• Title/Summary/Keyword: supervisory control system

Search Result 262, Processing Time 0.024 seconds

Embedded Platform Architecture for Substation Automation

  • Kim, Hak-Man;Cha, Jae-Sang;Lee, Jong-Joo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.9
    • /
    • pp.76-80
    • /
    • 2007
  • For a more efficient and economical management of substations of power system areas, the concept of substation automation has been introduced using intelligent and ubiquitous IT techniques. In this paper, ubiquitous IT prototype hardware, functions and communication interfaces on an embedded platform for substation automation are proposed. Also, operating system architecture is suggested for the effective implementation of substation automation.

An Analysis of Supervisory Control Performance under Urgent Enviornments (감시제어작업에서 긴급상황의 수행도 분석)

  • 오영진;이근희
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.17 no.32
    • /
    • pp.243-253
    • /
    • 1994
  • Work environments have been changed with the advent of new technologies, such as computer technology. The newer technologies, the more changes in our work conditions. However, human cognitive limits can't keep up with the change of work environments. Mental workload has been an important factors in designing modem work environments such as human-computer interaction. Designing man-machine systems requires knowledge and evaluation of the human cognitive processes which control information flow workload. Futhermore, under an urgent situation, human operator may suffer the work stress, work error, and resultant deleterious work performance. To describe the work performance in the urgent work situations, with time stress and dynamic event occurence, a new concept of information density was introduced. For a series of experiments performed for this study, three independent variables(information amount system processing time, information density) were evaluated using such dependent variables as reaction time, number of error, and number of failure. The results of statistical anlysiss indicate that the amount of information effected on all of five dependent measure. Number of failure and number of secondary task score were effected by both amount of information and operational speed of system, but reaction time of secondary task were effected by both amount of information and information density.

  • PDF

The Case of Novel Attack Detection using Virtual Honeynet (Virtual Honeynet을 이용한 신종공격 탐지 사례)

  • Kim, Chun-Suk;Kang, Dae-Kwon;Euom, Ieck-Chae
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.7 no.2
    • /
    • pp.279-285
    • /
    • 2012
  • Most national critical key infrastructure, such like electricity, nuclear power plant, and petroleum is run on SCADA (Supervisory Control And Data Acquisition) system as the closed network type. These systems have treated the open protocols like TCP/IP, and the commercial operating system, which due to gradually increasing dependence on IT(Information Technology) is a trend. Recently, concerns have been raised about the possibility of these facilities being attacked by cyber terrorists, hacking, or viruses. In this paper, the method to minimize threats and vulnerabilities is proposed, with the virtual honeynet system architecture and the attack detection algorithm, which can detect the unknown attack patterns of Zero-Day Attack are reviewed.

InTouch HMI Development to Real-Time Power System Analysis (실시간 전력 계통 해석을 위한 InTouch HMI 구현)

  • Ahn, Chang-Han;Lee, Sang-Deok;Park, Ji-Ho;Chang, Byung-Hoon;Lee, Hyun-Chul;Lee, Geun-Joon;Baek, Young-Sik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.12
    • /
    • pp.2322-2327
    • /
    • 2009
  • Uncertainty of power system operation increases due to complexity and facilities diversification in the power system. Therefore the importance of SCADA(Supervisory Control and Data Acquisition) system which obtain and manage the actual data in real-time is very important. Accordingly in the studies of power system analysis, the efforts to include real-time power system analysis in simulation and applications are made in many ways. The real-time communication characteristics of SCADA system is considered so as to develop the power system analysis program that matches actual system conditions. The observation and management of SCADA system is realized by Intouch which is mainly used for factory automation and PSS/E(Power System Simulator for Engineers) provides real time system data. SQL DB and Python language is used for real-time communication between the softwares. It is very comfortable to use the various functions in Intouch WindowMaker.

Risk Analysis and Monitoring Model of Urban SCADA Network Infrastructure (도시 기반시설 SCADA 망의 위험분석 및 모니터링 모델 연구)

  • Kim, Wan-Jib;Lee, Kyung-Ho;Kim, Huy-Kang;Youm, Heung-Youl
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.21 no.6
    • /
    • pp.67-81
    • /
    • 2011
  • In recently years, there are cyber-weapon aim to national infrastructure such as 'stuxnet'. Security experts of the world are paying attention to this phenomenon. The networks which controls traffic, subway, waterworks of the city are safe from threats such as computer virus, malware, because the networks were built on closed-networks. However, it's about time to develop countermeasure for the cyber-weapon. In this paper, we review status-quo of the control systems for metropolitan infrastructure and analyze the risk of industrial control system in SCADA(Supervisory Control And Data Acquisition) network. Finally, we propose a security model for control systems of metropolitan infrastructure.

A Centralized Monitoring System for Factory Electrical Installation Using Active Database (능동 데이터베이스를 이용한 중앙전력감시시스템)

  • Choi, Sang-Yule;Moon, Hyun-Ho;Lee, Jong-Joo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.6
    • /
    • pp.115-122
    • /
    • 2010
  • The main purpose of centralized monitoring system is to manage factory electrical installation efficiently by on-line data acquisition and supervisory control. The existing centralized system is only able to be managed by operator whenever electrical installation's faults are detected. Therefore, it may be possible for propagating the installation's faults when operator make the unexpected mistakes. To overcome the unexpected mistakes, in this paper, the author presents a centralized monitoring system for factory electrical installation using active database. by using active database production rule, stated system can minimize unexpected mistake and can operate centralized monitoring system efficiently. Test results on the five factory electrical installations show that performance is efficient and robust.

DLMS SCADA System based on TETRA (TETRA 기반 DLMS 원방감시 시스템)

  • Song, Byung-Kwen;Lee, Suk-Hee
    • Journal of IKEEE
    • /
    • v.13 no.3
    • /
    • pp.95-102
    • /
    • 2009
  • TETRA(TErrestrial Trunked RAdio) is wireless communication system generally adopted to public network and backbone network, as the technology of Trunked Radio System specified by ETSI(European Telecommunications Standards Institute) and currently adopted to the Electric Power IT Backbone Network in Korea. DLMS(Device Language Message Specification) is used in order to meter an electric measuring instrument value. In this paper, DLMS Server and Client simulator are used based on Window operating system. The multi-functional gateway, which transforms the communications based on RS-232C between DLMS Server Simulator and Client Simulator to the one based on TETRA PEI(Peripheral Equipment Interface), is developed such that DLMS SCADA(Supervisory Control And Data Acquisition) system is constructed based on TETRA.

  • PDF

A Design of Power Management and Control System using Digital Protective Relay for Motor Protection, Fault Diagnosis and Control (모터 보호, 고장진단 및 제어를 위한 디지털 보호계전기 활용 전력감시제어 시스템 설계)

  • Lee, Sung-Hwan;Ahn, Ihn-Seok
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.10
    • /
    • pp.516-523
    • /
    • 2000
  • In this paper, intelligent methods using digital protective relay in power supervisory control system is developed in order to protect power systems by means of timely fault detection and diagnosis during operation for induction motor which has various load environments and capacities in power systems. The spectrum pattern of input currents was used to monitor to state of induction motors, and by clustering the spectrum pattern of input currents, the newly occurrence of spectrums pattern caused by faults were detected. For diagnosis of the fault detected, the fuzzy fault tree was derived, and the fuzzy relation equation representing the relation between an induction motor fault and each fault type, was solved. The solution of the fuzzy relation equation shows the possibility of each fault's occurring. The results obtained are summarized as follows: 1) The test result on the basis of KEMC1120 and IEC60255, show that the operation time error of the digital motor protective relay is improved within ${\pm}5%$. 2) Using clustering algorithm by unsupervisory learning, an on-line fault detection method, not affected by the characteristics of loads and rates, was implemented, and the degree of dependency by experts during fault detection was reduced. 3) With the fuzzy fault tree, fault diagnosis process became systematic and expandable to the whole system, and the diagnosis for sub-systems can be made as an object-oriented module.

  • PDF

A Study on Energy Usage Monitoring and Saving Method in the Sewage Treatment Plant (공공하수처리시설에서 에너지 사용현황 및 절감방안 연구)

  • Kim, Jongrack;Rhee, Gahee;You, Kwangtae;Kim, Dongyoun;Lee, Hosik
    • Journal of Korean Society on Water Environment
    • /
    • v.36 no.6
    • /
    • pp.535-545
    • /
    • 2020
  • This study aims to conserve and monitor energy use in public sewage treatment plants by utilizing data from the SCADA system and by controlling the aeration rate required for maintaining effluent water quality. Power consumption in the sewage treatment process was predicted using the equipment's uptime, efficiency, and inherent power consumption. The predicted energy consumption was calibrated by measured data. Additionally, energy efficiency indicators were proposed based on statistical data for energy use, capacity, and effluent quality. In one case study, a sewage treatment plant operated via the SBR process used ~30% of energy consumed in maintaining the bioreactors and treated water tanks (included decanting pump and cleaning systems). Energy consumption analysis with the K-ECO Tool-kit was conducted for unit processing. The results showed that about 58.7% of total energy consumed was used in the preliminary and biological treatment rotating equipment such as the blower and pump. In addition, the energy consumption rate was higher to the order of 19.2% in the phosphorus removal process, 16.0% during sludge treatment, and 6.1% during disinfection and discharge. In terms of equipment energy usage, feeding and decanting pumps accounted for 40% of total energy consumed following 27% for blowers. By controlling the aeration rate based on the proposed feedback control system, the DO concentration was reduced by 56% compared pre-controls and the aeration amount decreased by 28%. The overall power consumption of the plant was reduced by 6% via aeration control.

Development of Distribution Superconducting Fault Current Limiter and its Monitoring System for Power IT Application (배전급 초전도한류기 및 전력 IT 응용을 위한 실시간 모니터링 시스템 개발)

  • Park, Dong-Keun;Seok, Bok-Yeol;Ko, Tae-Kuk;Kang, Hyoung-Ku
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.3
    • /
    • pp.398-402
    • /
    • 2008
  • Recently, the development of superconducting fault current limiters (SFCLs) has been required as power demands increase in the power system. A distribution-level prototype resistive SFCL using coated conductor (CC) has been developed by Hyundai Heavy Industries Co., Ltd. and Yonsei University for the first time in the world. The ratings of the SFCL are 13.2kV/630A at normal operating condition. A novel non-inductive winding method is used in fabricating coils so there is almost zero impedance during normal operation. The distribution SFCL is cooled by sub-cooled liquid nitrogen $(LN_2)$ of 65K and 3 bar to enhance cryo-dielectric performance, critical current density, and thermal conductivity. In order to make reliable operation of an SFCL in real power systems, we monitored and controled its operation conditions by using supervisory control and data acquisition (SCADA) method. Thus, a monitoring system for the SFCL employing information technology (IT) is proposed and developed to be on the lookout for the operation conditions such as inside temperature, inside pressure, $LN_2$ level, voltage and current. Since operation temperature should be kept constant, bang-bang control for temperature feedback with a heater attached to the cold head of cryo-cooler is applied to the system. Short-circuit tests with prospective fault current of 10kA and AC dielectric withstand voltage tests up to 143kV for 1 minute were successfully performed at Korea Electrotechnology Research Institute. This paper deals with the development of a distribution level SFCL and its monitoring system for reliable operation.