• Title/Summary/Keyword: supervisory data

Search Result 270, Processing Time 0.034 seconds

A Study on the Fault Signal Process of Hierarchical Distributed Structure for Highway Maintenance systems using neural Network (신경회로망을 이용한 분산계층 구조용 도로 유지관리설비의 고장정보처리에 관한 연구)

  • 류승기;문학룡;홍규장;최도혁;한태환;유정웅
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.13 no.1
    • /
    • pp.69-76
    • /
    • 1999
  • This paper proposed a design of intelligent supervisory control systems for maintenance of highway traffic information equiprrent and processing algorithm of equiprrent fault data. The fault data of highway traffic equipment are transmitted from rerrnte supervisory controller to central supervisory system by real time, the transmitted fault data are anaIyzed the characteristic using evaluation algorithm of fault data in central supervisory system. The evaluation algorithm includes a neural network and fault knowlOOge-base for processing the multi-generated fault data. For validating the evaluation algorithm of intelligent supervisory control systems, the rrethod of analysis used to the five pattern of binary signal by transmitted real time and the opTclting user-interface constructed in central supervisory system.

  • PDF

Analysis of Applicability of Supervisory Data for Performance Evaluation of Apartment Housing Construction Projects (공동주택 건설 프로젝트의 성과관리를 위한 감리업무 데이터 적용성 분석)

  • Sung, Yookyung;Hur, Youn Kyoung;Kim, Sung Hwan;Lee, Seung Woo;Kang, Seongmi;Park, Chan Hyuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.359-360
    • /
    • 2023
  • As data management and analysis technology advances, there is active discussion on how to utilize data generated in construction projects. Among them, the materials produced during the supervision work are highly useful because their generation cycle and format are regulated according to relevant laws. In this study, we analyzed whether the data produced during the supervision work in the construction phase of apartment housing can be utilized for project performance management. First, this study identified key data necessary for performance management through FGI with experts in the field of apartment housing. Next, we collected supervisory data from the case project and identified whether the data was generated, its cycle, and storage format. As a result of the analysis, the supervisory data contained various information that could measure the performance of construction projects and had the advantage of standardized data. In the future, utilizing supervisory data is expected to enable effective performance management of apartment housing construction projects.

  • PDF

A Study on the Improvement of Electric Supervisory in Apartment Complex (아파트 단지의 전력감시반 개선 연구)

  • 홍규장;김채규
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 1993.10a
    • /
    • pp.51-54
    • /
    • 1993
  • In this paper, it is proposed the the SCADA(Supervisory control and Data Acquisition) system in Apartment complex. The proposed SCADA system make use of the computer CRT(Cathod RAy Tube), which automatically observe the Electrical Facility, Elvator Facility, Fire Alarm Facility and process in the real-time data. In order to improve the hardware performance and the information process, the SCADA system composed of master-slave topology and decentralized the supervisory Facility. This system is expected the retrenchment of construction expenditure and the level-up of supervisory execution.

  • PDF

Analysis of Supervisory Report for Performance Measurement in the Private Building Construction Sites (민간 건축현장 성과측정을 위한 감리보고서 활용성 분석)

  • Sung, Yookyung;Hur, Youn Kyoung;Lee, Seung Woo;Yoo, Wi Sung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.217-218
    • /
    • 2022
  • Supervision work deals with important data necessary for the performance management on building construction sites in accordance with the Building Act. Therefore, this study attempts to use the data from supervisory reports to measure the performance of private building projects. Performance measurement is important for systematic management. However, there are only a few cases in which performance measurement is performed because it requires strenuous efforts to collect data for measurement. First, this study derived 6 performance areas and 15 indicators through a few rounds of expert group discussions. Then, we confirmed the performance indicators with high feasibility of data collection through a survey of supervision experts. It is expected that the data of supervisory reports can measure systematically performance and assist in speedy diagnosis of private building construction sites.

  • PDF

Implementation of Unmanned Remote supervisory System having Multipurpose Measuring Modules

  • Park, Jung-Hoon;Hong, Sung-Hoon;Kang, Moon-Sung
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.132.1-132
    • /
    • 2001
  • In this paper, we have studied for development of unmanned remote supervisory system using mobile communication network, not wire network, not to be affected by space or distance. The unmanned remote supervisory system consists of data processing unit main part and measuring systems (modules part)-temperature measuring module, humidity measuring module and human body sensing module. The data processing unit to collect and process informations of each measuring module has the functions of data communication between a mobile cellular telephone and measuring systems. Each measuring module has supervisory and warning functions for a target of supervision. And then we have designed each system and evaluated accuracy and reliability of the combined total system.

  • PDF

AUTOMATING SUPERVISORY MANPOWER ALLOCATION FOR CONSTRUCTION SITES

  • Jieh-Haur Chen;Li-Ren Yang;W. H. Chen;C. K. Chang
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.239-248
    • /
    • 2007
  • In the highly competitive construction industry, a slight inaccuracy of estimation can easily cause the loss of a project. Erroneous experience-based cost estimates or allocations of on-site supervisory manpower often offset the profit gained from the project and may jeopardize the management processes. To counter these types of problems, we develop a model using mathematical analysis and case-based reasoning to automate the allocation of on-site supervisory manpower and estimate construction site costs. The method is founded upon laborious data collection processes and analysis by matching statistical assumptions, and is applicable to construction projects. In the modeling the costs and allocation of on-site supervisory manpower are quantified for both owners and contractors before initiating or bidding on the projects. The findings confirm that the degree of variation of the model predictions has an accuracy rate at 88.47%. Single-site construction projects can be accurately predicted and the assignment of supervisory manpower feasibly automated.

  • PDF

The Relationships of Superior's Leadership to Supervisory Trust and Organizational Commitment of Nurses (간호사가 인지한 상사의 리더십과 상사신뢰 및 조직몰입과의 관계)

  • Lee, So-Young
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.13 no.2
    • /
    • pp.208-218
    • /
    • 2007
  • Purpose: This study aimed to identify the relationships of superior's leadership to supervisory trust and organizational commitment of nurses. Method: Subjects were 386 nurses in 8 general hospitals at G city and Seoul. Data were collected with self-administered questionnaires and analyzed using SAS 8.12 by applying ttest, ANOVA, Pearson correlation coefficient, and Stepwise multiple regression. Results: Superior's transformational leadership was $3.54{\pm}0.53$ and transactional leadership was $3.40{\pm}0.36$. Supervisory trust was $3.14{\pm}0.46$ and organizational commitment was $3.18{\pm}0.53$. Superior's transformational leadership was positively correlated with transactional leadership, supervisory trust and organizational commitment with each others. The level of supervisory trust and organizational commitment were different significantly by age, educational status, clinical career, position and superior's leadership level. Major factor that affect to supervisory trust and organizational commitment of nurses was transformational leadership, which had an explanation of 45.9% and 29.8%. Conclusions: The more nurses perceived the superior's transformational leadership, the higher nurses perceived supervisory trust and organizational commitment. Therefore, these variables generally screened and other factors should be analyzed. And if specified nursing intervention program which increase superior's transformational leadership will be developed, it may contribute to strengthen the effectiveness of nursing.

  • PDF

The Current technology state of "Supervisory Control And Data Acquisition System(SCADA)" and development plan in the city-gas industry (긴급제언 - 원격감시제어시스템의(SCADA) 기술현황과 도시가스산업에서의 발전방안)

  • Choi, In-Hwan
    • Journal of the Korean Professional Engineers Association
    • /
    • v.43 no.3
    • /
    • pp.28-33
    • /
    • 2010
  • The related industrial technologies are also being developed in medicine, education, the military, transportation, process management, security management and information technology industries due to a rapid progress in telecommunications technology. The supervisory remote control system is based upon telecommunications technology. The supervisory remote control systems are used in various ways such as city gas, water supply and drainage, environment, power, communication and device control fields. The supervisory remort control system became a solution with complex systems and important technologies in electricity, city gas filed that require safety management skills. The supervisory remote control system as a special technology has a lot of practical applications. In this paper, Let me examine the present status of remort control system applications and present development plans and alternatives in city-gas industrial technology.

  • PDF

Automated Supervision of Data Production - Managing the Creation of Statistical Reports on Periodic Data

  • Schanzenberger, Anja;Lawrence, D.R.
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.11a
    • /
    • pp.39-53
    • /
    • 2004
  • Data production systems are generally very large, distributed and complex systems used for creating advanced (mainly statistical) reports. Typically, data is gathered periodically and then subsequently aggregated and separated during numerous production steps. These production steps are arranged in a specific sequence (workflow or production chain), and can be located worldwide. Today, a need for improving and automating methods of supervision for data production systems has been recognized. Supervision in this context entails planning, monitoring and controlling data production. Two significant approaches are introduced here for improving this supervision. The first is a 'closely-coupledd' approach (meaning direct communication between production jobs and supervisory tool, informing the supervisory tod immediately about delays in production) - based upon traditional production planning methods typically used for manufacturing (goods) and adopted for working with data production. The second is a 'loosely-coupled' approach (meaning no direct communication between supervisory tool and production jobs is used) - having its origins in proven traditional project management. The supervisory tool just enquires continuously the progress of production. In both cases, dates, costs, resources, and system health information is made available to management. production operators and administrators to support a timely and smooth production of periodic data. Both approaches are theoretically described and compared. The main finding is that, both are useful, but in different cases. The main advantages of the closely coupled approach are the large production optimisation potential and a production overview in form of a job execution plan, whereas the loosely coupled method mainly supports unhindered job execution and offers a sophisticated production overview in form of a milestone schedule. Ideas for further research include investigation of other potential approaches and theoretical and practical comparison.

  • PDF

Preparation of Reliable Measurement Data by Using State Estimation (상태추정을 이용한 고 신뢰도 측정데이터 확보방안 연구)

  • Kim, Hong-Rae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.5
    • /
    • pp.1020-1025
    • /
    • 2007
  • EMS(energy management system) and SCADA(supervisory control and data acquisition) systems are used for reliable and efficient operation of electrical power systems. Various functions in EMS such as power flow, contingency analysis, security analysis essentially need accurate data set for reliable operation. State estimation can be a tool for providing these data. In this paper, programs for observability analysis and bad data processing are developed. Fundamental algorithms are introduced and validity of the proposed techniques is inspected with test cases.

  • PDF