Appropriate Rate for Estimating Safety Management Cost in Civil Work (토목공사 안전관리비 적정요율 산정)

  • Son, Ki-Sang;Lee, Gi-Tae;Park, Jong-Keun;Park, Jung-Bong
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.4 s.76
    • /
    • pp.73-84
    • /
    • 2006
  • Standard safety management cost system was established in 1988 as a decree Number of 88-13, first time. And then, it has been revised fourteen times, up to now. A lot of practical investigations have been made for the revision but many problems at sites are continued to be put out so that it should be revised. This study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. Budget and actually performed amount of safety management costs in this study are investigated. costs for temporary work which is clarified in Japan is collected in order to compare domestic cost rate with Japanese one related to the total project amount. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

The Product Standard Costs System Constructionby Group and Application of Small and Medium Business (중소기업의 제품그룹별 표준원가시스템 구축 및 활용)

  • Kim, Pan-Soo
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.3
    • /
    • pp.153-168
    • /
    • 2011
  • In medium and small firm, the management system which is simple and where there is a practicality is required Ill)re than the management system which is complicated and minute of the centered around large company so that the introduction of the standard costs can be activated and it can be usefully used as a tool of management decisions. A difference between the standard costs introduction plan proposed in this paper and the preexistance study literature are as follows. In this paper, by breaking from the whole cost accounting aiming at all item, that is the traditional introduction method, and presenting the product cost accounting method by group the standards setting object was minimized and simplified. In this way, if the standards setting object is simplified, it is quick at the perimeter environment change as the little man power and flexibly it corresponds to and the cost information calculation which is exact with the setting up and maintenance of the efficient cost standard becomes available. As a result of applying for real through S corp., the usability of the method that the standard costs introduction method proposed in this paper produced the standard costs relatively short within period, it manages was verified. And the standard costs introduction method proposed in this paper went by the various cost information for each products, the management class did the management will decision which was objective and reasonable in the putting first.

A Study on the Estimating Rate of Safety Management Cost in Building Work (건축공사 안전관리비 비율 산정 모형에 관한 연구)

  • Son, Ki-Sang;Gal, Won-Mo;Yang, Hak-Su
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.5
    • /
    • pp.33-40
    • /
    • 2007
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basical data and material to be systemized.

A Study on Re-calculation of Recycling Standard Cost through the Analysis on Standard Cost (표준원가 분석을 통한 재활용 기준비용 재산정에 관한 연구)

  • Lee, Hee-Nahm;Choi, Yoon-Jeong
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.1
    • /
    • pp.189-193
    • /
    • 2011
  • The current standard cost for recycling applied under the Extended Producer Responsibility(EPR) institution, is not coping with continuously increased number of obligatory subject items as well as a variety of variable cost changing factors regarding the recycling treatment cost caused by price fluctuation such as increased material and labor cost entirely across the society; changes in recycling treatment process following the developing technologies; and changes in the required work forces and equipments followed by the trends of automated facilities. Despite such various cost fluctuation factors, the current EPR is not coping with the trends, making the re-calculation process difficult, which causes differences between the real treatment cost for recycling. In this study, the analysis was made on main factors affecting on the related cost and the related price changing index was calculated, by conducting the influence evaluation on the standard cost factors of the current standard cost for recycling. Through theses results, more objective standard will be set for the re-calculation of standard cost for recycling to greatly contribute to setting up the midterm and long-term strategies in the future towards efficient institution.

A Study on Calculation of Recycling Standard Cost for Efficient Operation of EPR (효율적인 EPR 운영을 위한 재활용 기준비용 산정에 관한 연구)

  • Lee, Hee-Nahm;Choi, Yoon-Jeong
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.1
    • /
    • pp.121-126
    • /
    • 2011
  • The provisions regarding the standard cost for recycling stated under the Extended Producer Responsibility (EPR) since 2002, include different and complicated obligatory steps to be taken on a variety of subject items regarding the collection, the transportation and the treatment, making the corporations face in their calculating and executing the standard cost. This study presents more objective calculation scope and standard for the purpose of efficient operation of the standard cost for recycling, in consideration of the general industry perception toward cost issue as well as domestic/overseas case studies regarding the standard cost for recycling. Besides, the study presents the checking items and the calculation contents per step to calculate the standard cost for recycling. Therefore, it is expected not only to be used as the objective standard to calculate the standard cost for recycling, but also to contribute to increasing the work efficiency in the following ongoing re-calculation process and to maintaining the consistent operation of the institution.

A Study on Improving the Occupational Safety and Health Management Cost Calculation Standards (산업안전보건관리비 계상기준 개선방안 연구)

  • An, Bang-Yul;Song, Tae-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.169-170
    • /
    • 2020
  • Occupational Safety and Health Management Cost, used to protect workers in Korean construction worksites and to create safe working environments, is a legally managed expense item. As this cost item is grounded on the Occupational Safety and Health Act, it is always implemented. However, because there is a ceiling on its rates, insufficient amounts of Safety Management Costs are often allocated to worksites, with the money not being used to areas essential to worker safety. As such, the current study raises the need to develop a set of standards to enable some items under the Occupational Safety and Health Management Costs-appropriated under the rate of indirect costs-to be appropriated as direct construction costs. As a preliminary step in this effort, the current study will provide basic data that can be used to create construction cost calculation standards for items that can be calculated as direct construction costs.

  • PDF

A Study on the Revitalization Method of National Carrier(Low cost carrier) Safety Management System (저비용항공사 체계적 안전관리 활동을 통한 경영활성화 방안에 대한 연구)

  • Min, Kyung-Chang;Hwang, Ho-Won
    • The Journal of Industrial Distribution & Business
    • /
    • v.9 no.6
    • /
    • pp.37-47
    • /
    • 2018
  • Purpose - In this study, the safety related tasks for low cost carriers' were examined and measures to improve them were suggested. As the air demand increases rapidly, number of passenger has mushroomed in Korea and in order to keep with the demand low cost carriers have played a role. However, low cost carriers' safety related tasks are not reliable level so far. Thus, in this study, the low cost carriers' current situations in terms of safety are investigated, especially regarding how well the ICAO's new safety policies are applied. Research design, data, and methodology - The results of the Ministry of Land, Infrastructure and Transportation' investigation are introduced and field study results are analysed. Current status of retaining experts, staffs, administrators in terms of aviation safety tasks of low cost carriers is compared to those of major airliner and low cost carriers' aviation safety culture is also analyzed by examining the systems and questioning staffs. Especially the culture regarding aviation safety is very important because the culture surrounding the safety tasks plays a major role in every respect of conducting the tasks. Results - Overall the current status of low cost carriers' aviation safety tasks is below standard. Especially retaining experts and staffs is basically below the required level. Also, system and organization to conduct safety tasks are not satisfactory. In particular, aviation safety culture is not settled to operate appropriately. Conclusions - The International Civil Aviation Organization (ICAO) and member states are continuing to launch new safety policies in response to the surging demand for air travel worldwide. The most urgent and important issue among the various safety policies is to reduce air accidents. In order to reduce the number of accidents, ICAO decided to reduce the number of accidents by using the Reactive Safety Management. ICAO has to ensure that each member country can implement proactive safety management for aviation safety. A safety management system (Safety Management System) is a system in which each member state implements a fulfillment standard. The current situation and problems of the safety management system for each airline are suggested and proposed for improvements.

A Study for the Improvement on Use Transparency of the Occupational Safety and Health Management Cost in Construction (건설업 산업안전보건관리비 사용 투명성 강화 방안 연구)

  • Lee, Sun Yong;Jeong, Seong-Choon;Oh, Se Wook
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.1
    • /
    • pp.34-44
    • /
    • 2020
  • The purpose of this study is to suggest ways to improve the transparency of occupational safety and health management cost (OSHMC) in order to create a safe working environment that can guarantee the health of construction workers. It was performed in the following procedures and methods. (1) collecting and analyzing resources related to the OSHMC in construction, (2) gathering stakeholder opinions for interviewing actual conditions, (3) deriving the improvement plans based on survey results and (4) suggesting direction for improvement of related laws based on the results of the research. As a result of this study, the following ways were found to be effective for enhancing transparency of the OSHMC in construction. (1) disclosure of usage details in sites, (2) Expansion of the standard for the OSHMC in construction, (3) Increase in fines for false use, (4) Establishment of the plan to improve the OSHMC ratio of small-scale construction sites, (5) Strengthen the role of supervisory and support organizations such as the Ministry of Employment and Labor and the Korea Occupational Safety & Health Agency. The result of this study is expected to be used as a basic data for future improvement of the occupational safety and health acts in Korea.

Estimating Relative Risk Level of Construction Work (건설공사 상대적 위험도 산정)

  • Son, Ki-Sang;Yang, Hak-Soo;Gal, Won-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.53-59
    • /
    • 2006
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.

A Study on the Improvement of Industrial Safety and Health Management Cost Using the Survey of Construction Safety Experts (건설안전전문가 설문조사를 활용한 현장중심의 안전관리비 제도 개선 연구)

  • Ko, Jae-Hwan
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.2
    • /
    • pp.331-342
    • /
    • 2020
  • Purpose: This study concerns the cost of safety management in order to prevent accidents and disabilities in the construction industry. The purpose of the Chapter is to draw up problems and improvement measures for these safety management costs. Method: A detailed questionnaire was developed for 20 construction safety managers for the research. This questionnaire was analyzed and implemented by the Expert Group Interview (FGI) analysis method. Results: In order to understand the safety management cost system, alternatives such as preparing a standard manual, implementing regular on-site training, and establishing a monitoring system for the safety management cost were derived. In addition, there is a need to ensure autonomy in the execution of flexible costs so that they can be deployed immediately in case of emergency to improve the 'efficiency and necessity of the safety negligence system'. And it was analyzed as items that should be improved due to excessive demand for documentation. Conclusion: Through this study, problems should be recognized for the improvement of the construction safety management cost system. And it will have to come up with policy-based and institutional-improvement measures for experts.