• 제목/요약/키워드: start time

검색결과 1,584건 처리시간 0.029초

사출성형공정에서 금형에 전달되는 진동 신호 측정을 이용한 성형 단계별 공정시간과 공정특성의 모니터링에 대한 연구 (A study on monitoring for process time and process properties by measuring vibration signals transmitted to the mold during injection molding)

  • 이준한;김종선
    • Design & Manufacturing
    • /
    • 제14권3호
    • /
    • pp.8-16
    • /
    • 2020
  • In this study, the vibration signal of the mold was measured and analyzed to monitoring the process time and characteristics during injection molding. A 5 inch light guide plate mold was used to injection molding and the vibration signal was measured by MPU6050 acceleration sensor module attached the surface of fixed mold base. Conditions except for injection speed and packing pressure were set to the same value and the change of the vibration signal of the mold according to injection speed and packing pressure was analyzed. As a result, the vibration signal had a large change at three points: "Injection start", "V/P switchover", and "Packing end". The time difference between "injection start" and "V/P switchover" means the injection time in the injection molding process, and the time difference between "V/P switchover" and "Packing end" means the packing time. When the injection time and packing time obtained from the vibration signal of the mold are compared with the time recorded in the injection molding machine, the error of the injection time was 2.19±0.69% and the error of the packing time was 1.39±0.83%, which was the same level as the actual value. Additionally, the amplitude at the time of "injection start" increased as the injection speed increased. In "V/P switchover", the amplitude tended to be proportional to the pressure difference between the maximum injection pressure and the packing pressure and the amplitude at the "packing end" tended to the pressure difference between the packing pressure and the back pressure. Therefore, based on the result of this study, the injection time and packing time of each cycle can be monitored by measuring the vibration signal of the mold. Also, it was confirmed that the level and trend of process variables such as the injection speed, maximum injection pressure, and packing pressure can be evaluated as the change of the mold vibration during injection molding.

공급망상에서 CTP 알고리즘을 이용한 납기확약 시스템에 관한 연구 (Study Due-date Promising system using CTP Algorithm in SCM Environment)

  • 박상민;남호기;최진;이종천
    • 대한안전경영과학회지
    • /
    • 제6권1호
    • /
    • pp.97-108
    • /
    • 2004
  • This Study will introduce the concept of A TP(A vailable To Promise) and CTP(Capable to Promise) through the existing study, the process analysis of CTP, the modeling of algorithm and the embodiment of system. This research considers the environment of using Job-Shop method. The CTP algorithm models using LPST(Latest Possible Start Time) and EPST(Earliest Possible Start Time) method especially. It is important part of executing CTP systems. The CTP modeling and implementing develops to system which is capable to implement in the various business environment through additional and continuous research.

TDX-1A 시스팀 시동 (TDX-1A System Start-Up)

  • 김관중;이병선;김영시
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1987년도 전기.전자공학 학술대회 논문집(II)
    • /
    • pp.1003-1007
    • /
    • 1987
  • The system start-up function of TDX-1A that should be executed during installation or emergency has been designed to meet requirements of the distributed real time control system. It is performed in a centralized manner by the dedicated processor according to the maintenance and administration mechanism of the system. Upon execution, it provides information on the system state for the ESS personal. In additions, it protects the loss the charging and statistics data, and minimizes the effect on the customer service. This paper describes the design concept of the system startup function and its implementation method and also calculates its the execution time.

  • PDF

Detailed Analysis of the KAERI nTOF Facility

  • Kim, Jong Woon;Lee, Young-Ouk
    • Journal of Radiation Protection and Research
    • /
    • 제41권2호
    • /
    • pp.141-147
    • /
    • 2016
  • Background: A project for building a neutron time-of-flight (nTOF) facility is progressing. We expect that the construction will start in early 2016. Before that, a detailed simulation based on the current architectural drawings was performed to optimize the performance of our facility. Materials and Methods: Currently, several parts had been modified or changed from the original design to reflect requirements such as the layout of the electron beam line, shape of the vacuum chamber producing a neutron beam, and the underground layout of the nTOF facility. Detailed analysis for these modifications has been done with MCNP simulation. Results and Discussion: An overview of our photo-neutron source and KAERI nTOF facility were introduced. The numerical simulations for heat deposition, source term, and radiation shielding of KAERI nTOF facility were performed and the results are discussed. Conclusion: We are expecting that the construction of the KAERI nTOF facility will start in early 2016, and these results will be used as basic data.

납기확약을 통해 고객 신뢰성 향상을 도모하기 위한 CTP 시스템에 관한 연구 (-CTP System Study for Customer Reliability Improvement through Due date Promising-)

  • 오성환;박영기;강경식
    • 대한안전경영과학회지
    • /
    • 제6권3호
    • /
    • pp.121-130
    • /
    • 2004
  • This Study will introduce the concept of CTP(Capable-to-Promise) Algorithm, CTP process, and the modeling of algorithm. This research is based on the environment of using Job-Shop method. CTP algorithm model use LPST(Latest Possible Start Time) and EPST(Earliest Possible Start Time) method especially. It is important part of executing CTP system. The CTP modeling and implementing develops to system which is able to implement in the various business environment through additional and continuous research.

공급망상에세 CTP 알고리즘을 이용한 납기확약 시스템 모델링 (Modeling Due-date Promising system using CTP Algorithm in SCM Environment)

  • 최진;박상민;남호기;이종천
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2003년도 추계학술대회
    • /
    • pp.117-127
    • /
    • 2003
  • This Study will introduce the concept of ATP(Available To Promise) and CTP(Capable to Promise) through the existing study , the process analysis of CTP(Capable to Promise), the modeling of algorithm and the embodiment of system. This research considers the environment of using Job-Shop method. The CTP algorithm models espicially through using LPST(Latest Possible Start Time) and EPST(Earlist Possible Start Time) method. It is important part of executing CTP(Capable to Promise), The CTP(Capable to Promise) modeling and implementing system develops to system which is capable to implement in the various business environment through addational and continuous research.

  • PDF

액체용 유량계 교정시스템의 Diverter 불확도 특성 연구 (Uncertainty Characteristics of Diverter for Flowmeter Calibration System)

  • 이동근;박종호
    • 한국유체기계학회 논문집
    • /
    • 제11권3호
    • /
    • pp.50-55
    • /
    • 2008
  • The diverter system is a key component in achieving a high accuracy liquid flow rate standard using a static gravimetric system with a flying start and stop method. The diverter is a moving device used to direct flow alternately along its normal course(by pass) or towards the weighing tank. The time needed for collection into the weighing tank is measured using a timer. So it is important to the diversion period is sufficiently fast and triggering point of timer which is determined the filling time. On this studies show that uncertainty of diverter system for changing diversion speed and triggering point was estimated in accordance with Guide to The Expression of Uncertainty in Measurement(ISO).

PROJECT SCHEDULING WITH START-TIME DEPENDENT COST AND IMPRECISE DURATION

  • Siamak Haji Yakhchali
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.468-473
    • /
    • 2011
  • The goal of a project manager is generally to minimize the cost of the project and also to cope with uncertainty. This paper deals with the problem of project scheduling a set of activities satisfying precedence constraints in order to minimize the sum of the costs associated with the starting times of the activities in the network with imprecise activity durations, represented by means of interval or fuzzy numbers. So far this problem has been completely solved by several authors when the activities durations have crisp values. However, they do not consider the imprecision in activity durations in their models. Here the framework of possibility theory is proposed to solve this problem. In fuzzy arithmetic, usually, the interval calculations are used for the aim of complexity reduction and simplification. Thus the case of interval-valued durations is first addressed, and then extended to fuzzy intervals. A numerical example is used to illustrate the developed concept.

  • PDF

긴급선행기간을 이용한 MRP 시스템 (MRP System with Emergent Lead Time)

  • 남선희;윤원영
    • 산업공학
    • /
    • 제4권1호
    • /
    • pp.47-61
    • /
    • 1991
  • This paper develops MRP system with two-types of lead time(average lead time and emergent lead time). In this proposed MRP system, Material Requirement Planning is scheduled by using average lead time, but the emergent lead time is used only when start date of planned order is past. Btrieve data management technique and Stack structure are used for recalculating procedure of planned order with the TURBO PASCAL Version 5.5. An example is also considered.

  • PDF

창업기업의 혁신지향성이 성장열망에 미치는 영향에 관한 연구 (A Study on the Effect of Startup's Innovation Orientation on Growth Aspiration)

  • 오혜미;이채원;김진수
    • 벤처창업연구
    • /
    • 제16권5호
    • /
    • pp.1-14
    • /
    • 2021
  • 전 세계적으로 혁신과 창업기업의 스케일업이 중요한 국가적 과제로 부각되고 있다. 과거 경기침체 극복을 위해 'Start-tup America', 'Start-up Chile', 'Start-up Britain' 등 스타트업 중심의 정책 패러다임을 확산시켰다. 최근 창업선진국을 중심으로 경기회복이 가시화되면서, 스타트업 중심의 정책 패러다임이 'Scale-up America', Scale-up UK', 'Scale-up Denmark' 등 스케일업 중심의 정책 패러다임으로 전환하고 있는 추세이다. 창업기업은 스타트업 단계를 넘어서 스케일업 단계로 진입해야 국가적으로 양질의 일자리가 늘어나고 경제성장으로 나아갈 수 있다. 그러므로 창업기업을 강한 중견기업으로 성장시켜 지속적으로 생존할 수 있는 발판을 마련해주어야 한다. 이에 따라 본 연구는 창업기업이 스케일업 기업으로 성장할 수 있도록 성장의 선행변수인 성장 열망에 영향을 미치는 요인들을 심층적으로 고찰하고 국가의 경제발전단계 간, 기업가 간의 차이를 실증적으로 규명함으로써 국가차원에서 창업기업이 스케일업 할 수 있는 방안을 제시하는데 목적이 있다. 본 연구는 글로벌기업가정신모니터(GEM)의 일반성인조사 3.5년 미만의 초기 기업가들을 대상으로 하였으며, 국가경제발전단계를 혁신주도형, 효율주도형, 요소주도형 경제로 구분하여 R 3.5.0프로그램을 사용하여 국가경제발전단계 간 비교를 위해 다층모형분석을 통해 연구가설을 검증하였다. 가설검증 결과는 다음과 같다. 창업기업의 혁신지향성과 성장 열망의 영향관계에 있어 국가경제발전 간, 기업가 간 차이가 있는 것으로 나타났다. 국가의 경제가 발전할수록 기업가의 혁신활동이 더 두드러지게 나타난다. 또한 창업기업은 기업가의 영향을 많이 받기 때문에, 동일한 환경 내에서 기업가가 얼마나 혁신 지향적인가에 따라 열망의 정도에 차이가 있다고 할 수 있다. 창업기업의 혁신지향성과 성장 열망의 영향관계에 있어 실패에 대한 두려움은 국가경제발전 간, 기업가 간 차이가 있는 것으로 나타났다. 기업가 및 창업에 대한 실패에 대한 두려움은 국가경제발전 단계별로 차이가 있으며, 이러한 국가적 측면에서 실패에 대한 인식은 창업활동에 영향을 미치는 중요한 요인 중 하나이다. 이러한 연구결과를 통해 규명된 창업기업이 스케일업 기업으로 성장하는데 있어 성장열망에 영향을 미치는 검증된 요인을 국가경제발전단계에 따라 적합한 스케일업 생태계를 조성하는데 활용할 수 있을 것으로 기대한다.