• 제목/요약/키워드: steel-framed building construction

검색결과 28건 처리시간 0.027초

Evaluating high performance steel tube-framed diagrid for high-rise buildings

  • Lee, Dongkyu;Ha, Taehyu;Jung, Miyoung;Kim, Jinho
    • Steel and Composite Structures
    • /
    • 제16권3호
    • /
    • pp.289-303
    • /
    • 2014
  • In recent, development of construction and design technology gives taller, larger and heavier steel framed structures. With the tendency of increasing high-rise building, this study is strongly related to structural system, one of significant components in structural design. This study presents an innovative structural system, with high performance steel material, diagrid. Its detail, structural analysis, and structural experiments are all included for the development of new structures.

고층 철골공사의 사업관리 효율화를 위한 자동화 기술 적용 방안 연구 (Automation Technology Application for Efficient Project Management of Steel Framing High-rise Building Construction)

  • 김창섭;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.3-4
    • /
    • 2010
  • With improvements of information technology, the cases which automation technology are applied to construction site are increased. These technologies have advantages and limitations for construction site, therefore they has to be considered in order to maximize benefit. This study are to suggest the process for optimizing management of steel framing high-rise building construction.

  • PDF

길이변화에 따른 기둥부재의 내화피복 비교연구 (Comparative Study for Fire Protective Materials of Column According to Variance of Lengths)

  • 권인규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.118-119
    • /
    • 2014
  • A fire in a steel framed building can decrease a structural stability and cause deformation. And the fire continues the building can be demolished. Therefore, every country requires fire resistance performance of structural elements. In case of column, fire protective thickness derived from a specific fire test using an horizontal furnace is allowed to apply any kinds of sections and lengths of column. However, the lengths and sections of the column in steel framed buildings are various. In this paper, to know the differences of fire performance of steel column according to variance of lengths, a maximum allowable stress, steel surface temperature history, deflection are calculated and the thickness of fire protective material for longer column(4700 mm) need to enforce about 10% more than shorter column (3500 mm).

  • PDF

포항 Grand M Hotel, 리노베이션 계획안 (Grand M Hotel interior renovation)

  • 김혜자
    • 한국실내디자인학회:학술대회논문집
    • /
    • 한국실내디자인학회 2006년도 춘계학술발표대회 논문집
    • /
    • pp.97-98
    • /
    • 2006
  • This study proposes a method of generating steel house shop drawing in an automated design method, reducing construction manpower and period. With one hour fire-resistant approval code, reflecting work ability and efficiency, steel-framed house market is expected to extend from one or two story house to multi-purpose facilities up to four story height. More models have been constructed in this system than the first appearance of fire-resistant approval in Korea in 1997 Also, cost estimation of components such as frame walls, roof trusses and floors is obtained with shop drawings. Also, the lack of suppliers of steel framed house shop drawing and unstandardized drawing method get constructors have difficulty in understanding its design. In steel framed house industry, shop drawings are essential part in building and constructing framework and they have major effects on construction deadlines and expenses. By exploring method of shop drawing automation, this study aims to optimize work flow with a standardized drawing method. The proposed system can be applied to manufacturing automation in domestic industry of factory-built panelizing method in the near future.

  • PDF

스틸하우스 설계 자동화의 필요성과 적용방법에 관한 연구 (Study on the Design Automation of Steel House Shop drawing)

  • 원완연;박현수
    • 한국실내디자인학회:학술대회논문집
    • /
    • 한국실내디자인학회 2006년도 춘계학술발표대회 논문집
    • /
    • pp.103-106
    • /
    • 2006
  • This study proposes a method of generating steel house shop drawing in an automated design method, reducing construction manpower and period. With one hour fire-resistant approval code, reflecting work ability and efficiency, steel-framed house market is expected to extend from one or two story house to multi-purpose facilities up to four story height. More models have been constructed in this system than the first appearance of fire-resistant approval in Korea in 1997. Also, cost estimation of components such as frame walls, roof trusses and floors is obtained with shop drawings. Also, the lack of suppliers of steel framed house shop drawing and unstandardized drawing method get constructors have difficulty in understanding its design. In steel framed house industry, shop drawings are essential part in building and constructing framework and they have major effects on construction deadlines and expenses. By exploring method of shop drawing automation, this study aims to optimize work flow with a standardized drawing method. The proposed system can be applied to manufacturing automation in domestic industry of factory-built panelizing method in the near future.

  • PDF

학교시설(學校施設) 거주평가(居住評價)에 따른 건축기획(建築企劃) 개선(改善) - 철골조학교(鐵骨造學校) 프로젝트 서화.갈마초등학교(初等學校)의 경우(境遇) (Architectural Programming via Post Occupancy Evaluation: Case of Steel Framed School Building Seowha and Galma Primary School)

  • 장성준
    • 교육시설
    • /
    • 제8권2호
    • /
    • pp.13-26
    • /
    • 2001
  • The study is a Post-Occupancy-Evaluation on newly constructed steel framed school buildings sponsored by POSCO, and presents alternative tactics for planning and programming for the kind of project. The schools in concern are Seowha Primary School(Incheon city) and Galma Primary School(Daejeon city) which were completed in February 1999 and since occupied. The POE-2000 study results had to be compared to the POE-1999 which dealt on Jigog Primary School(Pohang city) and Iwol Primary School(Jincheon township) to develop an improved project tactics. In this reason we had to use the same questionnaire forms envisaged by the former study, ie. POE-1999. To begin with the same study format, it might be appropriate to differentiate whether a 'satisfaction' comes from the 'steel framed construction' or from the 'newly built environment'. However it was difficult with the POE-1999. As the intention to compare the 4 school building were the firstly achieved objective of this study that we had to continue to apply the same format and the analysis procedure. Except this condition, everything the POE-1999 conducted were valuable to this POE-2000. The satisfaction survey form includes 36 questions for individual items and 2 questions for general items.

  • PDF

A study on the comparison of a steel building with braced frames and with RC walls

  • Buyuktaskin, Almila H. Arda
    • Earthquakes and Structures
    • /
    • 제12권3호
    • /
    • pp.263-270
    • /
    • 2017
  • In this study, two geometrically identical multi-storey steel buildings with different lateral load resisting systems are structurally analyzed under same earthquake conditions and they are compared with respect to their construction costs of their structural systems. One of the systems is a steel structure with eccentrically steel braced frames. The other one is a RC wall-steel frame system, that is a steel framed structure in combination with a reinforced concrete core and shear walls of minimum thickness that the national code allows. As earthquake resisting systems, steel braced frames and reinforced concrete shear walls, for both cases are located on identical places in either building. Floors of both buildings will be of reinforced concrete slabs of same thickness resting on composite beams. The façades are assumed to be covered identically with light-weight aluminum cladding with insulation. Purpose of use for both buildings is an office building of eight stories. When two systems are structurally analyzed by FEM (finite element method) and dimensionally compared, the dual one comes up with almost 34% less cost of construction with respect to their structural systems. This in turn means that, by using a dual system in earthquake zones such as Turkey, for multi-storey steel buildings with RC floors, more economical solutions can be achieved. In addition, slender steel columns and beams will add to that and consequently more space in rooms is achieved.

초고강도 콘크리트(800kgf/$\textrm{cm}^2$ 이상)를 이용한 콘크리트충전 강관기둥에 대한 실물대 실험 (An Experimental Study on Concrete Filled Steel Tube Column of Mock-up test take advantage of the High Strength Concerete(over the 80MPa))

  • 이장환;공민호;전판근;정근호;이영도;정상진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술.기술논문발표회
    • /
    • pp.21-25
    • /
    • 2004
  • The column for Steel Framed Reinforced Concrete Structure (SFRCS) and the column for Reinforced Concrete Structure (RCS) could be the most common building structure. The increasing of the need for massive space hasaffected the size of building components for supporting the massive structure. However, the changing of components size makes inefficient space of building. Hence, to meet the need for acquiring efficient space comparing the budget and cost the new structure method, Concrete Filled Tube Steel (CFT), was developed. CFT is the structure for which steel tube instead of other materials such as wood for holding concrete is used. The most benefit of this one is to help in reducing the size of the building components and local buckling because of tube steel holding concrete. For this reason, this research will examine the probability of applying CFT on construction sites by using the concrete (800kgf/$\textrm{cm}^2$) especially for CFT through the data from the real size mock-up.

  • PDF

Steel Module-to-Concrete Core Connection Methods in High Rise Modular Buildings: A Critical Review

  • Poudel, Bishal;Lee, Seungtaek;Choi, Jin Ouk
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.571-578
    • /
    • 2022
  • Modularization in a high-rise building is different from a small building, as it is exposed to more lateral forces like wind and earthquakes. The integrity, robustness, and overall stability of the modules and their performance is based on the joining techniques and strong structural systems. High lateral stiff construction structures like concrete shear walls and frames, braced steel frames, and steel moment frames are used for the stability of high-rise modular buildings. Similarly, high-rise stick-built buildings have concrete cores and perimeter frames for lateral load strength and stiffness. Methods for general steel-concrete connections are available in many works of literature. However, there are few modular-related papers describing this connection system in modular buildings. This paper aims to review the various research and practice adopted for steel-to-concrete connections in construction and compare the methods between stick-built buildings and modular buildings. The literature review shows that the practice of steel module-to-concrete core connection in high-rise modular buildings is like outrigger beams-to-concrete core connection in stick-built framed buildings. This paper concludes that further studies are needed in developing proper guidelines for a steel module-to-concrete core connection system in high-rise modular buildings.

  • PDF

건축공법에 따른 북한의 주거환경 만족도 분석 연구 (Analysis of North Korea's Residential Environment Satisfaction According to Construction Method)

  • 김은영;백정훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.222-223
    • /
    • 2020
  • Recently, as the era of economic cooperation on the Korean Peninsula approaches, the role of the building sector, such as humanitarian reorganization of North Korean housing, is increasing. The purpose of this study is to find out the current location of North Korean housing standards through the North Korean Housing Survey. For the survey, a survey was conducted through 79 North Korean defectors. The main construction methods of North Korean housing are reinforced concrete, steel framed, wooden framed, masonry, and reinforced concrete walled and prefabricated. The residential environment satisfaction items consist of durability, waterproof, heating, ventilation, heat insulation, air tightness, mining, soundproofing, disaster safety, fire safety, and crime prevention. The result is as follows. The housing construction method in North Korea, which lived at that time, consisted of 21 people (30.88%) of reinforced concrete frames, 18 people (26.47%) of wooden frames, 17 people (25%) of masonry walls, 5 people of prefabricated structures (7.35%), and reinforced concrete. Two people (2.94%) were walled. Among these, the wooden frame type had the lowest satisfaction level for each item, and the reinforced concrete had a high level of dissatisfaction in the items of heating, confidentiality, and disaster safety, and the other item had a high level of satisfaction. The masonry wall type has a relatively high satisfaction level in terms of insulation, confidentiality, mining, and disaster safety.

  • PDF