• 제목/요약/키워드: small unit

Search Result 1,792, Processing Time 0.031 seconds

Analysis on the Unit-Plans of Shinonome Canal Court Multi-dwellings Project in Japan (일본 공동주택 시노노메 캐널코트의 단위세대 주거평면 분석)

  • Suh, Kuee-Sook
    • Journal of the Korean housing association
    • /
    • v.19 no.2
    • /
    • pp.43-54
    • /
    • 2008
  • The aim of the research is to find out the direction of unit-plans in multi-dwellings for the future society. Shinonome Canal Court where residents actually live now are the objects in this study, and the residential floor plan of unit-plans were analyzed to find out the typical types. The analysis was focused on the unit-plans of 5 blocks of Shinonome Canal Court. Space Syntax Theory was used as the analysis method. As the first stage of the analysis, justified graphs were made to find out the characters of unit-plans through the classification of the graphs. Contents of the analysis are as follows: Relationship between classified justified graphs and dimension according to node number. Relationship between classified justified graph patterns and unit-plans. Characters of unit-plans in each blocks. Shinonome Canal Court consists of mainly small scale unit-plans and 30unit-plans are classified. 1LDK, 2LDK, 1LDK+S, 1LDK+f are typical unit-plans which are mainly supplied in the complex. It is noted that the results of the analysis by node, justified graph pattern and dimension are the same. It also presents diverse unit-plans which shows a change in nLDK pattern or add f (foyer), AN (annex), S (service room), Fs (free space) to basic nLDK type. In summary, it demonstrates the possibility of creating new residental floor plans in multi-dwellings.

A Design of Low-power/Small-area Arithmetic Units for Mobile 3D Graphic Accelerator (휴대형 3D 그래픽 가속기를 위한 저전력/저면적 산술 연산기 회로 설계)

  • Kim Chay-Hyeun;Shin Kyung-Wook
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.10 no.5
    • /
    • pp.857-864
    • /
    • 2006
  • This paper describes a design of low-power/small-area arithmetic circuits which are vector processing unit powering nit, divider unit and square-root unit for mobile 3D graphic accelerator. To achieve area-efficient and low-power implementation that is an essential consideration for mobile environment, the fixed-point f[mat of 16.16 is adopted instead of conventional floating-point format. The vector processing unit is designed using redundant binary(RB) arithmetic. As a result, it can operate 30% faster and obtained gate count reduction of 10%, compared to the conventional methods which consist of four multipliers and three adders. The powering nit, divider unit and square-root nit are based on logarithm number system. The binary-to-logarithm converter is designed using combinational logic based on six-region approximation method. So, the powering mit, divider unit and square-root unit reduce gate count when compared with lookup table implementation.

Computational Approach for the Analysis of Post-PKS Glycosylation Step

  • Kim, Ki-Bong;Park, Kie-Jung
    • Genomics & Informatics
    • /
    • v.6 no.4
    • /
    • pp.223-226
    • /
    • 2008
  • We introduce a computational approach for analysis of glycosylation in Post-PKS tailoring steps. It is a computational method to predict the deoxysugar biosynthesis unit pathway and the substrate specificity of glycosyltransferases involved in the glycosylation of polyketides. In this work, a directed and weighted graph is introduced to represent and predict the deoxysugar biosynthesis unit pathway. In addition, a homology based gene clustering method is used to predict the substrate specificity of glycosyltransferases. It is useful for the rational design of polyketide natural products, which leads to in silico drug discovery.

The Experimantal Study of the Performance Characteristics of Linear Induction Motor (선형유도전동기의 운전 특성에 관한 실험적 연구)

  • Kim, Bong-Seop;Jeong, Hyeon-Gap;Kim, In-Geun
    • 연구논문집
    • /
    • s.24
    • /
    • pp.49-61
    • /
    • 1994
  • In this paper, the experimental unit of the cross inductive radio line and two linear induction motors driven by IGBT inverter for train control was made. In actual condition, the track has straight line, but so as to be able to achieve in small space, the unit prepared was shaped into two circular plates. Then by detecting inductive signal, the position data could be obtained. Also the equipment representing speed and thrust of LIM and train position by means of the experimantal unit could be composed.

  • PDF

Analysis of Population Depending on Spatial Unit for Setting Suitable Spatial Unit to Rural Planning (농촌계획 수립에 적합한 공간단위 설정을 위한 공간 단위에 따른 인구 비교 분석)

  • Lee, Jimin
    • Journal of Korean Society of Rural Planning
    • /
    • v.25 no.3
    • /
    • pp.1-9
    • /
    • 2019
  • Population is important as a fundamental element of local industry and economy, and census data is essential to regional planning and policy making. Although there have been many researches on population and regional planning, there are few studies on population considering spatial unit. In this study, the population of three spatial scales were compared in order to establish the spatial unit suitable for the rural planning. The study area is Gangwon, Chungcheong-Nam, Chungcheong-Buk, Jeolla-Nam, Jeolla-Buk, Gyeonsang-Nam, Gyeonsang-Buk and Jeju province. Population were compared using statistical data analysis, GIS visualization, and spatial statistics. The mean, maximum, minimum, and variance of population were calculated and the coefficient of variation according to spatial unit was compared. The mean, maximum, minimum, and variance of population were calculated and the coefficient of variation according to spatial unit was compared. As the results, the census output area unit is difficult to interpret spatial analysis results. Administrative district unit has the limit that includes areas where the population does not live. The grid unit is well suited to the geographical characteristics but has many disadvantages of the grid with small population. Therefore, It is necessary to complement the limits of the Eup and Myeon-dong administrative district through the grid unit data.

Studies on the Derivation of the Instantaneous Unit Hydrograph for Small Watersheds of Main River Systems in Korea (한국주요빙계의 소유역에 대한 순간단위권 유도에 관한 연구 (I))

  • 이순혁
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.19 no.1
    • /
    • pp.4296-4311
    • /
    • 1977
  • This study was conducted to derive an Instantaneous Unit Hydrograph for the accurate and reliable unitgraph which can be used to the estimation and control of flood for the development of agricultural water resources and rational design of hydraulic structures. Eight small watersheds were selected as studying basins from Han, Geum, Nakdong, Yeongsan and Inchon River systems which may be considered as a main river systems in Korea. The area of small watersheds are within the range of 85 to 470$\textrm{km}^2$. It is to derive an accurate Instantaneous Unit Hydrograph under the condition of having a short duration of heavy rain and uniform rainfall intensity with the basic and reliable data of rainfall records, pluviographs, records of river stages and of the main river systems mentioned above. Investigation was carried out for the relations between measurable unitgraph and watershed characteristics such as watershed area, A, river length L, and centroid distance of the watershed area, Lca. Especially, this study laid emphasis on the derivation and application of Instantaneous Unit Hydrograph (IUH) by applying Nash's conceptual model and by using an electronic computer. I U H by Nash's conceptual model and I U H by flood routing which can be applied to the ungaged small watersheds were derived and compared with each other to the observed unitgraph. 1 U H for each small watersheds can be solved by using an electronic computer. The results summarized for these studies are as follows; 1. Distribution of uniform rainfall intensity appears in the analysis for the temporal rainfall pattern of selected heavy rainfall event. 2. Mean value of recession constants, Kl, is 0.931 in all watersheds observed. 3. Time to peak discharge, Tp, occurs at the position of 0.02 Tb, base length of hlrdrograph with an indication of lower value than that in larger watersheds. 4. Peak discharge, Qp, in relation to the watershed area, A, and effective rainfall, R, is found to be {{{{ { Q}_{ p} = { 0.895} over { { A}^{0.145 } } }}}} AR having high significance of correlation coefficient, 0.927, between peak discharge, Qp, and effective rainfall, R. Design chart for the peak discharge (refer to Fig. 15) with watershed area and effective rainfall was established by the author. 5. The mean slopes of main streams within the range of 1.46 meters per kilometer to 13.6 meter per kilometer. These indicate higher slopes in the small watersheds than those in larger watersheds. Lengths of main streams are within the range of 9.4 kilometer to 41.75 kilometer, which can be regarded as a short distance. It is remarkable thing that the time of flood concentration was more rapid in the small watersheds than that in the other larger watersheds. 6. Length of main stream, L, in relation to the watershed area, A, is found to be L=2.044A0.48 having a high significance of correlation coefficient, 0.968. 7. Watershed lag, Lg, in hrs in relation to the watershed area, A, and length of main stream, L, was derived as Lg=3.228 A0.904 L-1.293 with a high significance. On the other hand, It was found that watershed lag, Lg, could also be expressed as {{{{Lg=0.247 { ( { LLca} over { SQRT { S} } )}^{ 0.604} }}}} in connection with the product of main stream length and the centroid length of the basin of the watershed area, LLca which could be expressed as a measure of the shape and the size of the watershed with the slopes except watershed area, A. But the latter showed a lower correlation than that of the former in the significance test. Therefore, it can be concluded that watershed lag, Lg, is more closely related with the such watersheds characteristics as watershed area and length of main stream in the small watersheds. Empirical formula for the peak discharge per unit area, qp, ㎥/sec/$\textrm{km}^2$, was derived as qp=10-0.389-0.0424Lg with a high significance, r=0.91. This indicates that the peak discharge per unit area of the unitgraph is in inverse proportion to the watershed lag time. 8. The base length of the unitgraph, Tb, in connection with the watershed lag, Lg, was extra.essed as {{{{ { T}_{ b} =1.14+0.564( { Lg} over {24 } )}}}} which has defined with a high significance. 9. For the derivation of IUH by applying linear conceptual model, the storage constant, K, with the length of main stream, L, and slopes, S, was adopted as {{{{K=0.1197( {L } over { SQRT {S } } )}}}} with a highly significant correlation coefficient, 0.90. Gamma function argument, N, derived with such watershed characteristics as watershed area, A, river length, L, centroid distance of the basin of the watershed area, Lca, and slopes, S, was found to be N=49.2 A1.481L-2.202 Lca-1.297 S-0.112 with a high significance having the F value, 4.83, through analysis of variance. 10. According to the linear conceptual model, Formular established in relation to the time distribution, Peak discharge and time to peak discharge for instantaneous Unit Hydrograph when unit effective rainfall of unitgraph and dimension of watershed area are applied as 10mm, and $\textrm{km}^2$ respectively are as follows; Time distribution of IUH {{{{u(0, t)= { 2.78A} over {K GAMMA (N) } { e}^{-t/k } { (t.K)}^{N-1 } }}}} (㎥/sec) Peak discharge of IUH {{{{ {u(0, t) }_{max } = { 2.78A} over {K GAMMA (N) } { e}^{-(N-1) } { (N-1)}^{N-1 } }}}} (㎥/sec) Time to peak discharge of IUH tp=(N-1)K (hrs) 11. Through mathematical analysis in the recession curve of Hydrograph, It was confirmed that empirical formula of Gamma function argument, N, had connection with recession constant, Kl, peak discharge, QP, and time to peak discharge, tp, as {{{{{ K'} over { { t}_{ p} } = { 1} over {N-1 } - { ln { t} over { { t}_{p } } } over {ln { Q} over { { Q}_{p } } } }}}} where {{{{K'= { 1} over { { lnK}_{1 } } }}}} 12. Linking the two, empirical formulars for storage constant, K, and Gamma function argument, N, into closer relations with each other, derivation of unit hydrograph for the ungaged small watersheds can be established by having formulars for the time distribution and peak discharge of IUH as follows. Time distribution of IUH u(0, t)=23.2 A L-1S1/2 F(N, K, t) (㎥/sec) where {{{{F(N, K, t)= { { e}^{-t/k } { (t/K)}^{N-1 } } over { GAMMA (N) } }}}} Peak discharge of IUH) u(0, t)max=23.2 A L-1S1/2 F(N) (㎥/sec) where {{{{F(N)= { { e}^{-(N-1) } { (N-1)}^{N-1 } } over { GAMMA (N) } }}}} 13. The base length of the Time-Area Diagram for the IUH was given by {{{{C=0.778 { ( { LLca} over { SQRT { S} } )}^{0.423 } }}}} with correlation coefficient, 0.85, which has an indication of the relations to the length of main stream, L, centroid distance of the basin of the watershed area, Lca, and slopes, S. 14. Relative errors in the peak discharge of the IUH by using linear conceptual model and IUH by routing showed to be 2.5 and 16.9 percent respectively to the peak of observed unitgraph. Therefore, it confirmed that the accuracy of IUH using linear conceptual model was approaching more closely to the observed unitgraph than that of the flood routing in the small watersheds.

  • PDF

Establishment of Gun Head Unit for Electron Beam Machining System (전자빔건 헤드유니트의 설계와 제작)

  • Kang J.H.;Lee C.H.;Choi J.H.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.1875-1878
    • /
    • 2005
  • It is not efficient and scarcely out of the question to use commercial expensive electron beam lithography system widely used for semiconductor fabrication process for the manufacturing application field of various devices in the small business scope. Then scanning electron microscope based electron beam machining system is maybe regarded as a powerful model can be used for it simply. To get a complete suite of thus proper system, column unit build up with electron beam gun head unit is necessarily required more than anything else to modify scanning electron microscope. In this study, various components included ceramic isolation plate and main body which are essentially constructed for electron beam gun head unit are designed and manufactured. And this electron beam gun head unit will be used for next connected study in the development step of scanning electron microscope based electron beam machining system.

  • PDF

Study on the Accelerating Effect of an Accelerating Unit in Grinding using Machining Center (MC를 이용한 연삭시 증속기의 증속효과에 관한 연구)

  • Seo, Yeong-Il;Kim, Chang-Su;Choi, Hwan;Lee, Jong-Chan;Cheong, Seon-Hwan
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.16 no.3 s.96
    • /
    • pp.103-108
    • /
    • 1999
  • A problem in the grinding with a small diametric wheel is the decrease of wheel speed. In order to resolve this problem, an accelerating unit which increases the wheel speed is recommended. In this paper, the accelerating effect of an accelerating unit has been investigated through the side-cut grinding experiments performed with a vitrified bonded CBN wheel in a machining center(MC). The static stiffness, normal force, and machining error were measured in the experiments. As the accelerating unit is attached on the column of machining center, the static stiffness of tool system is largely decreased. But as the wheel speed increased by the accelerating unit, this problem is overcome and machining efficiency is improved. The lesser the quill stiffness was, the higher the accelerating effect became.

  • PDF

On the sampling unit (표본점단위(標本點單位)에 대(對)하여)

  • Kim, Kap Duk
    • Journal of Korean Society of Forest Science
    • /
    • v.4 no.1
    • /
    • pp.26-29
    • /
    • 1965
  • 1. The purpose of this study was to find out the best sampling form and sampling unit in forest survey. 2. The value of small sampling unit was over estimated in comparison with that of large sampling unit. 3. The value of circular form was over estimated in comparison with that of the others. 4. The smallest unit for estimation in area sampling were as follows. a) 0.06 ha. in the rectangular plot. b) 0.08 ha. in the square plot. c) 0.10 ha. in the circular plot. 5. Conclusion was as follows. The best sampling unit was 0.06 hectoare in the rectangular plot, which was most economic above all and gave preferable result for in the forest survey.

  • PDF