• 제목/요약/키워드: spare time

검색결과 243건 처리시간 0.026초

조달기간이 확률적인 경우의 예비품 주문정책 (A Spare Ordering Policy with Random Lead Times)

  • 윤성필;조태연
    • 품질경영학회지
    • /
    • 제35권1호
    • /
    • pp.20-23
    • /
    • 2007
  • A generalized spare ordering policy is treated in this paper. If the operating unit fails before a scheduled ordering time an expedited order is placed at the failure time instant, otherwise a regular order for a spare is placed at the scheduled time. The original unit is replaced when the ordered spare is delivered. The lifetime, regular and expedited lead times have general distributions. The problem is to find the optimum ordering time which minimizes the expected cost rate including the observation, ordering, uptime and down-time costs. Some properties regarding the optimal policy are derived. To explain the spare ordering policy a numerical example is also included.

Optimal pricing and spare parts manufacturing strategy for EOL (end-of life) services

  • Kim, Bo-Won;Ko, Deok-Soo
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회/대한산업공학회 2005년도 춘계공동학술대회 발표논문
    • /
    • pp.938-946
    • /
    • 2005
  • We study the firm's strategy to price its products and plan the spare parts manufacturing so as to maximize its profit and at the same time to fulfill its commitment to providing the customers with the key parts continuously over the relevant decision time horizon, i.e., the production plus warrantee period. To examine the research question, we developed and solved a two-stage optimal control theory model. Our analysis suggests that if the cost to produce the spare part during the warrantee period is more expensive than that during the production period, the firm should increase its sales price gradually throughout the production period to control its sales. In addition, during the production period it is optimal for the firm to produce the spare parts more than needed so that the overproduced spare parts can be used to partially meet the demand during the warrantee period. We conducted numerical analysis to investigate the sensitivity dynamics among key variables and parameters such as inventory holding cost, unit spare part production costs, part failure rate, and parameters in the demand function.

  • PDF

국외구매 무기체계에 대한 동시조달수리부속 선정 유전자 알고리즘 연구 (A Study on Genetic Algorithm of Concurrent Spare Part Selection for Imported Weapon Systems)

  • 조현기;김우제
    • 대한산업공학회지
    • /
    • 제36권3호
    • /
    • pp.164-175
    • /
    • 2010
  • In this study, we developed a genetic algorithm to find a near optimal solution of concurrent spare parts selection for the operational time period with limited information of weapon systems purchased from overseas. Through the analysis of time profiles related with system operations, we first define the optimization goal which maintains the expected system operating rate under the budget restrictions, and the number of failures and the lead time for each spare part are used to calculate the estimated total down time of the system. The genetic algorithm for CSP selection shows that the objective function minimizes the estimated total down time of systems with satisfying the restrictions. The method provided by this study can be applied to the generalized model of CSP selection for the systems purchased from overseas without provision of their full structure and adequate information.

정기보전 제도에서 응급수리를 고려한 대체품 수리정책에서의 비용분석 모델 (Cost Analysis Model with Minimal Repair of Spare Unit Repair Policy under Periodic Maintenance Policy)

  • 김재중
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제6권2호
    • /
    • pp.151-161
    • /
    • 2006
  • This article is concerned with cost analysis model in periodic maintenance policy. The repair policy is differently applied according as unit importance during an item being used and unit restoration during an item being failed. So in this paper the repair policy with minimal repair is considered as follow : as the occurrence of failure between minimal repair and periodic interval time, unit is replaced by a spare unit until the periodic maintenance time arrived. Then total expected cost per unit time is calculated according to scale parameter of failure distribution in a view of customer's. The total expected costs are included repair and usage cost : operating, fixed, minimal repair, periodic maintenance and spare unit cost. Numerical example is shown in which failure time of item has Erlang distribution.

  • PDF

초기보급 예비부품을 위한 예산결정 모델연구 (A Study on Budget Decision Model for Initial Provisioning Spare Parts)

  • 황흥석
    • 한국국방경영분석학회지
    • /
    • 제16권2호
    • /
    • pp.75-82
    • /
    • 1990
  • When the new equipment or weapon system is introduced to the operating unit its repair facilities and spare parts supply channels are not regularly generated. therefore, its required spare parts are initially supplied at the same time when the main equipment is deployed. For these circumstances, we are faced with the following problems : the first one is to decide the budget amounts to acquire the spare parts, the second is to choose the amounts of initial provisioning spare parts, and the third one is how to allocate the given budget for the initial provisioning spare parts. This paper emphasizes on determining the budget amounts, but also suggests the spare parts allocating methods.

  • PDF

Ordering Policy for Planned Maintenance with Salvage Value

  • Park, Young T.;Jing, Sun
    • International Journal of Quality Innovation
    • /
    • 제7권3호
    • /
    • pp.15-23
    • /
    • 2006
  • A spare ordering policy is considered for planned maintenance. Introducing the ordering, uptime, downtime, inventory costs and salvage value, we derive the expected cost effectiveness. The problem is to determine jointly the ordering time for a spare and the preventive replacement time for the operating unit which maximize the expected cost effectiveness. Some properties regarding the optimal policy are derived, and a numerical example is included to explain the proposed model.

생존성을 갖는 메쉬기반 광전송망에서의 효율적인 예비용량 설계방안에 관한 연구 (A Study of Efficient Spare Capacity Planning Scheme in Mesh-Based Survivable Fiber-Optic Networks)

  • 방형빈;김병기
    • 정보처리학회논문지C
    • /
    • 제10C권5호
    • /
    • pp.635-640
    • /
    • 2003
  • 정보통신 기술의 발전과 광범위한 통신망의 이용으로 인하여, 최근 생존성을 갖는 메쉬기반 네트워크의 설계는 주요 관심사가 되고 있다. 본 논문은 메쉬기반 광전송망에서의 예비용량 설계방안에 대해 논의한다. 본 연구에서는 메쉬기반 광전송망의 경로복구에 있어서, 예비용량 증가인자를 찾아 예비용량의 공유를 증가시키는 새로운 예비용량 설계방안을 제안한다. 정수계획법의 링크복구기법, SLPA, GA의 세 가지 다른 장애복구 방안과 더불어 제안한 방안의 성능을 비교한다. 이 방법은 예비 용량 할당을 결정하는데 있어서 휴리스틱 알고리즘과 결합하여 보다 우수한 성능을 보이고 있으며, 예비용량 할당을 결정하는 시간적인 면에서 대형 통신망으로 쉽게 확장할 수 있다. 이 새로운 방법의 주요 장점은 예비용량을 줄이고 다항식의 시간 복잡도를 갖는 것이다.

Some New Results on Uncertain Age Replacement Policy

  • Zhang, Chunxiao;Guo, Congrong
    • Industrial Engineering and Management Systems
    • /
    • 제12권1호
    • /
    • pp.41-45
    • /
    • 2013
  • Age replacement policy is a commonly policy in maintenance management of spare part. It means that a spare part is always replaced at failure or fixed time after its installation, whichever occurs first. An optimal age replacement policy of spare parts concerns with finding the optimal replacement time determined by minimizing the expected cost per unit time. The age of the part was generally assumed to be a random variable in the past literatures, but in many situations, there are few or even no observed data to estimate the probability distribution of part's lifetime. In order to solve this phenomenon, a new uncertain age replacement policy has been proposed recently, in which the age of the part was assumed to be an uncertain variable. This paper discusses the optimal age replacement policies by dealing with the parts' lifetimes as different distributed uncertain variables. Several results on the optimal age replacement time are provided when the lifetimes are described by the uncertain linear, zigzag and lognormal distributions.

장기사용 발전소 제어시스템의 예비모듈 수 결정 사례 (A Case Study on Determining the Number of Spare Modules in Power Plant Control System Used for Long Term)

  • 정창기;신윤오;박정원;함중걸
    • 품질경영학회지
    • /
    • 제28권1호
    • /
    • pp.210-219
    • /
    • 2000
  • When an electronic control system has been used for long time, the electronic control system becomes obsolete and no longer In production. In this case, the existing control system should replace by new system due to shortage of spare modules. However, if the proper number of spare modules are stocked, it may be possible and more economical than to replace by new system to extend the usage period of the existing control system. In this case, it is an important problem to determine the proper number of spare modules. In this paper, a method to determine the proper number of spare modules is presented with an application example.

  • PDF

철도건널목 열차도달 잔여시간 표시장치 개발 연구 (A Study On Development Train Reach Spare Time Indicate Device At The Railway Level Crossing)

  • 박기범;장우진;최규형
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2002년도 학술대회논문집
    • /
    • pp.117-124
    • /
    • 2002
  • Fixed distance control system at the railway level crossing have some problem. The problem is especially serious for high speed or low speed train. Therefore present developed device is fixed time control system. But fixed time control system haven't indicate device when train reach at the railway level crossing on alarm. This paper' result in study for train reach spare time indicate device.

  • PDF