• Title/Summary/Keyword: stream discharge estimation

Search Result 98, Processing Time 0.028 seconds

Integrated Surface-groundwater Analysis in Jeju Island (제주 지역 지표수-지하수 연계 해석)

  • Kim, Nam-Won;Chung, II-Moon;Yoo, Sang-Yeon;Lee, Jeong-Woo;Yang, Sung-Kee
    • Journal of Environmental Science International
    • /
    • v.18 no.9
    • /
    • pp.1017-1026
    • /
    • 2009
  • In Jeju island, the surface runoff characteristics are quite different from those of inland. Most of streams show dried characteristics by means of large portion of recharge which goes to the deep aquifer. For this reason, the accurate estimation of hydrologic components by using watershed model like SWAT is very difficult. On the other hand, the integrated SWAT-MODFLOW model is able to simulate the complex runoff structure including stream-aquifer interaction, spatial-temporal groundwater recharge and so on. The comprehensive results of Pyoseon region in Jeju island show that the amount of groundwater discharge to stream is very small, but it might be added to the discharge into the sea. Statistical analysis shows that SWAT-MODFLOW's results represent better than SWAT's. Also, SWAT-MODFLOW produces a reasonable water budget which shows a quite similar pattern of observed one. This result proves that the integrated SWAT-MODFLOW can be used as a proper tool for hydrologic analysis of entire Jeju island.

Estimation of Sediment Discharge Controlled by Sediment-filled Check-dam in a Forested Catchment (산림유역의 만사 사방댐에 의한 토사유출 조절 효과 추정)

  • Seo, Jung Il;Chun, Kun Woo;Song, Dong Geun
    • Journal of Korean Society of Forest Science
    • /
    • v.105 no.3
    • /
    • pp.321-329
    • /
    • 2016
  • To estimate the sediment discharge controlled by sediment-filled check-dam and thereby enhancing factor for check-dam design and dredging criteria, we surveyed slope failures and stream-bed fluctuation caused by geomorphic disturbances (i.e., landslides and debris flows) in Inje, Gangwondo. In general, check-dams play roles for restraining and controlling sediment discharge within a section under the design equilibrium gradient and a section under the design flood gradient, respectively. The results in this study showed same pattern: that is, the closed type check-dam, which has a design restraint sediment discharge of $2,111m^3$, estimated to control a sediment discharge of $3,996m^3$ in the stream section within 250 m right upper area immediately after the disturbances occurred in 2006. As a result, a design control sediment discharge of the check-dam was larger than its design restraint sediment discharge. This represents that the check-dam is still having an own function for controlling sediment discharge although it exceeded the designed capacity by the sediment discharged from upstream during the disturbances. Our finding suggests that the sediment discharge controlling of check-dam may need to be evaluated separately from its sediment discharge restraint. Currently, the country, however, does not consider the design control (or restraint) sediment discharges, based on the actual field survey, as criteria for check-dam design and/or dredging work. Therefore, the accumulation of the quantitative data is required to support that check-dam has functions for both restraining and controlling sediment discharge. This would be a way to develop our erosion control technology to the scientific technology equipped with a more objective and systematic aspects.

Instream Flow Estimation for Gap-Stream Watershed Considering Ecosystem, Landscape, Water-friendly Environment and Water Quality (생태.경관.친수.수질을 고려한 갑천 유역의 하천유지유량 산정)

  • Kim, Tai-Cheol;Lee, Duk-Joo;Moon, Jong-Pil;Lee, Jae-Myun;Gu, Hui-Jin
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.49 no.6
    • /
    • pp.11-20
    • /
    • 2007
  • In order to make the way to determine the instream flow more practically, we have investigated many case studies and reviewed reports and papers. To validate instream flow level suggested by the case studies, DAWAST and HEC-RAS model were applied to the Gap-stream watershed in Daejeon city. Flow-duration analysis was performed both with the stream flow data gauged in the Indong, Boksu, and Hoeduck stations, and with the stream flow data estimated by the DAWAST model and the specific discharge method. Instream flow was determined among the flow-duration analysis, DAWAST, HEC-RAS model and mass balance approach. It was satisfied with various factors such as target water quality, water depth for eco-system and resorts, water surface width, flow velocity for landscape in dry season. The study suggested that the mean low flow could be replaced into the instream flow for the preliminary study because the instream flow considering ecosystem, landscape, water-friendly environment and water quality was generally close to the mean low flow.

Estimation of Hydraulic Coefficients in An Ungaged Basin Using SWAT Model (SWAT 모형을 이용한 미계측 유역의 수리계수 산정)

  • Lee, Jong-So;Kim, Soo-Jun;Kim, Duck-Gil;Kang, Na-Rae;Kim, Hung-Soo
    • Journal of Wetlands Research
    • /
    • v.13 no.2
    • /
    • pp.319-327
    • /
    • 2011
  • A hydraulic coefficient is a factor representing the hydraulic characteristics of the stream or river. For that reason, we survey stream characteristics such as cross section for performing the stream improvement plan and then we calculate hydraulic coefficient based on its surveyed results. This hydraulic coefficient can be used as an important parameter to calculate flood water level in stream, sediment discharge and water quality. However, we cannot calculate the hydraulic characteristics in an ungaged basin. To overcome this problem, we used the SWAT model for calculating the hydraulic coefficient in the ungaged basin.

Application of Load Duration Curve and Estimation of Delivery Ratio by Flow Durations Using Discharge-Load Rating Curve at Jiseok Stream Watershed (유량-부하량관계식을 이용한 지석천 유역의 부하지속곡선 적용 및 유황별 유달율 산정)

  • Park, Jinhwan;Kim, Kapsoon;Hwang, Kyungsup;Lee, Yongwoon;Lim, Byungjin
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.4
    • /
    • pp.523-530
    • /
    • 2013
  • This study has been carried out to clarify the characteristics of discharge and pollutant loading according to flow conditions at jiseok stream watershed (JSW). A flow rate and pollutant load in the study watershed were estimated by equation of stage-discharge and discharge-loads rating curve. By using the methods above, I've evaluated the water quality (WQ) of the JSW if it is satisfied with the standard target. I've collected the data of BOD and T-P from the JSW every 8 days for the duration of 12 months. And then, I've schematized the data upon the load duration curve and the results showed me that the WQ of JSW was satisfied with the standard target. I've also collected the same data every each day for the duration of 12 months from JSW and have schematized the data again. And the results showed that it also was satisfied with the standard target. To be concluded, I've determined that point pollution sources of JSW gives more significant impacts to the WQ than non-point pollution sources of JSW and hence, as time goes, point pollution sources will keep depriciating the WQ of JSW. Therefore, further efforts will be required to JSW to maintain the WQ.

A Study on the Channel forming Discharge Estimation and the Hydraulic Geometry Characteristics of the Alluvial Stream (충적하천의 하도형성유량 산정과 수리기하특성에 관한 연구)

  • Lee, Hee-Chul;Lee, Eun-Tae
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.5
    • /
    • pp.823-838
    • /
    • 2003
  • For many rivers and streams, it has been observed that a single representative discharge may be used to determine the hydraulic geometry of a stable channel. This representative channel forming discharge has been given several names by different researchers, including bankfull, specified recurrence interval, and effective discharge. Therefore, The purpose of this study is to estimate channel forming discharge for study areas using the hydrological characteristic parameters and recording data, and to determine the hydraulic geometry relationships for the relating bankfull dimensions to bankfull discharge. In the Munmak and Seomyun gauging stations, the estimated bankfull discharges are found to have a return period of 1.8 and 1.5 years on the maximum annual series, respectively. The estimated effective discharges at those stations are largely different from bankfull discharges. The hydraulic geometry relationships between bankfull discharge and bankfull width, bankfull depth, velocity, bed slope are established. But the statistical parameters, such as R2, are calculated lower.

Runoff Estimation for Small Watershed by Interactive Program (Interactive program에 의한 소유역의 유출량 산정)

  • 안상진;김종섭
    • Water for future
    • /
    • v.25 no.4
    • /
    • pp.97-107
    • /
    • 1992
  • The purpose of this study is to estimate the flood hydrograph and runoff at ungaged small watershed by using interactive program with geomorphologic and climatic data obtained from the topographic maps following the law of stream classification and ordering by Horton and Strahler. The present model is modified from Allam's interactive program which derives the geomorphologic instantaneous unit hydrograph(GIUH). This program uses the results of Laplace transformation and convolution integral of probability density function in travel time at each station, This program is used to estimate the time to peak, the flood discharge and the direct runoff at San seong station in Bocheong Stream.

  • PDF

Diffusive Estimation of the Conservative Contaminant in River Estuary (하구의 보존성 오염물질 확산 예측)

  • Yoon, Jong-Su;Shin, Chan-Ki;Hwang, Dong-Jin
    • Journal of environmental and Sanitary engineering
    • /
    • v.23 no.3
    • /
    • pp.47-57
    • /
    • 2008
  • This study was predicted the diffusion of the conservative contaminant using a two-dimensional hydraulic model. The research area is upper basin of Jakwang river where the possibility where the pollutant of vast quantity will flow is high. Using SMS model, we calculated two-dimensional stream flow. And using this result, predicted the conduct of the conservative contaminant by pollutant transfer diffusion calculation. And also we predicted flow and contaminant diffusion in the near estuary by constructed guide bank. As a result of study, pollutant effect scope of the conservative contaminant was predicted with the fact that will broaden because of interception by guide bank. As discharge was increased from the Jakwang river, The diffusion of the pollutant is accelerated, also the effect scope increases.

Development of Flow Interpolation Model Using Neural Network and its Application in Nakdong River Basin (유량 보간 신경망 모형의 개발 및 낙동강 유역에 적용)

  • Son, Ah Long;Han, Kun Yeon;Kim, Ji Eun
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.5
    • /
    • pp.271-280
    • /
    • 2009
  • The objective of this study is to develop a reliable flow forecasting model based on neural network algorithm in order to provide flow rate at stream sections without flow measurement in Nakdong river. Stream flow rate measured at 8-days interval by Nakdong river environment research center, daily upper dam discharge and precipitation data connecting upstream stage gauge were used in this development. Back propagation neural network and multi-layer with hidden layer that exists between input and output layer are used in model learning and constructing, respectively. Model calibration and verification is conducted based on observed data from 3 station in Nakdong river.

Flood Discharge to Decision of Parameters in Han Stream Watershed (한천유역의 홍수량 산정을 위한 HEC-HMS 모형의 민감도 분석)

  • Jung, Woo-Yul;Yang, Sung-Kee;Kim, Dong-Su
    • Journal of Environmental Science International
    • /
    • v.23 no.4
    • /
    • pp.533-541
    • /
    • 2014
  • The streams in Jeju Island have very distinctive hydrological and geological properties and there are a lot of limits in applying the general flood estimation method. This study presented parameters dominant in the Hancheon stream of Jeju Island by analyzing the sensitivity of parameters of HEC-HMS model regarding rainfall events in the target basin, and extracted the optimal parameter(Time of Concentration of Clark Unit Hydrograph: Kraven II method, Storage Coefficient: Sabol method) by analyzing and comparing it with the flood runoff data observed in the site and Jeju Island's observation data.