• 제목/요약/키워드: substation system

검색결과 641건 처리시간 0.032초

광 LAN을 적용한 765kV변전소 감시제어 시범시스템 설계 (Prototype design of fiber optics based 765kV substation control system)

  • 송인호;박종화;최종협
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1996년도 한국자동제어학술회의논문집(국내학술편); 포항공과대학교, 포항; 24-26 Oct. 1996
    • /
    • pp.996-999
    • /
    • 1996
  • This paper introduces prototype design of 765kV Substation control system based on fiber optics LAN and distributed network protocol. Two major important facts, immunity of any surge which frequently occurs in Ultra High Voltage Substation and the most suitable communication protocol for substation control system, are considered on the system design conception. To meet the first fact, use of fiber optics cable and isolation transformer are considered, and to satisfy the second fact, DNP3.0(Distributed Network Protocol) which is IEC870-5 compatible is adopted.

  • PDF

초고압 변전기기의 예방진단 및 종합 자동화 (The Preventing and Diagnosis of Ultra High Voltage Substation Devices and Combination with An Automation System of A Substation)

  • 양항준;김경근;김성식;유정식;김홍석;이학성
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 춘계학술대회 논문집 전력기술부문
    • /
    • pp.275-277
    • /
    • 2001
  • In this paper a preventative and diagnostic system for high and ultra high voltage electric power transmission apparatus is proposed to secure substation normal operation. The proposed system consists of monitoring sub-system and diagnostic sub-system, which are mainly for GIS and main transformer, and the system will be applied for newly established 765kV class substation in Korea. Some guideline for combination with substation control system are presented, and engineering solution as an improved substation automation system is also proposed.

  • PDF

변전소 측정기기의 검.교정 알고리즘에 관한 연구 (A Study on the Substation for the Bad Measuring Devices Detection and Correction)

  • 이흥재;박성민;김용한;김종구
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 춘계학술대회 논문집 전력기술부문
    • /
    • pp.313-315
    • /
    • 2001
  • The power system automation, especially the substation automation is a major issue. so it has been widely studied each country in the world. Since the substation system includes lots of measuring devices. a lot of data and system information are transmitted to operators. The measured values usually have the error that results from the communication process, and it can degrade the reliability of estimated values. So. the detection and correction of measured values at a substation are important factors for substation automation. In this paper, we study the detection and col of measured values at the domestic 154kV/2 distribution substation of double bus structure study will be useful for expected economic dispatch measuring device's inspection and corr management by SCADA system operation, substation automation.

  • PDF

변전소 구조물의 에너지파일 시스템 적용성 연구 (A Sutdy on the Apllicability of the Energy Pile System on Substation)

  • 이대수;오기대;이강렬
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2011년도 춘계학술대회 초록집
    • /
    • pp.198-198
    • /
    • 2011
  • Cooling and Heating system using Geothermal energy in the country has shown rapid development in the research and business field during about 10 years. However, like other renewable energy sources, high initial construction cost is acting as an obstacle to apply widely. Therefore Energy pile system(Heat Exchanger inserted inside the structure pile) that can save about 25 % initial construction cost has been studied in European countries and recently being studied in our country. Therefore, KPECO(Korea Electric Power Corporation) is also studying energy pile system to improve cooling & heating system in substation that install about 200 pile. KPECO is aimed to make energy pile design, construction and maintenance standards because substation has good applicability. In this study, we studied to make new grout material and design program to make optimized design & counstruction method of energy pile system. And planing to peform field test for energy pile system in a 154 kV substation to obtain long-term behavior and efficiency of the system.

  • PDF

전철용 직류변전소의 최적용량설계에 관한 연구 (A Study on Optimal Design of DC Substation Capacity for Mass Transit System)

  • 김종구;이상동;백병산;이현두;이준엽
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 B
    • /
    • pp.1405-1407
    • /
    • 2000
  • This paper is on optimal design for DC substation capacity for Mass Transit System. Three factors are considered for the design i.e. substation arrangements, line configuration and substation power capacity. In this study, we discussed substation power capacity only. At first, DC-fed-traction system is introduced on an outline, a characteristics of train and fed network. Optimal design procedures is described, and modelling for DC-fed-traction system are presented. The circuit-solution method is presented by matrix formula. In order to simulate DC substation power capacity more closely to actual situations, we proposed the program.

  • PDF

자동화된 변전소의 이벤트 발생시 준최적 탐색법에 기반한 모선 재구성 전략의 개발 (Bus Reconfiguration Strategy Based on Local Minimum Tree Search for the Event Processing of Automated Distribution Substation)

  • 고윤석
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권10호
    • /
    • pp.565-572
    • /
    • 2004
  • This paper proposes an expert system which can enhance the accuracy of real-time bus reconfiguration strategy by adopting local minimum tree search method and minimize the spreading effect of the fault by considering totally the operating condition when a main transformer fault occurs in the automated substation. The local minimum tree search method to expand the best-first search method. This method has an advantage which can improve the performance of solution within the limits of the real-time condition. The inference strategy proposed expert system consists of two stages. The first stage determines the switching candidate set by searching possible switching candidates starting from the main transformer or busbar related to the event. And, second stage determines the rational real-time bus reconfiguration strategy based on heuristic rules for the obtained switching candidate set. Also, this paper studies the generalized distribution substation modelling using graph theory and a substation database is designed based on the study result. The inference engine of the expert system and the substation database is implemented in MFC function of Visual C++. Finally, the performance and effectiveness of the proposed expert system is verified by comparing the best-first search solution and local minimum tree search solution based on diversity event simulations for typical distribution substation.

345kv 미금 변전소 외부 계통의 등가축약 기법을 이용한 EMTP 모델링에 관한 연구 (EMTP simulation of 345kv Substation in large network using newly developed Thevenin equivalent network)

  • 정기석;백영식
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.244-246
    • /
    • 2008
  • EMTP-RV is the very powerful program to analyze the dynamic operation of the power system. To use this package in the large complex power system, it is very important to simplify the power system to simple equivalent network. In our study the 100 MVA STATCOM is placed at 345kV "MIGUM" which is the one of the 345kV substations of the Korean Electric Power System that is consist of more than 1000 bus. MIGUM substation is connected with 7 separated transmission lines to main Korean Electric power system. We developed a new method to simplify the network except the substation that we want to analysis. The power system outside the 345kV substation is modeled into the equivalent network. The loop network outside the substation can be modeled to simplified Thevenin equivalent network. The proposed method is applied to IEEE-14 Reliability Test System and the results shows the effectiveness of the method.

  • PDF

전력용 변전시스템 제조공정 시뮬레이터 개발 (Developing a Simulator on the Manufacturing Process of Electrical Substation System)

  • 김혁;이광수;조규성
    • 한국멀티미디어학회논문지
    • /
    • 제18권1호
    • /
    • pp.81-87
    • /
    • 2015
  • This research suggests a simulator regarding the Manufacturing Process of Electrical Substation System using a simulation method. This study is to propose and apply a new concept of simulation modeling, referred to as integrated Aspect-Oriented Modeling Approach (i-AOMA), in order to efficiently support the design and analysis of a Manufacturing Process of Electrical Substation System. The modeling based on i-AOMA can support easy generation of lots of alternative processes to meet simulation requirements of Manufacturing Process of Electrical Substation System in real case studies.

FTA를 이용한 교류전철변전소의 신뢰도 분석 (Reliability Analysis of AC Railway Substation by using FTA)

  • 구본희;차준민;김형철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.248-254
    • /
    • 2008
  • Electric railway system consists of traction power system, rolling stock, track, and overhead line system. A railway substation transforms the electric power transmitted from a electric power company and supply it to the railway power system for the operation of traction system.. It is very important to prevent a possible accident and keep the security of electric power system. This paper proposes a reliability analysis of AC railway substation by using Fault Tree Analysis(FTA). Failure rates of each equipment of railway substation are used to evaluate the reliability of railway substation. The analyzed results can be used to improve the system reliability. FTA is performed by the commercialized program of Relex(Ver. 7.7).

  • PDF

IEC 61850 기반의 변전소자동화 시스템 개발 (Development of Substation Automation System based on IEC 61850)

  • 이유진;김용학;심응보;한정열;이종훤
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.716-717
    • /
    • 2011
  • This paper presents the overview of development of substation automation system. The prototypes of SA system are developed in first phase, and being enhanced the performance in second phase. In this research, the project was classified into three projects which are the development of intelligent electronic devices, the development of operation system and communication network in substation, and the development of technology to verify the compatibility of IEC 61850. As a result of this research, the domestic-made SA system are operated and tested for the performance in 154kV substation and/or test-bed in KEPCO PT Center.

  • PDF