• Title/Summary/Keyword: standardized contract

Search Result 33, Processing Time 0.019 seconds

The Case Analysis and It's Implications of Teacher Quality Management System in America (미국의 교원 질 관리체제에 관한 사례분석 및 시사점)

  • Ju, Dong-Beom;Chung, Il-Hwan;Jung, Hyun-Sook
    • Korean Journal of Comparative Education
    • /
    • v.27 no.1
    • /
    • pp.123-144
    • /
    • 2017
  • The purpose of the study was to analyze American teacher quality management system and provide it's implications. For this, the study analyzed the main traits of American teacher policy, Pennsylvania State University's teacher cultivation system, Pennsylvania State's teacher certification, selection, and recruit system, the master teacher system of New Jersey and New York State. The main results are as the followings. First, American teacher policy is variously operated by state government and school district based on variety and autonomy. Second, for teacher cultivation in American teacher policy, the evaluation on the teacher cultivation program of teacher cultivation institute(mainly university) is strictly administrated. Third, for teacher certification, various tests for gaining teacher certificate are administered and standardized tests are used for the tests. Fourth, for teacher selection and recruit, there is no special test for selection and teacher recruit is done by contract. Fifth, for quality management using excellent teacher, America is administering master teacher that is similar with master teacher system in Korea. Finally, the innovation of teacher cultivation institute by introducing Every Student Succeeds Act(ESSA) is anticipated. Based on these results, the implications for Korean teacher policy were provided.

Legal Review of Product Liability of a Defective Aircraft (군용항공기와 결합방지를 위한 개선방안 및 법적 책임관계 연구)

  • Cho, Young-Ki;Chung, Wook
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.20 no.2
    • /
    • pp.59-158
    • /
    • 2005
  • When a military aircraft suffers damages due to the defects in its design, manufacturing or notification, all of which are generally understood as products liability defects, the obvious compensation is sought as it would in other consumer good case. However, there exist clear yet unappreciated difference between general consumer goods and military aircraft, as far as products liability law is concerned - some sort of recovery should be obtained even when there exist only defects, not damages, to the aircraft because of the implication of defective parts is much grave than what can be expected in a consumer goods case. While certain anticipatory measures do exist in manual or at negotiation stages for the safety of military aircraft, such measures are ineffective, if not ambiguous, in recovery effort in the post-accident stage In another word, the standardized military procurement contract manuals and boilerplate forms do not appreciate the unique and dangerous military nature of military aircraft. There are many unique legal issues which can arise when trying to prevent defective aircraft or parts, or to recover compensations for accident due to such defects. At two-level, the government should establish legal system (or countermeasures if you'd like) for purchasing safer military aircraft. First, one should be able to work with legal ground and policy that allows selecting and purchasing safer goods - the purpose of such contract is not litigious, but rather in acquiring what are most reliable. Second, in case the defects do arise and lead to damages, solid legal principles and instructions should be established for effectively pursuing appropriate company, (usually a aerospace industry giant with much experience) for products liability - the purpose of such pursuit is inevitable for a public official, since he or she is no private business man with much flexibilities, even to the point of waiving such compensatory right for future business purposes. This article tries to identify problems in methods of procuring military aircraft or parts - after reviewing on how the military can improve on legal and policy grounds for procuring what will be the focus of future military strength, it will offer some of the ways to effectively handling and resolving a liability issues.

  • PDF

Approach to improve construction management using Information Technology (IT) (정보기술(IT) 기반을 통한 시공관리 선진화 방안)

  • Lee Woo-Bang;Moon Jin-Yeong;Moon Byeong-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.115-122
    • /
    • 2002
  • There is various points that should be improved in Fairness such as our contract practice to propose construction projects, project managing and the stakeholders' way of thinking and culture. We consider that the revision of construction related provisions and systems is required but even more, an overall change in business management through the implementation of Integrated Construction Information Management System that will enable the owner, which drives the project, and contractor sharing construction information is required. To mange construction related information in an integrated manner, designing information should be smoothly transferred to purchasing information, and changes are required in order to move ahead to process-oriented work system. Finally information created from various construction organizations should be delivered in an aligned and standardized manner as well. The domestic Nuclear Power Plant Construction has been accepting various technology transfers from U.S, France, Canada and UK, which enabled us to self-support technology and recently even proceeded to the phase exporting our technology to others. However, continuous effort is required to improve internal business efficiency and to respond to external environmental change such aselectricity market deregulation. Recently, in accordance with the result in number of CEO's intention to make progress in IT and improve business efficiency, the number of enterprises introducing Enterprise Resource Planning is increasing. ERP is an innovative tool which changes the way of performing work from organization and department orientation to process-orientation in order to optimize the resources, such as human and material resources, through out the Enterprise by performing BPR which will maximize overall business efficiency of the enterprise, such includes not only construction management, but also business management. KHNP continued to performing large scaled construction projects such as nuclear power plant construction for past 30 years and took the initiatives of large scale project management and Quality management ability in domestic industry by having independent capability of over all construction planning, purchasing and, construction and start up management etc. To maintain our leading position of improving construction management technology based on our accumulated project management experience and technology, KHNP included construction into our ERP project in purpose of innovating construction business. We would like to discuss the characteristics of nuclear construction business, project management system, information system infrastructure and information sharing system among construction related entities, and implementation practices for information system, and consider how to resolve our practice that should be improved in this thesis.

  • PDF