Efficient recycling strategies for slurry TBM excavated soil

  • Sung-Min Nam;Joon-Shik Moon;Junyoung Ko;Hyoungseok Oh
    • Geomechanics and Engineering
    • /
    • v.38 no.6
    • /
    • pp.603-609
    • /
    • 2024
  • In downtown subway project most of excavated soil is discarded externally, whereas in road construction excavated soil is used as filling material and management of surplus soil becomes important factor for success of the project. Excavated materials from slurry shield TBM are discharged through discharge pipe to slurry treatment plant and excavated soil mixed with bentonite are separated in separation plant by grain size. Fine material has been discarded together in filter cake without recycling. Its volume can vary according to geologic condition but statistically fine material as filter cake is about 5%~30% out of overall excavated volume. However, filter cake is non-toxic and can be recycled when mixed in the appropriate proportions with coarse aggregate. Therefore, in this study, utilization of excavated soil from a slurry shield TBM were examined and lab tests were conducted to find the proper way for mixing filter cake and aggregate to be recycled as fill material for road construction.

Probabilistic Risk Assessment for Construction Projects (건설공사의 확률적 위험도분석평가)

  • 조효남;임종권;김광섭
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1997.10a
    • /
    • pp.24-31
    • /
    • 1997
  • Recently, in Korea, demand for establishment of systematic risk assessment techniques for construction projects has increased, especially after the large construction failures occurred during construction such as New Haengju Bridge construction projects, subway construction projects, gas explosion accidents etc. Most of existing risk analysis modeling techniques such as Event Tree Analysis and Fault Tree Analysis may not be available for realistic risk assessment of construction projects because it is very complex and difficult to estimate occurrence frequency and failure probability precisely due to a lack of data related to the various risks inherent in construction projects like natural disasters, financial and economic risks, political risks, environmental risks as well as design and construction-related risks. Therefor the main objective of this paper is to suggest systematic probabilistic risk assessment model and demonstrate an approach for probabilistic risk assessment using advanced Event Tree Analysis introducing Fuzzy set theory concepts. It may be stated that the Fuzzy Event Tree AnaIysis may be very usefu1 for the systematic and rational risk assessment for real constructions problems because the approach is able to effectively deal with all the related construction risks in terms of the linguistic variables that incorporate systematically expert's experiences and subjective judgement.

  • PDF

Study on Development for Plan Model of Tunnel construction by using Arena;on focused NATM (ARENA를 활용한 터널공사계획모델 개발에 관한 연구;NATM공법을 대상으로)

  • Lee, Si-Wook;Kim, Ok-Ki;Woo, Sung-Kwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.872-875
    • /
    • 2007
  • Estimation of total construction period and cost in the early stage of the project is very important. Simulation is one of the method considering proper compound such as tools, materials for effective construction management and estimating and analysing affected factors to construction through making suitable process. This study is to develop the model by using Arena simulation considering limited facts like blast time in a subway tunnel construction of both sides inner city. Developed model is easily useful type by using Visual Basic program, and can obtain total construction period and cost as a result. It could be used as a decision making tool in early stage of the construction.

  • PDF

A Study on the Optimization plan for Standardization of Engineering Drawing (설계도면 작성기준 최적화 방안에 관한 연구)

  • Kim, Suk-Su;Song, Jae-ho
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.1
    • /
    • pp.57-64
    • /
    • 2020
  • The construction market became generally opened to overseas and the domestic construction industry has competed with the international construction enterprise of which technical knowledge is superior. In order to compete with the international construction companies, domestic construction industry needs more continuous promotions on the research and development for improving the level of technique of the construction engineering to meet the international norm. This study aims to suggest the better standards of engineering output such as drawings and specifications to correspond the changing integration system and bidding system in preparation for growing international competition. The study starts with comparison and analyses of domestic and international methods and standards for preparing design drawings. And it continues to delve into actual drawing preparation practices, especially focusing on the ones for road and subway construction. Finally, the study presents a better way of the standardization of the main drawings such as general plan, longitudinal drawing, cross section, structural drawings and temporary structure for new bidding systems of historical cost estimation and whole specification tender and for promotion of international competitiveness.

A Study on the Improvement Plans of Maintenance Monitoring in Tunnel Structure (터널구조물 유지관리계측의 개선방안 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.1
    • /
    • pp.10-20
    • /
    • 2020
  • Purpose: Analyze the results of on-site inspection of the tunnel structure maintenance management monitoring and suggest improvement plans. Method: We investigate and analyze the problems of various items on maintenance monitoring of tunnel structure of 14 subway lines of Seoul subway in downtown area. Result: The maintenance monitoring items, measurement quantity and installation location are classified into open tunnel and excavation tunnel and improvement plans are suggested respectively. Various durability criteria of the measuring instruments were examined, and durability confirmation method suggested improvement measures such as approval, inspection, inspection and testing, calibration of monitoring sensors. Conclusion: Applying the improvement measures of the tunnel structure maintenance monitoring to the construction site will increase the efficiency of the maintenance monitoring and contribute to the development of construction monitoring technology.

Feasibility Analysis on Ground-level Stations and Wireless Power Transfer Technology Applications for Monorail System

  • Hwang, Karam;Chung, Jong-Duk;Lee, Kibeom;Tak, Junyoung;Suh, In-Soo
    • International Journal of Railway
    • /
    • v.7 no.3
    • /
    • pp.71-79
    • /
    • 2014
  • Subway systems have been a proved method of public transport and are widely used in major cities around the world. However, the time and cost it takes to construct such systems are very high, as it requires underground tunnels. Cities in various countries have implemented monorail systems as public railway transport as it can be more economical and quicker compared to subway systems in terms of construction. In addition, it provides more convenience towards the public as it is not affected to traffic, and also provides an aerial view of the city. However, the overall construction cost for monorail systems is still significantly high, and as a possible solution to further reduce the overall cost, implementation of ground-level stations and wireless power transfer technology has been proposed in this paper. A concept application layout of ground-level stations and wireless power transfer systems has been discussed, using the Daegu monorail Line 3 system as a simulation base. The expected cost for monorail systems implementing ground-level stations and/or wireless power transfer technology has been estimated based on literature survey, and was compared with the current construction cost of Daegu monorail system. Based on comparison, it has shown that implementation of ground-level stations are the most economical, and can be easily implemented for either starting or expanding the monorail line. Implementation of wireless power transfer technology is also economical, but is more feasible when starting a new monorail line as it requires components which will alter the configuration of the train and infrastructure.

A Study on the Cost-Benefit Analysis for the Construction Method of Underground Railway Crossing (철도지하횡단공사 공법의 비용.편익 분석에 관한 연구)

  • Seok, Chong-Chen;Shin, Min-Ho;Eum, Ky-Yong;Kim, Mu-Il
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.407-413
    • /
    • 2006
  • Railways are very important to get stability of railway structure as transportation system carrying a lot of passengers and freight. These days the construction of underground railway crossing such as expansion of new roads, construction of subway and gas pipe is increasing because of economic and social development. But these kinds of construction didn't take into account Cost-benefit analysis of railway which has the most important aspects of railway safety, so the results of construction didn't get a good evaluation. This study adapt Cost-benefit analysis to evaluate the economic validity of underground railway crossing. This study adjust about Cost-benefit analysis of railway part, and analyze the new method and technology of underground railway crossing constructed by Korean National Railroad and Railway Network Authority. Also this study divide between high frequency line and low frequency lineusing B/C, NPV, and IRR analysis. After analysis, B/C ratio method is the most suitable method among B/C, NPV, and IRR analysis method. Therefore this study can express economic benefit quantitatively and decrease the cost by adapting Cost-benefit analysis, and can clearly express the construction feasibility and investment effects of construction of underground railway crossing method.

  • PDF

Case Study of Structure Damage due to Adjacent Deep Excavation (깊은 굴착에서 근접시공에 따른 구조물 피해사례 연구)

  • 김성욱;김주봉
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.113-120
    • /
    • 1999
  • Deep excavation,1 in the urban areas may cause terrible damages to the adjacent structures. Most damages are due to the settlement of ground during excavation work. This article introduces two actual examples of structure damage in subway construction projects. A through of attempts to find out the factors that are affecting to the settlement of ground was made through site investigations and analyses of measurement data. Some suggestions are given to prevent the repeat of trial and error in deep excavation projects. This kind of attempts are eccentrical to the development and improvement of information-oriented construction method.

  • PDF

Development of Construction and Painting Technology for the Aluminum Carbody of Rolling stock (알루미늄 철도차량 차체 제작 및 도장 기술 개발)

  • 서승일;김진태;박일철;이동헌;신돈수
    • Journal of the Korean Society for Railway
    • /
    • v.2 no.2
    • /
    • pp.1-5
    • /
    • 1999
  • Based on the development of designed technology for aluminum carbody. the prototype aluminum carbody has been constructed. All extrusion profiles required for the carbody has been produced and their quality has also been proven. For sound construction. welding technology to join aluminum extrusion profiles has been developed and jigs for precise assembly of blocks have been made. The aluminum carbody for urban subway train has been completed with the required chamber being set and the welding deformations being constrained by jigs. The safety of the carbody structure has also been proven by the static load test. And also, painting technology has been developed and the surface of the carbody has been pre-treated and painted. The developed technology to construct the aluminum carbody can be used in mass production of aluminum cars ordered by domestic and foreign customers.

  • PDF

UNDERGROUND WATER PROBLEMS IN DEEP EXCAVATION CONSTRVCTION CONTROL AGAINST BOILING FAILURE IN DEEP EXCAVATION IN SANDY GROUND BY FIELD MONITORING

  • Iwasaki, Yoahinori
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1990.10a
    • /
    • pp.97-110
    • /
    • 1990
  • This paper presents a case history of a deep open cut excavation of Nakagawa section for Futuoka Subway construction which adopted observational mettled against boiling failure and completed with success by modifying construction based upon field monitoring. One of the difficult conditions for the excavation was sandy layer with high water pressure which was anticipated boiling failure. The boiling was generally considered as one of the difficult phenomena to work with the observational method because of its unpredictable catastrophic nature. Laboratory experiments showed the existence of the prefailure movements of the ground and the possibility of the application of the observational method against the boiling failure. Construction step was planned to be modified, if necessary, based upon field monitoring and was completed with success.