• Title/Summary/Keyword: structural safety management plan

Search Result 46, Processing Time 0.036 seconds

A study on the legal structure of the nuclear law system using social network analysis (사회 연결망분석을 활용한 법제 네트워크 구조에 관한 연구: 원자력산업의 관계 법령정보를 중심으로)

  • Jeon, Jieun;Lee, Sanghoon
    • Journal of Digital Convergence
    • /
    • v.17 no.8
    • /
    • pp.47-60
    • /
    • 2019
  • The purpose of this study is to explore the overall structural relationship between the statutory provisions of nuclear energy legislation and to identify the coherence of the nuclear law system using social network analysis. In particular, we analyze the legal structure of the "Nuclear Safety Act", which plays a central role in nuclear safety regulation, to examine the key provisions in legal network structure of Nuclear Safety Act. Therefore, we found the structural problems of the nuclear legal system and suggest the legislative improvement plan for reducing excessive legislative activity and determining the need for legal amendments in nuclear safety management and regulation. This study is expected to provide a analytical framework for making legal system of further policy in other science and technology industries as well as nuclear energy related industries.

Analysis of Road Pavement Condition and Structural Improvement Plan (서울시 도로포장 상태에 대한 분석 및 구조적 개선방안)

  • Bae, Yoon-Shin;Shin, Kyoung-Yub
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.2
    • /
    • pp.119-137
    • /
    • 2012
  • In this study, the damages and condition of road pavement were analyzed using pavement management system (PMS) for the structural improvement. Problems of road pavement management were issued by in-depth interview with workers in charge of plant, construction and supervision. By surveying advanced road pavement management, the way how to improve road pavement management in Seoul was discussed. In conclusion, it is necessary to take measures against road heavy traffic and heavy rain in summer. It was found that the problem of early damages of road pavement due to uniform layout with analyzing life cycle cost (LCC). According to the results of survey, it was suggested to strength practical training and to control precisely the temperature of pavement in the process of production and construction.

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

A Study on Improvement of Local Government Disaster Management System in Korea - Focused on Strengthening the Disaster Management Capacity of Local Government - (지방자치단체 재난관리체계 개선에 관한 연구 - 지방자치단체의 재난관리 역할 강화를 중심으로 -)

  • Hong, Ji-Wan
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.9
    • /
    • pp.21-30
    • /
    • 2018
  • This study aims for improving the system in Disaster Management of Local Government. In addition, the overall disaster management system was compared to the effectiveness of the disaster prevention system and reliability, and problems and improvement points were derived. The disaster management system in Korea has a structure that promptly investigates and restores damage by a simple procedure. Korea disaster management system manages information on top-down structural disasters through the flow of prevention, preparation, response, and recovery. The process from disaster response to recovery under the leadership of the central disaster safety headquarters is simplified. Disaster management tasks are dispersed among departments, making it difficult to respond promptly. Under the control of the central government, disaster management, such as disaster prevention, investigation, and recovery, are carried out. The disaster management improvement direction of the local government should establish the disaster response system focusing on the local government. Therefore, it is necessary to have budget to operate the organization - centered disaster management budget and the disaster management organization. The disaster response manual should be prepared considering the disaster environment and disaster prevention plan. In order to utilize disaster information, it is necessary to reorganize information system such as integrate and streamline of the private resource database and NDMS.

Relationship Between Occupational Safety and Health Policy Principles, Organizational Action on Work-related Stress and the Psychosocial Work Environment in Italy

  • Stavroula Leka;Luis Torres;Aditya Jain;Cristina Di Tecco;Simone Russo;Sergio Iavicoli
    • Safety and Health at Work
    • /
    • v.14 no.4
    • /
    • pp.425-430
    • /
    • 2023
  • Background: It is acknowledged that legislation acts as a motivator for organizational action on psychosocial risks. Our study aims to provide evidence on the relationship between key occupational safety and health (OSH) policy principles and organizational action on work-related stress, and, in turn, with reported employee job demands and resources and their experience of work-related stress. We focus on Italy where specific legislation and practices on work-related stress were introduced in 2008 which are underpinned by these key OSH policy principles. Methods: Secondary analysis of the Italian samples from the employer ESENER-2 and employee 6th EWCS surveys was conducted, using path analysis in structural equation modeling (SEM) linking the two datasets. Results: We found a strong statistically significant relationship between OSH policy principles and organizational action on work-related stress (C.I. = .62-.78 p < .001). The existence of an organizational action plan on work-related stress was found to be significantly associated with more reported job resources (C.I. = .02-.24, p < .05) but these were not found to be significantly associated with less work-related stress. No significant association was found between having an organizational action plan for work-related stress and reported job demands. However, job demands were significantly related to reported work-related stress (C.I. = .27-.47, p < .001). Conclusions: Findings add support to the call for specific legislation on work-related psychosocial risks and highlight how an organizational OSH culture underpinned by key OSH principles, and awareness/competence development on psychosocial risk management can have a positive effect on organizational action. However, further support needs to be provided to organizations around developing primary prevention interventions at the organizational level with the aim of reducing job demands.

Fundamental Study on Visualization of Bar Placing Records Using Augmented Reality (증강현실을 활용한 배근 이력 가시화 방안에 관한 기초적 연구)

  • Park, U-Yeol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.126-127
    • /
    • 2018
  • Rebar work is important in terms of cost and process of reinforced concrete construction along with formwork and concrete construction, and the quality of reinforced concrete construction has a great influence on the safety and durability of the structure. Therefore it is important to thoroughly inspect the steel reinforcement after casting the concrete because it is difficult to confirm the actual condition of the reinforcement. The purpose of this study is to develop an augmented reality system to visualize the records of bar placing work, which is increasingly utilized in the construction field. In order to improve maintenance of reinforced concrete, this study suggests a plan to effectively manage the drawing information including the structural drawing, the placing drawing, and the photographed image at the construction and inspection stage, and develop a system that utilizes augmented reality technology that can display the state of the inside of a concrete structure by superimposing it on actual environment.

  • PDF

FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

Calculation Model for Function & Cost Score based on Normalization Method in Design VE (정규화 기법 기반의 설계VE 기능 및 비용 점수 산출 모델)

  • Lee, Jongsik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.98-106
    • /
    • 2015
  • VE aims at reduction in a budget, improvement of function, structural safety and quality security for public construction projects. However, there is possibility for the structural safety and quality security review to be insufficient because related regulations are mostly composed of analysis on economic efficiency of design. In addition, due to the misconception about VE as a cost saving methodology, an alternative is being presented which still focuses mainly on cost saving, but with no objective evaluation of function related to cost. In order to improve this, the government adopted the reduction of life cycle cost and proposal of value improvement, and let people specify the cost and function of the original plan versus the alternative plan, and the value changes between them. However, it is written mainly into practical convenience rather than theoretical basis since a specific way is not suggested. The current method sets a different starting point by applying the attributional difference of function and cost. Furthermore, an evaluation standard for correlating is an important element in rational decision making for assessing and choosing an alternative. This paper analyzes the process and method of function & cost scoring when performing VE and suggests a mathematical normalization model in order to support rational decision making when selecting an optimum plan.

Propose an Improvement of Checklist for Actual Condition Survey for Designation of Class-lll Facilitie (제3종시설물 지정을 위한 실태조사 체크리스트 개선방안)

  • Yoon, Ji-Ho;Jang, Myunghoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.100-101
    • /
    • 2021
  • Facilities with high risk of a disaster or requiring continuous safety management are designated as class-III facility. In order to designate a class-III facility, it is evaluated based on the safety status of the facility, the risk to the building users, and the number of years elapsed of the facility, etc. and this shall be referred to the actual condition survey for the designation of a class-III facility. In the actual condition survey conducted to designate the safety status is calculated by the checklist based on the evaluation scores consisting of five stages each item, and is evaluated in three stages by 'good', 'careful observation', and 'designated review' through the average of the combined scores. Currently, the actual condition survey being conducted applies only structural stability, and the risk factors such as damage to the finish, the risk of cracking, and the type and weight of major structures are not included in the checklist for the actual condition survey, so even if experts think it is dangerous, scores cannot be reflected. Therefore, this study aims to analyze the problems of checklist of the actual condition survey for the designation of class-III facility and to propose an improvement plan for the checklist for the actual condition survey.

  • PDF