• Title/Summary/Keyword: society of power trip

Search Result 122, Processing Time 0.057 seconds

A Study on the Protection and Measuring Algorithm of IED in Load Condition (부하상태를 고려한 IED 보호 및 계측 알고리즘에 관한 연구)

  • Lee, Sung-Hwan
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.36 no.4
    • /
    • pp.527-532
    • /
    • 2012
  • Recently, in power system, even though the needs of protective IED(Intelligent Electronic Device) is highly increased, there are some problems in the field when use the IED. When the IED is in the fluctuated overload condition, because of the existing algorithm calculate the trip time only with the measured current of just previous measuring stage, the calculated trip time is not a proper value for the overload protection at this kind of condition, and when the load current fluctuate between overload and normal condition, because of the instantaneous reset characteristic of existing algorithm the IED dose not trip. And the non linear loads using power electronic elements seem to be increased. These non linear loads require a counterplan about various harmonics incoming to electric power systems. So we will give solutions about these problems.

Research on a Stability of Feedwater Control System after Stretched Power Uprate and Replacement Steam Generator for Ulchin Units 1&2 (울진1,2호기 출력최적화 및 증기발생기 교체가 주급수 제어계통 안정도에 미치는 영향연구)

  • Yoon, Duk-Joo;Kim, In-Hwan;Kim, Sang-Yeol
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.8 no.2
    • /
    • pp.14-20
    • /
    • 2012
  • Full load rejection capability of nuclear power plant depends primarily on steam dump capacity (SDCAP) and steam generator level control capability. Recently, Ulchin Units 1&2 have performed stretched power uprate (SPU) and replacement steam generator (RSG) projects, which increase the power by 4.5 percent. They change major design or operating parameters and especially reduces steam dump capacity at full power due to increase of the steam flow. The reduction of SDC after SPU results in degradation of heat removal capability in full load rejection transients. Therefore, we should perform evaluation to determine whether reactor trips occur in large load rejection transients. Uchin Units 1&2 have experienced full load rejection (FLR) three times from 2004 to 2010. Operating data from the plant occurrence of FLR at Ulchin Units 1&2 showed that steam generator (SG) level transients were limiting in point of reactor trip. However the plant had never reached reactor trip in the FLR and successfully continued in house load operation. The parameters and setpoints for the SG will be changed if the SG is replaced. Therefore, we evaluated the appropriateness of steam dump, main feedwater and steam generator water level control system preventing the plant from reactor trip in case of FLR by the parameter sensitivity study whether SG water level operated smoothly after SPU and RSG projects.

Choosing an optimal connecting place of a nuclear power plant to a power system using Monte Carlo and LHS methods

  • Kiomarsi, Farshid;Shojaei, Ali Asghar;Soltani, Sepehr
    • Nuclear Engineering and Technology
    • /
    • v.52 no.7
    • /
    • pp.1587-1596
    • /
    • 2020
  • The location selection for nuclear power plants (NPP) is a strategic decision, which has significant impact operation of the plant and sustainable development of the region. Further, the ranking of the alternative locations and selection of the most suitable and efficient locations for NPPs is an important multi-criteria decision-making problem. In this paper, the non-sequential Monte Carlo probabilistic method and the Latin hypercube sampling probabilistic method are used to evaluate and select the optimal locations for NPP. These locations are identified by the power plant's onsite loads and the average of the lowest number of relay protection after the NPP's trip, based on electricity considerations. The results obtained from the proposed method indicate that in selecting the optimal location for an NPP after a power plant trip with the purpose of internal onsite loads of the power plant and the average of the lowest number of relay protection power system, on the IEEE RTS 24-bus system network given. This paper provides an effective and systematic study of the decision-making process for evaluating and selecting optimal locations for an NPP.

A Study on the Optimal Replacement Periods of Digital Control Computer's Components of Wolsung Nuclear Power Plant Unit 1 (월성 원자력 발전소 1호기의 디지탈 제어컴퓨터 부품들의 최적교체주기에 관한연구)

  • Mok, Jin-Il;Seong, Poong-Hyun
    • Nuclear Engineering and Technology
    • /
    • v.25 no.3
    • /
    • pp.430-436
    • /
    • 1993
  • Due to the failure of the instrument and control devices of nuclear power plants caused by aging, nuclear power plants occasionally trip. Even a trip of a single nuclear power plant (NPP) causes an extravagant economical loss and deteriorates public acceptance of nuclear power plants. Therefore, the replacement of the instrument and control devices with proper consideration of the aging effect is necessary in order to prevent the inadvertent trip. In this paper we investigated the optimal replacement periods of the control computer's components of Wolsung nuclear power plant Unit 1. We first derived mathematical models for optimal replacement periods to the digital control computer's components of Wolsung NPP Unit 1 and calculated the optimal replacement periods analytically. We compared the periods with the replacement periods currently used at Wolsung NPP Unit 1. The periods used at Wolsung is not based on mathematical analysis, but on empirical knowledge. As a consequence, the optimal replacement periods analytically obtained and those used in the field show a little difference.

  • PDF

Initiating Event Selection and Analysis for Probabilistic Safety Assessment of Korea Research Reactor (국내 연구용원자로 PSA 수행을 위한 초기사건 선정 및 빈도 분석)

  • Lee, Yoon-Hwan
    • Journal of the Korean Society of Safety
    • /
    • v.36 no.2
    • /
    • pp.101-110
    • /
    • 2021
  • This paper presents the results of an initiating event analysis as part of a Level 1 probabilistic safety assessment (PSA) for at-power internal events for the Korea Research Reactor (KRR). The PSA methodology is widely used to quantitatively assess the safety of research reactors (RRs) in the domestic nuclear industry. Initiating event frequencies are required to conduct a PSA, and they considerably affect the PSA results. Because there is no domestic database for domestic trip events, the safety of RRs is usually assessed using foreign databases. In this paper, operating experience data from the KRR for trip events were collected and analyzed in order to determine the frequency of specific initiating events. These frequencies were calculated using two approaches according to the event characteristics and data availability: (1) based on KRR operating experience or (2) using generic data.

Proposal of CPC Function Improvement

  • Lee, Byung-Il;Kim, Jong-Jin;Baek, Seung-Su;Kim, Hee-Cheol;Lee, Sang-Yong
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1995.05a
    • /
    • pp.562-567
    • /
    • 1995
  • The concept of VLDT (Variable Low DNBR Trip), a new CPC trip function, was proposed and applied to the events of increase in secondary heat removal, such as an excess feedwater event anti an IOSGADV (Inadvertent Opening S/G Atmospheric Dump Valve). Major assumption used in this study was no time delay to LOOP (Loss of Offsite Power) after turbine trip. In case of using this VLDT function, safety criterion of DNB would not be violated under the same condition as previous analysis without any change in thermal margin.

  • PDF