Currently, South Korea implements water resources management policies focusing on integrated water quantity, quality and hydro-ecology management. In particular, rehabilitation of natural rivers has become a major issue. As for reservoir operation during non-flood season, efforts have been made continuously to apply the Deficit Supply Method that can maximize water supply to address droughts and increase in water demand. When Deficit Supply Method is applied, the water supply capacity of reservoir can be maximized. However, downstream water flow would remain constant. In consideration that a natural stream, a long-time-created hydro-ecology, can be significantly influenced by flow variability, the Deficit Supply Method-based reservoir operation can generate effective water supply. Still, it may trigger adverse effects from the aspects of natural rehabilitation and hydro-ecology recovery. The main objective of this study is to analyze impacts on downstream flow duration through reservoir simulation by comparing the Firm Supply Method, the Deficit Supply Method and the Selective Deficit Supply Method, and examining each method's effects on reservoir operation. This study found that the Firm Supply Method could maintain water flow variability, but could not maximize water supply capacity. When the Deficit Supply Method was applied, water supply capacity could be increased while remaining vulnerable regarding water flow variability, as a difference between average flow and low flow was negligible at downstream. In comparison, the Selective Deficit Supply Method was found to sustain time-based reliability at 95% or higher, whereas downstream flow duration could be maintained at a level similar to the level generated by the Firm Supply Method.
Supply Chain (SC) can balance demands with supply activities as executing Supply Chain Planning (SCP). The fluctuated demands, however, will break the balance between demand and supply. It means that the present SCP is useless in responding the changed demands. Thus it is necessary for SCP to be updated with changed demands. We call this procedure as Supply Chain Replanning. However, the existing measures for SC can not deal with the balance between supply and demand so that they can not detect effectively the timing of replanning. For this reason, a new performance measure, Balancing Point, is developed using momentum, a concept of Physics. It can treat the balance between supply and demand. Also, a replanning method based on Balancing Point is proposed. The proposed method is more effective than the existing replanning method, periodic replanning method and net inventory method.
This study aims at the effective estimation of water supply capacity of small scale reservoir and the proposal of the data which is necessary to establish the water resources management plan of down stream area of the reservoir in the future by comparison and examination about reservoir operation technique for the security of agricultural water in small scale reservoir. The result of flow calculation by Tank model is used for the input data as the inflow data which is needed for the analysis of water supply capacity. Stochastic method, simulation method, and optimization method are used to examine the water supply capacity, and water security amount is compared with each method. From the analyses of water supply capacities by each method, slightly different results are shown in spite of the effort to compare them equally using input data such as inflow data under equal conditions, and the comparison of water supply capacities by each method are as follows; linear planning method, simulation method, and transition probability matrix method in the order of amount from the largest. It is thought that the simulation method in which comparatively reasonable application of the inflow data is possible and is simulated in successive time series dam operation of the three methods used in this study thus, simulation model is proper to estimate the water supply capacity of agricultural small scale reservoir. And it is judged that the heightening of efficiency of water resources utilization according to the development of downstream area of dam may be possible using the upward readjusted water supply amount of $55.18{\tiems}10^6ton$ and $63.7{\times}10^6ton$ at 95% and 90% supply reliability respectively which are above the planning water supply amount of $50.0{\times}10^6$ton when the simulation method is introduced as the standard.
This paper proposes a method of fault diagnostics on switching mode power supply. When the error of switching mode power supply cannot be found when the conventional diagnostics is performed, this proposed method first performs diagnosis on the switching mode power supply strictly to judge the operating condition. This method analyzes the PWM wave which depends on the load change, to make sure the feedback control of the power supply to diagnosis the operation of the power supply system.
Theeranuphattana, Adisak;Tang, John C.S.;Khang, Do Ba
Industrial Engineering and Management Systems
/
v.11
no.1
/
pp.54-69
/
2012
Chan and Qi (SCM 8/3 (2003) 209) developed an innovative measurement method that aggregates performance measures in a supply chain into an overall performance index. The method is useful and makes a significant contribution to supply chain management. Nevertheless, it can be cumbersome in computation due to its highly complex algorithmic fuzzy model. In aggregating the performance information, weights used by Chan and Qi-which aim to address the imprecision of human judgments-are incompatible with weights in additive models. Furthermore, the default assumption of linearity of its scoring procedure could lead to an inaccurate assessment of the overall performance. This paper addresses these limitations by developing an alternative measurement that takes care of the above. This research integrates three different approaches to multiple criteria decision analysis (MCDA)-the multiattribute value theory (MAVT), the swing weighting method and the eigenvector procedure-to develop a comprehensive assessment of supply chain performance. One case study is presented to demonstrate the measurement of the proposed method. The performance model used in the case study relies on the Supply Chain Operations Reference (SCOR) model level 1. With this measurement method, supply chain managers can easily benchmark the performance of the whole system, and then analyze the effectiveness and efficiency of the supply chain.
The modern market is highly competitive. It has progressed from traditional competition between enterprises to competition between supply chains. To ensure that enterprise can form the best strategy consistently, it is necessary to evaluate the trust of other enterprises in the supply chain. First, this paper analyzes the background and significance of supply chain trust research, analyzes and expounds on the qualitative and quantitative methods of supply chain trust evaluation, and summarizes the research in this field. Analytic hierarchy process (AHP) is the most frequently used method in the literature to evaluate and rank criteria through data analysis. However, the input data for AHP analysis is based on human judgment, and hence there is every possibility that the data may be vague to some extent. Therefore, in view of the above problems, this study improves the global trust method based on chain iteration. The improved global trust evaluation method based on chain iteration is more flexible and practical, hence, it can more accurately evaluate supply chain trust. Finally, combined with an actual case of Zhaoxian Chengji Food Co. Ltd., the paper qualitatively analyzes the current situation of supply chain trust management and effectively strengthens the supervision of enterprises to cooperative enterprises. Thus, the company can identify problems on time and strategic adjustments can be implemented accordingly. The effectiveness of the evaluation method proposed in this paper is demonstrated through a quantitative evaluation of its trust in downstream enterprise A. Results suggest that the subjective preferences of and historical transactions together affect the final evaluation of trust.
Through the analysis of the coordination mechanism of the supply chain system of China's automobile manufacturing industry, the factors affecting the supply subsystem, the manufacturing subsystem, the sales subsystem, and the consumption subsystem are sorted out, the supply chain coordination index system based on the influence factor of four subsystems is established. The evaluation models of the coordination degree in the subsystem of the supply chain, the coordination degree among the subsystems, and the comprehensive coordination degree are established by using the efficiency coefficient method and the collaborative entropy method. Experimental results verify the accuracy of the evaluation model using the empirical analysis of the collaborative evaluation index data of China's automobile manufacturing industry from 2000 to 2019. The supply chain synergy of automobile manufacturing industry was low from 2001 to 2005, and it increased to a certain extent from 2006 to 2008 with a small growth rate from 0.10 to 0.15. From 2009 to 2013, the supply chain synergy of automobile manufacturing industry increased rapidly from 0.24 to 0.49, and it also increased rapidly but fluctuated from 2014 to 2019, first rising from 0.68 to 0.84 then dropping to 0.71. These results provide reference for the development of China's automobile manufacturing supply chain system and scientific decision-making basis for the formulation of relevant policies of the automobile manufacturing industry.
Purpose : With the proliferation of O2O platform services that combine offline and online services, many startups are fiercely competing to lead services in the O2O service market. While the prospects for growth in the O2O service market are optimistic because of the close convenience to life, startups can achieve corporate performance only through close cooperation and partnership with suppliers. The purpose of this study is to verify the effect of O2O-based startups' and suppliers' cooperation in supply chain management on SCM performance through supply chain partnerships and startup satisfaction with suppliers. Research design, data, methodology : Data were collected from O2O service-based startups and hypotheses were verified through frequency analysis, exploratory factor analysis, reliability analysis, confirmatory factor analysis, feasibility analysis, and structural equation path analysis. In addition, the mediating effects of supply chain partnerships and startup satisfaction on suppliers were verified. Results : As a result of this study, IT utilization of the O2O startup cooperation method affects the financial perspective of supply chain partnership and SCM performance. The contract implementation of the cooperation method had an impact on the financial and innovation growth perspectives of the SCM performance, and the communication of the cooperation method had an effect on the supply chain partnership, startup satisfaction in the supply chain, and the innovation growth perspective of the SCM performance. Supply chain partnerships had an impact on the financial, innovation growth, and customer perspectives of SCM performance and startup satisfaction within the supply chain had a significant effect on innovation growth and customer perspectives. Conclusions : The implications of this study identified the factors that can improve SCM performance through the cooperation method of O2O startup, supply chain partnership and startup satisfaction with suppliers, and it is significant that the causal relationship was identified by the structural model through the supply chain cooperation factors derived by characteristics. Based on the empirical results, as the services of O2O startups grow, it is expected that empirical research and practical activation of academia should be considered as important in the cooperation of the supply chain.
A water supply reliability is mainly influenced by water demand, reservoir storage, and inflow change caused from drought. The water supply reliability can vary depending on the method of dam operation. In Korea, the deficit-supply method which complements water deficit as water shortage occurs in downstream areas has been used for the national water resources master plan using K-WEAP, but the prime flow method, an alternative approach, would show different results of water supply reliability in comparison to the deficit-supply method. The objective of this research is to compare and analyze differences in water supply reliability according to dam operation methods. These results can be used to re-evaluate water supply reliability of dam in a circumstance considering steady dam release for instreamflow in downstream and hydroelectric power generation.
Due to global climate change, mega-droughts have occurred frequently. Since long-term droughts make it difficult to secure the water resources, water supply needs to be restricted in a reasonable manner. In the event of limited water supply, the waterworks need to develop a restricted water supply strategy. This study showed that analyzing daily water supply could be used to respond to the first stage of a drought. According to an analysis of Korea's major water authorities, there was about 7~21% of room for daily minimum water supply in case of a drought. Restricting the water supply by lowering pressure is a good strategy for local water authorities with high water leakage rate since leakage is inversely dependent with pressure. For this method, it is necessary to quantify water deficiency and pressure at each node using a simulation. Since DDA-based software is not possible to predict changes in demand at nodes with pressure reduction, WaterGEMS, a PDA software, was used to quantitatively predict water shortages and pressures at each node. Locations where water is deficient need to install booster pumps or to be dispatched with water tank truck and bottled water. Without these support, lowering pressure could not be an option for water works. This paper suggests a method for waterworks to plan a drought by lowering pressure to restrict water supply using daily water supply analysis and PDA based simulation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.