• Title/Summary/Keyword: sub-contractors Management

Search Result 35, Processing Time 0.032 seconds

Partnership Enterprise Modeling Using FIDO-Integrated Systems Modeling Technique (FIDO 방법론을 이용한 기업 간 연계 프로세스 모델링)

  • Kim, Joong-In;Kim, Cheol-Han;Lee, Kyung-Huy
    • IE interfaces
    • /
    • v.15 no.1
    • /
    • pp.55-63
    • /
    • 2002
  • This paper utilizes the FIDO methodology (Function, Information, Dynamic, Organization modeling) which is an enterprise modeling tool that can describe inter-organizational interaction (specifically between prime and sub contractors in this experiment). FIDO follows the standard IDEFO rules in order to demonstrate how a cascading information flow can evolve from a customer to a prime to a subcontractor in a concurrent manner, in a supply chain environment. Background on these processes is presented, followed with the newly derived process and methodology. This is presented in a supply chain management context, and results from an actual experiment at Motorola utilizing subcontractors that supply custom machine parts is presented and reviewed.

Quantification of the CO2 Footprint in Residential Construction

  • Don Mah;Juan D. Manrique;Haitao Yu;Mohamed Al-Hussein;Reza Nasseri
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.525-536
    • /
    • 2009
  • The current residential process adheres to a traditional method of construction involving wood framing on-site on poured concrete foundations which has been widely applied in North America. A conventional residential construction process can include seventeen distinct stages ranging from stake-out to pre-occupancy inspection. The current practice possesses short comings including high construction material wastes, long scheduling timelines, adverse weather conditions, poor quality, low efficiencies and negative environmental impacts from transportation and equipment use. Over CAN $5 billion dollars was spent in the construction sector during 2007 in Canada. Previous findings in CO2 emissions during the construction process of a conventional dwelling emphasize more than 45 tonnes of CO2 emissions. Hence, in Alberta alone during 2007, almost 50,000 residential units would release more than two million tonnes of CO2. These numbers demonstrate the economical and environmental impact in building construction and its relationship with CO2 emissions. The aim of this paper is to quantify the CO2 emissions from the current residential construction process in order to establish the baseline for CO2 emission reduction opportunities. The quantification collection methodology will be approached by identifying the seventeen various stages of construction and quantifying the contributions of CO2 from specific activities and their impacts of work for each stage. The approach of separating these into separate stages for collection will allow for independent opportunities for analysis from various independent contractors from the entire scope of work. The use of BIM will be implemented to efficiently quantify CO2 emissions. Based on the CO2 quantification baseline, emission reduction opportunities such as an industrialized construction process will be introduced that allows homebuilders to reduce the environmental and economical impact of home construction while enabling them to produce higher quality, more energy efficient homes in a safer and shorter period of time.

  • PDF

Development of Historical Data Selection Model Using Non-parametric test in Public Sector - focused on Reinforced Concrete Works of Multi-housing Projects - (비모수 검정기반 공공부문 실적단가 선정모델 개발 -공동주택 철근콘크리트 공종을 중심으로-)

  • Lee, Hyun-Ki;Jeon, Jae-Yong;Park, Sung-Chul;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.87-95
    • /
    • 2008
  • The government wants to apply the construction cost estimating method based on historical data published in the first six months of 2004. Construction companies, however, require the proposed cost estimation model, to be improved which makes it difficult to predict a reasonable construction costs. This paper presents an improved historical data selection model after analyzing the problem of previous method throughout comparing contracted unit prices of reinforced concrete works selected by the previous model to market prices. The model which can select more feasible data would assist participates such as general contractors and sub-contractors to earn a proper profits.

A Study on Performance Analyses of Korea's Bidding and Contract Systems for Public Construction Projects

  • Beak, Seung-Ho;Kang, Tai-Kyung;Park, Wonyoung;Lee, Yoo-Sub
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.3
    • /
    • pp.18-28
    • /
    • 2015
  • Bidding and contract systems are used for public construction projects to select contractors following fair competition principles and to execute national budgets effectively. Many challenges have arisen due to a lack of transparency and fairness and because bidding practices have been luck-based. Few comprehensive or comparative analyses have been conducted on the performance and limitations of bidding and contract systems, and empirical analyses designed to improve policies on and the practice of such systems are lacking. This study empirically analyzed current bidding and contract systems to seek ways of improving them. The study proposes several alternatives to resolve the problems with and irrationalities of the current system: 1) improving bidding and selection systems by changing them from a luck-based price competition into a technical merit- and value-based competition; 2) improving the assessment criteria to meet the current market level of bid and winning prices; 3) adjusting contractual responsibilities and sharing structures to meet the current trend; and 4) strengthening the competitiveness and expanding the social responsibility-based procurement systems of construction companies.

A Study on the Application Instance of KOSHA 18001 to Construction Firms (건설업의 KOSHA 18001 적용사례 연구 - 현장활동 수준분야 중심으로 -)

  • Park, Kyung-Tea;Son, Ki-Sang
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.4 s.68
    • /
    • pp.86-93
    • /
    • 2004
  • Through this study we have reviewed the implementation model, certificate criteria and the formation of KOSHA 18001 Safety and Health Management System and have compared and examined with OHSAS 18001 Certificate. In the course of the 1st questionnaires which have been participated by the concerned Safety and Health Staffs(such as Project Mannager, Site Supervisior, Safety Engineers) of the local construction sites, actual condition of application for KOSHA 18001 has been scrutinized and examined. And as a result, we presented the improved model by digging out the problems. The improved model has been applied for about eight months in local construction sites and the effectiveness has been carefully compared and examined before and after the application of the improvement model through the 2nd questionnaires by the relevant staffs (such as Project Manager, Site Supervisor, Safety Engineer and Project Engineers of the Coordinated Sub-Contractors).

Influence of Relationship Factors on Collaborative IT Activities and Firm Performance (기업간 관계요인이 협업적 IT 활동과 기업성과에 미치는 영향)

  • Jang, Si-Young;Choi, Young-Jin
    • Korean Management Science Review
    • /
    • v.23 no.2
    • /
    • pp.1-16
    • /
    • 2006
  • With the diffusion of the Internet, firms try to electronically collaborate with their partners in order to cut costs and gain profits. This, electronic Partnership, called 'Collaborative IT' is quite popular between large purchase enterprises and small-to-medium sized sub-contractors. This study investigates such relations. This study proposes three groups of research variables-interorganizational relationship, collaborative IT activity, and firm performance. the interorganizational relationship consists of trust, commitment, and asymmetry of commitment. Collaborative IT activity is composed of information sharing and workflow integration. The ultimate dependent variable is firm performance. It is hypothesized that the relationship factors influence the level of collaborative IT activity, while the latter in turn affects the firm performance. The relationship factors nay also directly affect the dependent variable. In addition, collaborative IT motive, as a moderating variable, may influence the causal relationship. By means of survey, ore hundred and eighty-two responses were obtained. Most sample companies are small-sized, in the manufacturing sector. The analysis of data reveals that both trust and commitment positively affects the level of collaborative IT activity, while asymmetry of commitment has negative effects. The workflow integration is significantly related with firm performance. Information sharing, however, has no signific3nt effects. Furthermore, asymmetry of commitment shows reverse relationship with firm performance. Collaborative IT motive works as a moderating variable between information sharing and firm performance. Finally, workflow integration is believed to mediate between relationship factors and firm performance.

The Priority Analysis of the Risk and Countermeasures for Quality Control in the Steel Structure (강구조물 공사의 품질관리를 위한 리스크 중요도 분석 및 대응방안)

  • Cho, Hang-Min;Song, Young-Woong;Ahn, Jae-Bong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.87-96
    • /
    • 2007
  • Recently construction environment is being professionalized. oversized and diversified. Due to fluctuation of construction environment, the demand for the project of steel structure is ieased gradually and steel construction is needed the efficient quality management. The construction of steel structure which required a variety of sub-contractors, the progress of works and technologies are comprehensive of various risks and uncertain factors. But currently the construction of steel structure is conducted the risk management by perception and experience of constructors. Therefore, the analyzing factors of the risk and establishing the device are able to manage the quality management efficiently. In this study, we have conducted the interview of experts, polls and through the Analysis Hierarchy Process (AHP) for the scientific and systematic risk management. This paper will propose a plan for systematization of the construction of the steel structure.

Critical Factors of Subcontractor Evaluation and Selection: A Case Study in Vietnam

  • VO, Khoa Dang;PHAM, Cuong Phu;PHAN, Phuong Thanh;VU, Ngoc Bich;DUONG, My Tien Ha;LE, Loan Phuc;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.3
    • /
    • pp.297-305
    • /
    • 2021
  • A contractor or a main contractor is a company with full capacity to construct all project's works for the owner. A subcontractor is an organization that works with the main contractor to execute and complete work packages for the project. Selecting an effective subcontractor will help the efficiency and success of any projects in the construction industry. Therefore, this study identified subcontractor evaluation factors in Vietnam by collecting questionnaire survey data from engineers and staffs in the construction industry project environment. An exploratory factor analysis (EFA) was then performed to identify the critical factors when evaluating and selecting the subcontractor in construction projects. Moreover, when considering the impact level in terms of the average value, the research results showed that the most critical concern was the subcontractor's reputation. Furthermore, the top five factors affecting the sub-contractor evaluation and selection are (i) reputation, (ii) price, (iii) construction techniques, (iv) ability to implement projects according to commitments, and (v) subcontractor competence (the team of workers, technician staff, engineers with full capacity according to regulations). These research results provide an overall perspective that will help main contractors develop suitable subcontractors' evaluation and selection factors in their projects in the construction industry.

A Comparative Study on the Nominated Subcontractor (NSC) System of Building Construction Project in Asian Commonwealth of Nations - Focused on the NSC Clause Analysis of Standard Contract Forms - (아시아 지역 영연방국가의 지정하도급(NSC)제도에 관한 비교 연구 - 표준계약약관의 지정하도급자 항목분석을 중심으로 -)

  • Cho, Jaeyong;Kim, Junggon;Park, Hyeonggeun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.12-22
    • /
    • 2014
  • In recent, many Korean contractors have tried to extend their business area into the overseas construction market, mainly as a result of a reduction in their domestic construction market. However in terms of risk, overseas construction projects are likely to face a number of unpredictable problems, many of which occur as a result of differences in contract cultures and construction environments between Korea and other countries. One key issue facing overseas construction projects in particular, is that of sub-contracting and control, and the way in which many countries of Commonwealth of Nations operate a unique subcontracting method well known as a nominated sub-contractor(NSC). This paper introduces the NSC system and differences as comparing among standard construction contract forms, such as JCT, SIA, HKIA and PAM. in UK and Asian Commonwealth of Nations. Also, we attempt to classify the type of the NSC system through the consideration of NSC clauses in accordance with the objection and termination of NSC contracting respectively.

TACT Productivity Management for Finish Works of Residential Buildings using Productivity Achievement Ratio (PAR) (공동주택 마감공사 TACT 기법 생산성 관리 - Productivity Achievement Ratio를 활용한 생산성 관리 -)

  • Joo, Seonu;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.36-48
    • /
    • 2015
  • To complete various types of finish works with higher quality in much less time, TACT, which was mostly used for high-rise buildings, has been adapted to meet the needs for systematic schedule management in construction sites. However, the effectiveness of adapting TACT has not been shown as expected due to the different perspectives on productivity from both general contractor and subcontractors based on unforeseen conditions according to the types of site. Furthermore, not enough theoretical backgrounds, empirical data, and systematic approaches to solve the fundamental problems caused by each participants' different views on productivity has produced obstacles for establishing effective solutions. Therefore, this research aims to analyze the possible main reasons for having different point of views regarding productivity among various participants of residential building sites using TACT based on literature review, site survey, and interviews. Also, case study was conducted to propose obtainable productivity (OP) regression equation and productivity achievement ratio (PAR) with reduction factors (RFs) and actual productivity (AP) data from an actual construction site. The proposed outcome may assist general contractors converting output management with PPC to productivity management with actual data using PAR. On the other hand, subcontractors would be able to estimate theory-based maximum productivity of construction sites with TACT by using OP. The PAR will enhance the communication between general and sub-contractors for their decision making process. Finally, the main RFs derived from PAR could be used as essential keys for productivity management to increase the economical and operational effectiveness of the construction project.