• Title/Summary/Keyword: spillway

Search Result 163, Processing Time 0.027 seconds

A STUDY ON THE SAFETY ANALYSIS OF ROCK FILL DAM (1) (필댐의 안정성 해석 연구 (1))

  • HoWoongShon;DaeKeunLee
    • Journal of the Korean Geophysical Society
    • /
    • v.6 no.3
    • /
    • pp.165-177
    • /
    • 2003
  • The purpose of this paper is to analyze the behavior and to study the safety evaluation of the Unmun Dam located in Cheongdo-Gun of GyeongBuk Province, Korea. For this purpose, soil analyses including boring data, geophysical surveys were conducted. In this paper, especially many geophysical methods were adopted to configure out the subsurface situation of dam. Applied geophysical methods were: 1) electric resistivity survey, 2) high frequency magnetotelluric (HFMT) survey, 3) ground penetrating radar (GPR) survey, 4) seismic refraction survey, 5) seismic cross-hole tomography survey, and 6) high frequency impedance (ZHF) survey. Each of geophysical surveys were analyzed and joint analyses between geophysical surveys were also performed to deduce the more reliable subsurface information of Dam by using the features and characteristics of each geophysical survey. Since many defects, such as gravel and weathered rock blocks in the dam core, and lots of amounts of leakage, by boring analyses were found, reinforcement by compaction grouting system (CGS) has been conducted in some range of dam. Some geophysical data and data of geotechnical gauges were also used to confirm the effects of reinforcement. Electric resistivity, EM, GPR, ZHF, seismic refraction and seismic tomography surveys show that left side of dam is weak, which means the possibility of existence of gravel, rock block, water and cavities in the core of dam. This result coincides with the boring data. Especially, electric survey after reinforcement shows that even the right side of the dam has been deformed by the strong pressure during the reinforcement itself. As a conclusion, some problems in the dam found. Especially, the dam near spillway shows the high possibility of leakage. It should be pointed out that only the left side of he dam has not a leakage problem. As a whole, the dam has problems of weakness, because of unsatisfactory construction. It is strongly recommended that highly intensive monitoring is required.

  • PDF

Availability test of eco-levee construction for presevation of bangudae petroglyphs (생태제방을 이용한 반구대암각화 보존방안 연구)

  • Lee, Seung-Oh;Chegal, Sun-Dong;Cho, Hong-Je
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.11
    • /
    • pp.931-939
    • /
    • 2016
  • Bangudae Petroglopys of the national treasure No. 285 located in elevation of 53 m to 57 m have been damaged by repetition of submergence and exposure due to the Sayeon-dam of EL.60 m constructed in down stream. In this study, as a preservation plan of the petroglyphs from the contact with water, the construction of eco-levee was suggested and its effect was investigated in the views of hydraulic engineering. It was designed to be located aside of 80 m from Bangudae Petroglyphs with the length of 440 m in streamwise direction, and it was need to construct a new channel maintaining the original hydraulic capacity and conveyance. Hydraulic characteristics such as water surface elevations and velocities near Bangudae Petroglyphs were measured after the eco-levee was installed in the hydraulic model with the scale of 1:50. It showed that there were not much changes of water surface elevations and velocities between sayeon-dam spillway EL. 60 m (Suggestion 1) and EL. 54 m (Suggestion 2). It was concluded the eco-levee could be made of natural materials like soil, pebble, gravel in terms of allowable velocity and shear stresses. The slope of water surface at Suggestion 2 was steeper, and velocities near Bangudae Petroglyphs were also faster than Suggestion 1. As the vorties occured at the left side in Suggestion 2, more detailed study is required.

A Comparative Study on Geotechnical System Response Probabilities of Fill Dams in Korea Using Internal Erosion Toolbox (내부 침식 평가 도구를 이용한 국내 필댐의 지반공학적 시스템 응답 확률에 대한 비교 연구)

  • Kim, Woo-Yong;Lim, Jeong-Yeul;Mok, Young-Jin;Jung, Young-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.245-258
    • /
    • 2016
  • In this study the geotechnical system response probabilities (SRP) of the failure modes caused by the interal erosion in three dams with different histories of defects in Korea were analyzed via the internal erosion toolbox developed by USACE. The calculated values of SRP were compared with the values reported for other dams in worldwide and also the statistics on the past failures of dams and embankments in Korea. The calculated values of SRP related to the internal erosion adjacent to the conduits or spillway structures are as high as in the order of $10^{-5}$ that is significantly greater than the SRP values related to other mechanisms of internal erosion. The statistical data showing that the interal erosion adjacent to the structure is the most frequent cause of the failure of the dam in Korea could be a collateral evidence of this finding. In contrast, the values of SRP related to the internal erosion through foundation, one of the major causes of dam failure in worldwide, are relatively as low as in the order of $10^{-7}$. This result could be comparable with the rareness of the failure cases of dam caused by the internal erosion through foundation in Korea.

Study on the Ratio of Catchment Area to Benefited Area in Case of Reservior (저수지의 유역대 가리면적비의 연구(I))

  • 김동규
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.10 no.2
    • /
    • pp.1443-1453
    • /
    • 1968
  • The reservoir is one of the important partsof facilities for development of irrigation water in Korea. Accordingly, construction of the reservoir will be stressed in the field of future development of agricultural water resources. In the meantime, storage capacity is actually is limited to some extent with various conditions. Acreage of benefited area shall be determined according to such conditions as catchment area, precipitation and unit water requirment within benefited area. According to results of the past construction of the reservoir, the ratio of catchment area to benefited area would be 4:1 to 2.5:1 or catchment area is approximately 2.5 times larger and over than benefited area. In order words, it is the ordinary practice in the construction of reservoir that benefited area should be less than 1/2.5 times as large as catchment area. Moreover, limitation of catchment area would prevent largely the vast drought-stricken area from being benefited by irrigation facilites. This has been, in fact, caused by the fact that a good deal of water stored in the reservoir overflows wastefully through spillway of the reservoir at th time of flood season, and that only very little of the overflowed water is available for irrigation. However, if the more wasted water is stored during the flood season, the larger area of farmland can irrigated. That is, catchment area can reduced to less than 2.5 times as large as benefited area. On the other hand, it is afraid that such reduction should bring about the increase of unit storage capacity. And storage capacity being maximized, costs for construction of the reservoir will be raised too highly, thus making the economics feasibility unfavorable. The purpose of this study is to decide the ratio of catchment area to benefited area toward the minimum level as possible in consideration of the hydrological and economic aspects. Kopung Project which is located in Sosan-kun, Chungnam Province is taken as an example for the review and analysis in this study, and as an example for crop, rice is taken. After consideration of this project, we can find out that annual average inflow is 726mm and annual average water requirements is 811mm. And the ratio of catchment area to benefited area is 1.2:1. This means that catchment area can be reduced even to 1.2 times as large as benefited area. In conclusion, this study reveals that the construction of reservoir is feasible in view of economic and technical points provided that catchment area is more than 1.5 times as large as benefited area.

  • PDF

Development of Evaluation Items and Indicators for Hydrological Safety on Agricultural Reservoir (농업용저수지 수문학적 안전성 평가 항목 및 지표 개발)

  • Lee, Jae Ju;Rhee, Kyoung Hoon;Park, Jong Seok;Han, Chang Wha;Jin, Wan Gyu
    • Journal of Wetlands Research
    • /
    • v.16 no.4
    • /
    • pp.403-411
    • /
    • 2014
  • This study Development of Evaluation Items and Indicators for Hydrological Safety on Agricultural Reservoir improvement and grasped the relative importance through stratification of the evaluation points through AHP technique exercised by group of experts. Below conclusion was acquired based on the study done. Firstly, the hierarchy of the evaluation items was divided into two layers: there were six upper evaluation items and eleven lower evaluation items. Secondly, using the analytic hierarchy process, the importance values of the six upper evaluation items were determined via the paired comparison questionnaire survey and consistency check, which were in the order of maintenance condition (condition evaluation grade), freeboard of levee body (non-overtopping), discharge capacity of spillway, potential flood damage, flood calculation factor and freeboard of downstream bank. The maintenance condition(condition evaluation grade) was significantly influenced the results of the hydrological safety on agricultural reservoir evaluation results. Finally, the study indicated that in the short term, improving the safety check condition evaluation grade will be useful to improve the hydrological safety of the agricultural reservoir because it can be performed immediately.

Hydraulic Investigation of Pyokkolche Reservoir (벽골제의 수공학적 고찰)

  • Lee, Jang-U
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.4
    • /
    • pp.397-406
    • /
    • 1998
  • The Pyokkolche Reservoir was constructed as a major public project of the ancient agricultural society, 1600 years ago. From a hydraulic point of view, it is considered to have been carried out with a distinguished technology. It should be in particular noticed that for a consecutive banking the main stream was diverted and drained to the Yonpo stream and the dam with same sea levels on its top along the whole length was built in a nearly straight line in spite of the different sea levels between both ends on the bottom. These suggest that the carrying out artifice and surveying technigue of those days were considerably excellent. However, the insufficient plan and design at the time of the construction, the temporary management and the repeated repair works in the later ages caused the Pyokkolche to lose its function. The Changsaenggeo and Kyungjanggeo gate sites being the facilities for sluices composed of a simple span and a vertical lift hand-operated sing a pully. The advantage of the geographical characteristics at both ends of the main dam was scientifically taken to these sites which also functioned as a spillway against a flood. The gate site of Suyogeo must have been located in an entrance to Suwolri, the northern end of the Pyokkolche and Yutonggeo is presumed to have been located on the right of Sangsori, the southern end of the Pyokklche. Keywords : Pyokkolche Reservoir, construction technology, gate site location.

  • PDF

Ancient Dujiangyan Irrigation System and Geographical Conditions in the Western Part of Sichuan Basin in China (중국(中國) 사천분지(四川盆地) 서부(西部)의 고대(古代) 관개시설(灌漑施設)과 지역적(地域的) 여건(與件) - 도강언(都江堰)의 경우 -)

  • Lee, Joon-Sun
    • Journal of the Korean association of regional geographers
    • /
    • v.8 no.1
    • /
    • pp.65-82
    • /
    • 2002
  • This study tries to examine the characteristics of the ancient Dujiangyan Irrigation System and geographical conditions in the western part of Sichuan Basin in China. The Dujiangyan System constructed in the third century B.C is located at the mouth of gorge of the River Mi. This spot shows that its altitude above sea level is higher than that of the three other rivers in this district. Also, this river reaches the maximum discharge. These facts reveal the spot has the great potentiality as an ideal location for man-made channels. Li Bing realized the "three magical projects": Yuzui and Jinggang Dyke(a water dividing dyke), Baopingkou(a water inlet), and Feishayan(a spillway). The dyke divided the River Min into two parts. The inner river is connected to the Baopingkou. And the Feishayan discharges flood and silt from the inner river to the outer. These projects have composed a scientific irrigation and drainage network. Finally, in the Chengdu Plain were digged a dozen channels for irrigation. Some of them are connected eastward to the River Bu. Since then the Dujiangyan System has been bring great benefits to agricultural production. This resulted in the population increase and establishment of new counties which have made the plain a "Land of Abundance".

  • PDF

Pull-out Resistance Characteristics of the Anchor Bar According to the Grouting Material (주입재료에 따른 Anchor Bar의 인발저항 특성)

  • Yea, Geu-Guwen;Song, Young-Suk
    • The Journal of Engineering Geology
    • /
    • v.18 no.2
    • /
    • pp.227-232
    • /
    • 2008
  • In this study, the pull out resistance characteristics of an anchor bar to support a spillway installed in a slope are investigated by field tests. The injection materials were a cement mortar and cement milk. Unconfined compression strengths of those materials under several conditions were measured. As the result of compression test, the unconfined compression strengths of the cement mortar and the cement milk have positive proportional relation-ship with the water-cement ratio. They also have negative proportional relationship with increasing the curing time. In the same condition of water-cement ratio and curing time, the unconfined compression strength of cement milk is larger than that of cement mortar. In order to reduce the eccentricity in anchor bar during pull-out test in the field, the installation apparatus was improved by inserting a nut type of steel fixing coupling into the anchor bar. As the result of the pull-out test, the strength modification of cement milk was increased steeply at the early curing time. However, that of cement mortar was increased gradually with passing the curing time. Therefore, the cement milk has to use as the injection material for a prompt construction of anchor bar because the strength modification of cement milk is occurred at the early curing time.

Evaluation of the Standard Support Pattern in Large Section Tunnel by Numerical Analysis and Field Measurement (수치해석 및 현장계측에 의한 대단면 터널 표준지보패턴의 적정성 검증)

  • Byun, Yoseph;Chung, Sungrae;Song, Simyung;Chun, Byungsik;Park, Duhee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.7
    • /
    • pp.5-12
    • /
    • 2011
  • When choosing the support pattern of tunnel, the characteristics of rock are identified from the result of the surface geologic survey, boring, and geophysical prospecting and laboratory test. And a rock mass rating is classified and excavation method and standard support pattern are designed considering rock classification, domestic and international construction practices, numerical analysis. According to the revised design standard for tunnel, it was recommended to classify the rock mass rating for the design of tunnel into a rating based on RMR. If necessary, it proposed a flexible standard allowed applying more atomized the rock mass rating and Q-System. Also, the resonable verification of the support pattern must be accompanied because the factors affecting the structure and behavior of ground during the construction of tunnel are the main factors of uncertainty factors such as the nature of ground, ground water and the characteristics of structural materials. These days, such verification method is getting more specialized and diversified. In this study, the empirical method, numerical analysis and comparative analysis of in situ measurements were used to prove the reasonableness in the support pattern by RMR and Q-value on the Imha Dam emergency spillway.

A Research on Applicability of Drone Photogrammetry for Dam Safety Inspection (드론 Photogrammetry 기반 댐 시설물 안전점검 적용성 연구)

  • DongSoon Park;Jin-Il Yu;Hojun You
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.5
    • /
    • pp.30-39
    • /
    • 2023
  • Large dams, which are critical infrastructures for disaster prevention, are exposed to various risks such as aging, floods, and earthquakes. Better dam safety inspection and diagnosis using digital transformation technologies are needed. Traditional visual inspection methods by human inspectors have several limitations, including many inaccessible areas, danger of working at heights, and know-how based subjective inspections. In this study, drone photogrammetry was performed on two large dams to evaluate the applicability of digital data-based dam safety inspection and propose a data management methodology for continuous use. High-quality 3D digital models with GSD (ground sampling distance) within 2.5 cm/pixel were generated by flat double grid missions and manual photography methods, despite reservoir water surface and electromagnetic interferences, and severe altitude differences ranging from 42 m to 99.9 m of dam heights. Geometry profiles of the as-built conditions were easily extracted from the generated 3D mesh models, orthomosaic images, and digital surface models. The effectiveness of monitoring dam deformation by photogrammetry was confirmed. Cracks and deterioration of dam concrete structures, such as spillways and intake towers, were detected and visualized efficiently using the digital 3D models. This can be used for safe inspection of inaccessible areas and avoiding risky tasks at heights. Furthermore, a methodology for mapping the inspection result onto the 3D digital model and structuring a relational database for managing deterioration information history was proposed. As a result of measuring the labor and time required for safety inspection at the SYG Dam spillway, the drone photogrammetry method was found to have a 48% productivity improvement effect compared to the conventional manpower visual inspection method. The drone photogrammetry-based dam safety inspection is considered very effective in improving work productivity and data reliability.