The slotless Permanent-Magnet Linear Synchronous Motors (PMLSM) have been developed for factory automation, transportation applications, wafer steppers, conveyance system, and so on. The current analysis and design are treated in air-cored PMLSM. This paper presents a design and analysis solutions for the general class of iron-cored Permanent magnet Linear Synchronous motor (PMLSM). In our design and analysis, rotor consisting of permanent magnets and slot less iron-cored coil stator are treated in a uniform way via vector potiential. For one such motor structure we give analytical formulas for its magnetic field, opitimal permanent magnet and winding coil thickness, trust force. We also provide comparisons of three types in Halbach, vertical, and horizontal magnet array.
This paper deals with determination of parameters of permanent magnet linear synchronous machine(PMLSM) for high thrust and improvement of speed performance. To satisfy these characteristics, PMLSM with double-sided PM mover and slotless ring-winding stator is presented. And using multilaver method, this paper analyzes the electromagnetic field phenomena and estimates parameters such as back-EMF and thrust constant. These parameters are used to derive DC link voltage of voltage source inverter with space vector pulse width modulation(SVPWM) using a digital signal processor and encoder pulse signal. The DC link voltage is one of the most important factor for accurate design. It enables to determinate dynamic operating range of system. Hence, performance evaluation is performed through dynamic modeling. Finally, in this paper, dynamic characteristics according to DC link voltage are presented as experiment result.
In this paper, slot less type high-speed and compact motor was designed. it was selected through change of stator coil distribution for the optimal performance of the motor. In this paper, designed motor was expected to be very vulnerable to heat dissipation in a compact motor. Therefore, to ensure reliability in the design result, winding and permanent magnet damage caused by the losses of motor was analyzed by thermal analysis and demagnetization analysis. Using the result, whether motor burnout was confirmed by motor performance degradation and insulation breakdown.
The recent advancement in the power electronic technique has increased the use of induction motor fed by inverter using high-frequency switching devices. Also the tendency is toward larger size and higher voltage. Therefore, The IGBT (Insulated-Gate Bipolar Transistor) that is high switching frequency element has been using increase. But, The switching surge voltage was occurred by high switching frequency of inverter has appeared a voltage doubling in the motor input terminal due to mismatching of cable characteristic impedance and motor characteristic impedance. Actually, The Switching surge voltage became the major cause to occur the insulation failure by serious voltage stress in the stator winding of induction motor. The short during rise time of switching surge and cable length is increased, the maximum transient voltage seen at the motor terminals increases. In this paper, Analyzed switching surge transient voltage of power cable pulling is used EMTP(Electromagnetic Transient Program) at the induction motor terminal and in cable.
When the high voltage motor fails in power plants, there will be an occurrence where the generator's output would be reduced or the generators would trip. Despite of these effects, the causes of deterioration of the high voltage motor is very seldom investigated. In this paper, the collected data which tested in the field over 10 years have been treated statistically, and analyzed to correlate the insulation deterioration of high voltage motor and installation environment, number of start/stop, and service life. Moreover, the proper period of insulation test is developed to map out maintenance strategy and reduce maintenance costs.
본 논문은 유도전동기 고정자권선의 절연물에 대하여 비파괴 및 파괴시험을 실시하여 절연물의 비파괴특성과 내전압강도와의 상호관계를 비교, 평가, 분석함으로써, 향후 전동기의 절연상태 평가시 수명 및 절연진단의 신뢰성을 도모하고자 제안하였다. 본 논문에서는 비파괴시험과 파괴시험과의 상관관계를 평가하기위하여 비파괴시험으로 절연저항시험, 성극지수시험, 유전정접시험, 부분방전시험을 실시하였으며, 파괴시험은 60[kV] AC 내전압를 이용하여 실시하였다. 또한 장기간 사용된 전동기 권선의 절연물에 대한 연구결과로부터 기존 선진국의 진단방법 및 판정기준이 국내에서 제작된 전동기에 대한 절연특성 평가 및 분석에도 타당함을 증명하였으며, 향후 본 논문에서 제시한 자료들은 유사조건의 산업현장에서 운용중인 유도전동기의 수명 및 상태 평가를 위한 기초자료로 유용하게 사용될 수 있으리라 기대된다.
Asynchronous phenomenon occurs on the synchronous generators under power system when a generator's amplitude of electromagnetic force, phase angle, frequency and waveform etc become different from those of other synchronous generators which can follow instantly varying speed of turbine. Because the amplitude of electromagnetic force, phase frequency and waveform differ from those of other generators with which are to be put into parallel operation due to the change of excitation condition for load sharing and the sharing load change, if reactive current in the internal circuit circulates among generators, the efficiency varies and the stator winding of generators are overheated by resistance loss. When calculation method of protection settings and logic for protection of generator asynchronization will be recommended, a distance relay scheme is commonly used for backup protection. This scheme, called a step distance protection, is comprised of 3 steps for graded zones having different operating time. As for the conventional step distance protection scheme, zone 2 can exceed the ordinary coverage excessively in case of a transformer protection relay especially. In this case, there can be overlapped protection area from a backup protection relay and, therefore, malfunctions can occur when any fault occurs in the overlapped protection area. Distance relays and overcurrent relays are used for backup protection generally, and both relays have normally this problem, the maloperation, caused by a fault in the overlapped protection area. Corresponding to an IEEE standard, this problem can be solved with the modification of the operating time. On the other hand, in Korea, zones are modified to cope with this problem in some specific conditions. These two methods may not be obvious to handle this problem correctly because these methods, modifying the common rules, can cause another coordination problem. To overcome asynchronizing protection, this paper describes an improved backup protection coordination scheme using a new logic that will be suggested.
단상유도전동기는 상용화된 전원을 변환장치 없이 직접 사용할 수 있어 가전제품의 전 분야의 동력원으로 사용되고 있다. 이와 같은 단상유도전동기를 해석하고 효율적으로 운용하기 위해서는 내부 등가회로 정수의 정확한 산출이 요구된다. 순단상유도전동기의 해석에는 교차자계설에 의한 방법과 회전자계설에 의한 방법이 있다는 것은 주지의 사실이지만 기존의 이론이나 방법에서 전동기 내부 정수를 산정하기 위한 방법은 다소 복잡하다. 최근 컴퓨터나 마이크로 프로세서의 발전에 따라 수치적 해석법과 등가회로법을 결합한 회로정수의 산정법이 제안되고 그 계산 처리 속도 또한 빠르며 정확해 지고 있다. 이에 정수 측정 전용 프로그램을 구현하여 단상유도전동기의 실험 결과를 산출하여 실시험을 이용하여 구하는 방법을 제시하고자 한다. 본 논문에서는 단상유도전동기에서 개별적으로 측정이 불가능한 1차 및 2차 누설리액턴스를 무부하시험, 구속시험, 그리고 고정자 권선의 저항 측정시험을 디지털 계측기를 이용하여 정확히 측정하고 측정한 디지털 계측값을 구현된 회로정수 계산프로그램으로 계산후 산출하는 방법을 제시하고 시행하였다.
본 논문은 양측식 슬롯리스 고정자 할박 배열 영구자석 선형 발전기의 발전특성해석을 하였다. 자기 벡터자위와 맥스웰 방정식 이용하여 지배방정식을 도출하고, 특히 영구자석 자화와 고정자 권선의 전류밀도 분포는 무한 푸리에 급수을 이용하여 모델링 하였다. 도출된 지배방정식으로부터, 영구자석 및 고정자 권선에 의한 자계 특성식과 역기전력, 저항, 인덕턴스와 같은 회로정수를 도출 하였다. 발전 특성 해석 결과는 유한요소 해석법과 비교하여 매우 잘 부합함을 확인함으로 그 타당성이 검증되었다.
본 논문에서는 인버터 구동 고압유도전동기 운전시 스위칭 서지로 인하여 고압유도 전동기 단자에서 발생하는 과도과전압을 저감하기 위한 필터로 인버터 출력단자에서 dv/dt를 저감하는 LCR 필터와 전동기 입력단자에서 케이블과 유도전동기 특성임피던스를 매칭시키는 RC필터에 대한 과도과전압 저감특성을 분석하였다. 이 필터를 고압에 대용량 유도전동기에 적합하도록 EMTP(ElectroMagnetic Transients Program)를 이용하여 모델링 및 케이블 영향에 의한 필터의 과도과전압 저감효과를 전압파형과 고조파 스펙트럼으로 비교분석하고, 이를 토대로 고압 대용량 유도전동기에 사용될 필터를 제시하였다. 인버터 스위칭 서지에 의한 과도과전압은 유도전동기 고정자 권선에 심각한 전압 스트레스를 발생시켜 절연파괴를 일으키는 주요원인이 된다. 이러한 과도과전압을 저감위한 필터설계는 고압유도전동기 시스템에서 필수적인 요소임을 보였다. 또한 제시된 필터는 과도과전압을 효과적으로 저감시키는 것을 EMTP 시뮬레이션을 통하여 입증하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.