낙뢰 감지율 검토)

  • Woo, J.W.;Kwak, J.S.;Moon, J.D.
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.55 no.11
    • /
    • pp.532-537
    • /
    • 2006
  • Lightning induced faults accounts for more than 66% at the transmission lines of KEPCO. The lightning causes damages to power system equipments including transmission line, the blackout of electricity and the electro-magnetic interference. Because of this reason, we need the real time lightning information for the optimal operation of power system. And, it is required to obtain and accumulate the lightning current parameters for the insulation design. In 2005, KEPRI constructed a lightning detection network, the KLDNet (i.e. Kepco Lightning Detection & Information System) and launched a lightning information service for KEPCO customers. It is intended to provide data service on the operation of transmission lines and collect lightning-related data, which is the most important factor regulating power system design and operation. The new system will replace LPATS, the old detection system, which has been operating since 1995 and is rapidly failing in terms of both detection performance and location accuracy. The purpose of this paper is to explain the work performed and the results of that work in performing a site survey of several locations. The purpose of the site survey is to find locations acceptable for the installation of a lightning location receiver in support of a Lightning detection system(LDS). A restriction was placed on the surveyed locations, as they must belong to the Korea Electric Power Company. This requirement was made to facilitate the communication needs of the LDS network. Total of 15 sites were evaluated as possible LDS sensor sites. Some of the sites were rejected for physical reasons and therefore no electrical testing was performed. Of the 15 sites, total of 10 sites were considered acceptable and 5 sites were rejected for various reason. In this paper, we would like to explain the site survey and detection efficiency for LDS.

High-resolution Shallow Marine Seismic Survey by Using a Multi-channel Seismic System (다중채널을 이용한 천해저 고해상 해양 탄성파탐사)

  • Kim, Hyun-Do;Kim, Jin-Hoo
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2005.06a
    • /
    • pp.757-763
    • /
    • 2005
  • A multi-channel seismic system has been developed and applied for bedrock mapping in near shore environment. The system is composed of an analog signal processor and an A/D converter installed on the computer, and a streamer with the group interval of 5 meters. The system is accomplished with a data acquisition program which controls the system and a data processing software. With the PC-based shallow marine seismic survey system high-resolution 2-D marine seismic profiles which have high S/N ratios can be obtained after appropriate data processing.

  • PDF

The fundamental study on improvement of railway accident survey system (철도사고조사제도 개선에 관한 연구)

  • 정병현;문대섭;왕종배
    • Proceedings of the KSR Conference
    • /
    • 2002.10b
    • /
    • pp.913-921
    • /
    • 2002
  • Recently, fundamental innovation for the improvement of Korean railway industry is proceeding with the vertical separation into infrastructure and operation, and the privatization of railway operation. And also, with the advent of an era of high-speed railway, starting of Korea Train Express (KTX) will give a great change to circumstances of railway industry. It requires that a railway safety regulation policy and accident survey system cope effectively with this restructuring of railway system. Under these great changes, safety must have the first priority, and the function of management and supervision on railway safety will be ten to the governments responsibility; In this paper, according to changes of railway safety management system, foreign states railway accident system and direction of korea railroad accident survey system will be also introduced.

  • PDF

A Survey of the Recognition of Photovoltaic System for Building Application (태양광발전시스템의 건물 적용에 대한 인식 조사 연구)

  • Lee, Chung-Kook;Yu, Gwon-Jong;Suh, Seung-Jik
    • Journal of the Korean Solar Energy Society
    • /
    • v.23 no.1
    • /
    • pp.17-28
    • /
    • 2003
  • This study aims to investigate and analyze the overall recognition of the photovoltaic system for the application of BIPV(Building Integrated Photovoltaic) in Korea. For this purpose, a survey was carried on through questionnaires answered by 6 groups of experts such as construction engineers, registered architects, mechanical engineers, electrical engineers, university or college professors, and others who are ranked high in their companies or universities or colleges and who mostly seem to be eager to participate in the development of the PV system and to make a business of the system. The results of the survey are as follows: 1. About 95% of those experts who answered the questionnaire have known about renewable energy, and 93% of them are interested in solar energy as alternative energy 2. Host experts have a lot of information on the solar energy system, but have scanty information on the PV system. 3. The experts in the educational and research field have researched for the reasonable period of the participation in the development of the PV system and the period of making a business of the system. They judge that companies in the mechanical and electrical field will participate in the development of the PV system and will make a business of the system in 5 years. 4. The experts have thought that the PV system is designed not for economy but for the environment of the earth and that PV system technology in Korea is much lower than that in the advanced countries. 5. The experts hesitate to participate in the development of the PV system and to make a business of the system because they have little confidence in the economy of the PV system now and because they have thought that they will bear a great financial burden of construction cost 6. The experts judge that it is most desirable to apply the PV system to the rooftops of buildings. And they are greatly interested in the BIPV.

Influencing Factors for Adoption of Smart Cards in Hospitals (종합병원 전자건강카드 도입에 영향을 미치는 요인)

  • Ahn, Lee-Su;Yoon, Seok-Jun;Ahn, Hyeong-Sik;Hong, Seok-Won
    • Quality Improvement in Health Care
    • /
    • v.12 no.2
    • /
    • pp.113-123
    • /
    • 2006
  • Objective : This research is focused on understanding the current status of the Health Smart Card already in use in other advanced countries. This research will analyze the current status of the medical institutions Health Smart Card system adoption process and its effects, and provide a basis for future policy decisions for the effective adoption and diffusion of a Health Smart Card system, in the medical field, through the completed research and analysis. Method : This research surveys the domestic, and foreign, status of Health Smart Card usage. The research also presents up-to-date methodology for the evaluation of the effects of medical and health care technology. The research also conducts a survey of the domestic medical institutions that have implemented a Health Smart Card system, and then analyzes the results of the survey. Additionally, the research carried out a survey and analysis of medical institutions with no Health Smart Card system implemented, and considered the factors affecting the diffusion of Health Smart Card systems in considering an effective policy for the introduction and diffusion of such a system. Research Results : Through the study of the methodology of medical and health care information technology in advanced countries, the methodology for assessing Health Smart Card technology has been established, and focuses on 6 aspects. The study on the status of foreign implementation has shown a model for the Health Smart Card system. A survey was conducted on the current status of medical institutions with an implemented Health Smart Card system, and the survey results have been analyzed. Also, factors influencing the adoption of Health Smart Card systems have been analyzed through the survey on those medical institutions that have not implemented a Health Smart Card system. Conclusion : The government must provide institutional measures for sharing medical records by constructing an IT infrastructure at the national level to enable the adoption and diffusion of a Health Smart Card system. Such a network will make connections between medical institutions possible, thus making the diffusion of the Health Smart Card system nationwide. For the successful adoption and diffusion of a Health Smart Card system, a model system development, under a medical record sharing system, should be conducted. Additionally, a regional unit based model should be developed for the model project, as is done in advanced countries, along with the application of such results.

  • PDF