• Title/Summary/Keyword: stayed cable

Search Result 622, Processing Time 0.023 seconds

An Analysis on the Image and Landscape Harmonization of Urban Bridges on Han-River, Seoul, Korea (도시 교량경관의 이미지와 조화성 분석 -서울 한강 교량을 중심으로-)

  • 이상엽;오휘영;조세환
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.29 no.6
    • /
    • pp.11-20
    • /
    • 2002
  • This study aims to discover the landscape image of bridges and their harmonization wish surrounding sceneries. This research utilized the basic study tool of psycho-physics and processed the case study of five types of bridges on the Han-River, Seoul. Twenty-one bridges on Han-River were classified into five categories ; the cable stayed bridge, the arch bridge, the girder bridge, the trust bridge and the suspension bridge. Also, aesthetic elements of the bridges including the form the texture, the color, the scale and the harmony were examined. The questionaires to analysis the image and harmonization with surrounding sceneries were designed using semantic differential scale and 5 point Likert scale. The results of the research were as follows. First, components representing the images of bridge landscape are classified into three types, ‘beauty’, ‘weightfulness’ and ‘friendliness’. Second, the image of each bridge as a whole turns out not to be different from each other but to be different in the context of neighboring sceneries. It was also determined that both the Cable Stayed Bridge type and the Arch Bridge type are the most attractive. But, the former does have a more masculine image, and the latter has a m[n feminine image. Third, the Cable Stayed Bridge and the Arch Bridge were evaluated highly in terms of harmonization with surrounding landscapes, while the Girder Bridge received the lowest evaluation. All of the above results suggest that the bridges should be constructed not only for beauty itself in form, color, texture and scale, but also in harmonization with the surrounding landscape. Lastly, it is desirable to do further research to find out sort specific design principles that exist between bridges and tangible surrounding landscape types.

Displacement Measurement of Cable Stayed Bridge using Digital Image Processing (디지털 영상처리를 이용한 사장교의 변위 측정)

  • Son, Byung Jik;Jeon, Seung Gon;Heo, Gwang Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.5
    • /
    • pp.237-242
    • /
    • 2016
  • This paper introduces a method of measuring the displacement of a cable-stayed bridge using digital image processing (DIP). The validity of the DIP technique was confirmed by comparing the results with those obtained using a displacement meter and ANSYS analysis. The normalized cross-correlation (NCC) coefficient was used. 100 kgf and 200 kgf loading experiments were carried out, which showed that when the displacement is large, the reliability of the DIP technique is increased. That is, when the load was increased from 100 kgf to 200kgf, it decreased from 31% to 14% compared to the ANSYS results and from 14% to 4% compared to the displacement meter results. Therefore, the image processing method is able to measure the displacement sufficiently accurately.

Hybrid System Controlled by a $\mu-Synthesis$ Method for a Seismically Excited Cable-Stayed Bridge (지진하중을 받는 사장교를 위한 $\mu$-합성법을 이용한 복합시스템)

  • Park, Kyu-Sik;Jung, Hyung-Jo;Choi, Kang-Min;Lee, Jong-Heon;Lee, In-Won
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.11a
    • /
    • pp.574-577
    • /
    • 2004
  • This paper presents a hybrid system combining lead rubber bearings and hydraulic actuators controlled by a $\mu-synthesis$ method for seismic response control of a cable-stayed bridge. A hybrid system could alleviate some of restrictions and limitations that exist when each system is acting alone because multiple control devices are operating. Therefore, the overall control performance of a hybrid system may be improved compared to each system, however the overall system robustness may be negatively impacted by active device in the hybrid system or active controller may cause instability due to small margins. Therefore, a $\mu-synthesis$ method that guarantees the robust performance is considered to enhance the possibility of real applications of the control system. The performances of the proposed control system are compared with those of passive, active, semiactive control systems and hybrid system controlled by a LQG algorithm. Furthermore, an extensive robust analysis with respect to stiffness and mass matrices perturbation and time delay of actuator is performed. Numerical simulation results show that the performances of the proposed control system are superior to those of passive system and slightly better than those of active and semiactive systems and two hybrid systems show similar control performances. Furthermore, the hybrid system controlled by a f-synthesis method shows the good robustness without loss of control performances. Therefore, the proposed control system could effectively be used to seismically excited cable-stayed bridge which contains many uncertainties.

  • PDF

Structural health monitoring of a cable-stayed bridge using smart sensor technology: deployment and evaluation

  • Jang, Shinae;Jo, Hongki;Cho, Soojin;Mechitov, Kirill;Rice, Jennifer A.;Sim, Sung-Han;Jung, Hyung-Jo;Yun, Chung-Bangm;Spencer, Billie F. Jr.;Agha, Gul
    • Smart Structures and Systems
    • /
    • v.6 no.5_6
    • /
    • pp.439-459
    • /
    • 2010
  • Structural health monitoring (SHM) of civil infrastructure using wireless smart sensor networks (WSSNs) has received significant public attention in recent years. The benefits of WSSNs are that they are low-cost, easy to install, and provide effective data management via on-board computation. This paper reports on the deployment and evaluation of a state-of-the-art WSSN on the new Jindo Bridge, a cable-stayed bridge in South Korea with a 344-m main span and two 70-m side spans. The central components of the WSSN deployment are the Imote2 smart sensor platforms, a custom-designed multimetric sensor boards, base stations, and software provided by the Illinois Structural Health Monitoring Project (ISHMP) Services Toolsuite. In total, 70 sensor nodes and two base stations have been deployed to monitor the bridge using an autonomous SHM application with excessive wind and vibration triggering the system to initiate monitoring. Additionally, the performance of the system is evaluated in terms of hardware durability, software stability, power consumption and energy harvesting capabilities. The Jindo Bridge SHM system constitutes the largest deployment of wireless smart sensors for civil infrastructure monitoring to date. This deployment demonstrates the strong potential of WSSNs for monitoring of large scale civil infrastructure.

Parametric Study on the Buffeting Response for a Cable-Stayed Bridge (사장교의 버페팅 응답 변수 연구)

  • Kim, Ho-Kyung;Choi, Sung Won;Kim, Young Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.2A
    • /
    • pp.371-382
    • /
    • 2006
  • A buffeting analysis is utilized for the estimation of aerodynamic vulnerability of a cable-stayed bridge due to upcoming wind turbulences. The buffeting analysis requires several input parameters such as structural parameters, aerodynamic parameters, and aero-elastic parameters. This study is motivated to estimate the sensitivity of these parameters on buffeting responses. The Seohae bridge is selected as an example bridge. The investigated parameters consist of the inclination of lift and drag coefficient of stiffening girder section, exponential decay factors of span-wise distributed wind turbulences, roughness length, spectra of wind velocity fluctuation, and structural damping. The buffeting response showed high dependency on the input parameters. As conclusions, the importance of parameter selection is emphasized. A further study is also proposed for more general conclusions.

Modal Parameter Extraction of Seohae Cable-stayed Bridge : I. Mode Shape (서해대교 사장교의 동특성 추출 : I. 모드형상)

  • Kim, Byeong Hwa;Park, Min Seok;Lee, Il Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5A
    • /
    • pp.631-639
    • /
    • 2008
  • This paper reports the mode shapes of Seohae cable-stayed bridge extracted by TDD technique. In order to record total 72 acceleration points in the vertical direction of the bridge deck, a custom made data acquisition system with LAN communication has been especially developed and a set of ambient vibration tests has been conducted. For the measured acceleration responses, total twenty four mode shapes up to 2Hz has been extracted by TDD technique. The extracted mode shapes include many new modes that have not been identified in the current on-line health monitoring system installed in the bridge. It is confirmed that TDD technique is the most effective in extracting the high resolution mode shapes on a particularly long span bridge.

An Improved Stability Design of Cable-Stayed Bridges using System Buckling and Second-Order Elastic Analysis (활하중의 영향을 고려한 시스템 좌굴해석 및 2차 탄성해석을 이용한 사장교의 개선된 좌굴설계)

  • Kyung, Yong Soo;Kim, Moon Young;Chang, Sung Pil
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3A
    • /
    • pp.485-496
    • /
    • 2006
  • Practical stability design method of main members of cable-stayed bridges is proposed and discussed through a design example. For this purpose, initial tensions of stay cables and axial forces of main members are firstly determined using initial shaping analysis of bridges under dead loads. And then the effective buckling length using system elastic/inelastic buckling analysis and bending moments considering $P-{\delta}-{\Delta}$ effect by second-order elastic analysis are calculated for main girder and pylon members subjected to both axial forces and moments, respectively. Particularly, three load combinations of dead and live loads, in which maximum load effects due to live loads are obtained, are taken into account and effects of live loads on effective buckling lengths are investigated.

Construction Stage Analysis of Hybrid Composite Cable-Stayed Girder Bridge Using Eccentrically Loaded Derrick Crane (편중 가능한 사장교 가설용 데릭 크레인을 이용한 합성형 복합 사장교 시공 단계 해석)

  • Park, Taekwun;Kim, Moon Kyum;Won, Jong Hwa
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3A
    • /
    • pp.277-286
    • /
    • 2010
  • Derrick or caterpillar crane is generally used for the long-span/cable-stayed bridge construction by pre-cast segment lifting from over-land or water transportation. The heavy weight of them, however, could make defects on unstable under-construction structure and, furthermore a method of conventional segment transportation is also able to occur additional time and cost. In this study, in order to improve conventional construction method, the newly developed derrick crane is mainly considered. It could be not only eccentrically loadable on constructing girder but having rotatable boom for segment transportation from back-side. A series of construction stage using developed derrick crane is defined and also its numerical analysis is conducted. To reflect load characteristics of developed derrick crane on construction stage analysis, on/out of service load is separately calculated by considering vertical/lateral rotation range of boom and it is loaded on 4 fixed positions of crane. The derrick crane on this study could be time and cost saving solution for cable-stayed bridge construction and also make contributions to construction load reduction in its process.

The Sensitivity Analysis and Safety Evaluations of Cable Stayed Bridges Based on Probabilistic Finite Element Method (확률유한요소해석에 의한 사장교의 민감도 분석 및 안전성 평가)

  • Han, Sung-Ho;Cho, Tae-Jun;Bang, Myung-Seok
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.11 no.1
    • /
    • pp.141-152
    • /
    • 2007
  • Considering uncertainties of random input data, it is more reasonable to use probabilistic method than the conventional deterministic method for the design of structures or for the assessment of the responses of structures, which are designed as safe even under extreme loads. Therefore, to assess the quantitative effects of the constructed cable stayed bridge by the input random variables, a sensitivity analysis is studied. Using perturbation method, an analysis program is developed for the iterative probabilistic finite element analyses and sensitivity analyses of the cable stayed bridge, except the initial shape analysis. Monte-Carlo Simulations were used for the verification of the developed program. The results of sensitivity analysis shows the governing effects of external loads. Because the results also provide the sensitive effects of the stiffness of members and the magnitudes of prestressing force of cables, the developed

Wind Tunnel Aeroelastic Studies of Steel Cable-stayed Bridge with Wind Cable and Temporary Support (강 사장교 가설 중 임시 제진방법에 대한 풍동실험 연구)

  • Cho, Jae Young;Shim, Jong Han;Lee, Hak Eun;Kwon, O Whon
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.1
    • /
    • pp.33-45
    • /
    • 2006
  • Cable-stayed bridges are more inherently vulnerable to wind during the erection stages than when they are already being used. Even if a bridge that is already being used is aerodynamically stable, it is prone to having aerodynamic instabilities within the design wind speed during construction. Therefore, when the bridge's designers deliberate on the method they will use in constructing the bridge, they must likewise come up with a suitable plan to ensure the stability of the bridge during its erection (e.g., conducting a wind-tunnel investigation). This paper describes the aeroelastic full-bridge model tests that were conducted to investigate the aerodynamic behavior of the bridge during erection, with emphasis on aerodynamic stability and the mitigation of the buffeting response through temporary stabilization. The aerodynamic performance of a cable -stayed bridge with a main span of 50 m was studied in its completed stage and in two erection stages, corresponding 50% and 90% completion, respectively. In the 50% erection stage tests, a balanced cantilever configuration, with wind cable and temporary support at the tower, was conducted. The system that was determined to be most effective in reducing wind action on the bridge during construction was proposed in the paper, based on the results of the comparative study that was conducted.