• 제목/요약/키워드: storm overflow chamber

검색결과 4건 처리시간 0.018초

불완전 분류식 하수처리구역의 강우에 의한 하수도시설의 침입수/유입수 영향 분석 (Effect of infiltration/inflow by rainfall for sewerage facilities in the area with partially separate sewer system)

  • 신정섭;한상원;육준수;이춘구;강선홍
    • 상하수도학회지
    • /
    • 제33권3호
    • /
    • pp.177-190
    • /
    • 2019
  • The purpose of this study was to analyze the effects of sewerage facilities through I/I analysis by rainfall by selecting areas where storm overflow diverging chamber is remained due to the non-maintenance drainage equipment when the sewerage system was reconstructed as a separate sewer system. Research has shown that wet weather flow(WWF) increased from 106.2% to 154.8% compared to dry weather flow(DWF) in intercepting sewers, and that the WWF increased from 122.4% to 257.6% in comparison to DWF in storm overflow diverging chamber. As a result, owing to storm overflow diverging chamber of partially separate sewer system with untreated tributary of sewage treatment plant, rainfall-derived infiltration/inflow(RDII) has been analyzed 2.7 times higher than the areas without storm overflow diverging chamber. Meanwhile, infiltration quantity of this study area was relatively higher than that of other study areas. Therefore, it is necessary to reduce infiltration quantity through sewer pipe maintenance nearby river. Drainage equipment maintenance should be performed not to operate storm overflow diverging chamber in order to handle the appropriate sewage treatment plant capacity for rainfall because it is also expected that RDII due to rain will occur after maintenance. In conclusion, it is necessary to recognize aRDII(allowance of rainfall-derived infiltration/inflow) and to be reflected it on sewage treatment plant capacity because aRDII can occur even after maintenance to the complete separate sewer system.

우수토실 일체형 하수유량조절장치 원격관리시스템 개발 (The Development of Remote Monitoring System for Storm Overflow Chamber Device)

  • 전인재;김기봉
    • 한국융합학회논문지
    • /
    • 제9권6호
    • /
    • pp.61-68
    • /
    • 2018
  • 본 논문에서는 우수토실에서 강우시의 시간 당 우수량이 일정량에 도달할 경우, 그 이상의 우수를 하수 처리장으로 송수하지 않고 하천으로 직접 방류하도록 설계된 장치인 우수토실 일체형 하수유량조절장치를, LoRa 네트워크를 이용하여 원격지에서 모니터링하는 시스템의 개발을 제안한다. 본 시스템은 우수토실 일체형 하수유량조절장치가 LoRa 네트워크에 등록된 이후, 센서에서 생산된 정보를 LoRa 네트워크 서버로 전송하여 갱신되었을 때, 이를 어플리케이션 서버에서 자동으로 수신할 수 있도록 어플리케이션 서버의 통신 인터페이스를 구현하며, 우수토실 장치 관리 및 구독 정보 관리를 수행한다. 또한 각 우수토실 장치의 유량과 개폐 정보를 수집하고, 수집된 데이터를 이용하여 통계 정보를 제공하는 기능을 수행한다. 안드로이드 어플리케이션에서는 우수토실 장치의 오작동 여부를 사용자에게 즉시 전달하도록 파이어베이스(Firebase) 기반의 알림 기능을 수행한다.

전기전도도를 이용한 CSO의 유량 추정 (The Flow rate estimation of CSOs using EC Data)

  • 최원석;송창수
    • 상하수도학회지
    • /
    • 제25권5호
    • /
    • pp.751-757
    • /
    • 2011
  • The monitoring technique based on electrical conductivity (EC) can provide researchers with some advantages in maintenance management and is cost-effective as compared with existing CSOs monitoring. In this study, the flow rate estimation using EC data was executed in two sites where storm overflow chamber had installed. In the result of A-site, R2 of second order multinomial between dilution ratio of EC and observed flow rate was showed the range of 0.68 ~ 0.77. And $R^{2}$ of B-site was 0.62 ~ 0.81. On the other hand, cumulative frequency of A-site was 43.4 ~ 52.2% in the relative error level of under 20%. And B-site was 10.1 ~ 46.5%. The flow rate estimation formula was improved through consideration of some parameters including antecedent dry days and rainfall duration. And difference between estimated flow rate and observed flow rate in total rainfall event was very small.

산지형 하천의 토양침식 및 토사유출량 산정 (Estimation of Soil Erosion and Sediment Yield in Mountainous Stream)

  • 고재욱;양성기;양원석;정우열;박철수
    • 한국환경과학회지
    • /
    • 제22권5호
    • /
    • pp.599-608
    • /
    • 2013
  • Jeju island, which is located along the moving path of typhoon, suffers from flooding and overflow by torrential rain. So abrupt runoff occurring, damages of downstream farm field and shore culturing farms are increasing. In this study, Oaedo stream, one of the mountainous streams on Jeju island, was selected as the basin of study subject and was classified into 3 sub-basins, and after the characteristics of subject basin, the soil erosion amount and the sediment delivery of the stream by land usage distribution were estimated with the use of SATEEC ArcView GIS, the sediment yield amount of 2000 and 2005 was analyzed comparatively. As a result of estimating the sediment yield amount of 2000, the three sub-basins were respectively 12,572.7, 14,080 and 157,761 tons/year. and sediment yield amounts were estimated as 35,172.9, 5,266 and 258,535 tons/year respectively in 2005. The soil erosion and sediment yield amount of 2005 using single storm rainfall were estimated high compared with 2000, but for sub-basin 2, the values rather decreased due to changes in land use, and the land coverage of 2005, since there are many classifications of land usage compared with 2000, enabling to reflect more accurate land usage condition, could deduce appropriate results. It is anticipated that such study results can be utilized as basic data to propose a direction to predict the amount of sediment yield that causes secondary flooding damage and deteriorates water quality within detention pond and grit chamber, and take action against damages in the downstream farm field and shore culturing farms.