• Title/Summary/Keyword: site feasibility

Search Result 497, Processing Time 0.026 seconds

Clinical application of a new systematic implant planning concept: A Clinical Report

  • Jeong, Seung-Mi;Chung, Chae-Heon;Engelke, Wilfried
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.38 no.6
    • /
    • pp.814-820
    • /
    • 2000
  • Statement of Problem. Commonly used classification systems do not inform for dentists the dimension of the available bone at a potential implant site although regarding a variety of morphologic and pathophysiologic aspects using schematic graphs. However, for the implantologist the availability of bone substance is most important independent whether it concerns the jaw basis or the alveolus. Purpose of Study. The present article refers to a new evaluation form, to analyze the available bone with regard to optional immediate loading site by site. According to a new systematic implant planning concept will be presented in two case reports. Results. The feasibility of the classification for planning and documentation of immediately loaded implants is presented in two case reports. Conclusion. The factor of bone support for immediate functional stability is important in dental implantology. The new systematic implant planning helps to systematically estimate the dimension (ASCIi classification) of the alveolus site by site to evaluate the possibility of immediate loading. The Gottingen classification thus aids to determine the degree of stability that can be expected for the planned solution.

  • PDF

Development of a Groundwater Source Heat Pump in a Fractured Rock Aquifer (암반 대수층에서 개방형 지열 시스템의 개발 및 적용)

  • Shim, Byoung Ohan;Kim, Seong-Kyun;Choi, Hanna;Lee, Soo-Hyoung;Ha, Kyoochul;Kim, Yongchul
    • New & Renewable Energy
    • /
    • v.17 no.3
    • /
    • pp.32-41
    • /
    • 2021
  • A groundwater source heat pump (GWHP) was developed in this study by adapting a borehole heat exchanger with closed-loop and open-loop systems in a new building. In the pilot test building, the air-conditioning on the second floor was designed to employ a closed-loop system and that on the third floor had an open-loop system. The GWHP design is based on the feasibility of groundwater resources at the installation site. For the hydrogeological survey of the study site, pumping and injection tests were conducted, and the feasibility of GWHP installation was evaluated based on the air-conditioning load demand of the building. The site was found to be satisfactory for the design capacity of the thermal load and water quality. In addition, the effect of groundwater movement on the performance of the closed-loop system was tested under three different operational scenarios of groundwater pumping. The performance of the system was sustainable with groundwater flow but declined without appropriate groundwater flow. From long-term observations of the operation, the aquifer temperature change was less than 2℃ at the observation well and 5℃ at the injection well with respect to the initial groundwater temperature. This pilot study is expected to be of guidance for developing GWHPs at fractured rock aquifers.

A Pre-Feasibility Test of Introducing Renewable Energy Hybrid Systems -Case Studies for 3 Off-Grid Islands- (도서지역 신·재생복합 전력시스템 보급 타당성 분석 -3개 도서지역 분석결과-)

  • Jang, HaNa;Kim, Suduk
    • Environmental and Resource Economics Review
    • /
    • v.15 no.4
    • /
    • pp.693-712
    • /
    • 2006
  • A pre-feasibility test is done for renewable energy hybrid power systems at off~grid islands in which the current power supply is provided only by diesel generation. We apply Homer (Hybrid Optimization Model for Electric Renewables) which was developed by the National Renewable Energy Laboratory (NREL) for the analysis to identify the cost-minimizing combination of power generating facilities for the given load profiles. Chuja-Do, Geomun-Do and Youngsan-Do have been selected for our analysis considering the wind resources data of the Korea Institute of Energy Research (KIER). Information on wind speed, solar radiation and temperature is also used for the analysis. System component cost information from overseas market has been used due to the lack of domestic information. Site specific Load profile for electricity demand for those islands are reconstructed based on the partial survey results obtained form other sources. The LCOE of the least cost hybrid power systems for Chuja-Do, Geomun-Do and Youngsan-Do are $0.278/kWh, $0.234/kWh and $0.353/kWh, respectively Considering the fact that diesel generation is being subsidized at the price of $0.300/kWh by the government, first 2 cases are economically feasible for the introduction of renewable energy hybrid systems to those islands. But the third case of Youngsan-Do does not meet the criteria. The basic differences of these pre-feasibility test results are from the differences of the site specific renewable energy conditions, especially wind resources. In summary, promoting hybrid systems in the off-grid remote island should be based on the economic feasibility test results. Not all the off-grid islands are feasible for introducing this renewable energy hybrid system.

  • PDF

An Analysis of the Economy of Scale for Domestic On-site Hydrogen Fueling Stations (국내 분산형 수소충전소의 규모의 경제성 분석)

  • Gim, Bong-Jin;Kim, Jong-Wook
    • Journal of Energy Engineering
    • /
    • v.16 no.4
    • /
    • pp.170-180
    • /
    • 2007
  • This paper deals with the economy of scale for domestic on-site hydrogen stations fueled with natural gas and naptha. We evaluate the economic feasibility of on-site hydrogen stations with hydrogen production capacities of $30Nm^3/hr,\;100Nm^3/hr\;and\;300Nm^3/hr$. We build a classical economic feasibility model and we make some sensitivity analyses by changing the values of input factors such as the hydrogen sale price and the discount rate. The estimated hydrogen prices of steam methane reforming stations with production capacities of $30\;Nm^3/hr,\;100\;Nm^3/hr\;and\;300\;Nm^3/hr$ are 18,472 won/kg, 10,689 won/kg and 7,758 won/kg, respectively. Also, the hydrogen prices are about the same if we use naptha as a raw material for hydrogen energy instead of natural gas. It turns out that small and medium size domestic on-site hydrogen stations will not be economical in the near future. This indicates that we need to construct large scale on-site hydrogen fueling stations even for the initial phase of the hydrogen economy.

A Site Environment Analysis of NDGPS Reference Stations Co-operating for SBAS (NDGPS 기준국의 SBAS 기준국으로의 공동 활용을 위한 기준국 환경 분석)

  • Han, Young-hoon;Park, Sul-gee;Park, Sang-hyun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.20 no.9
    • /
    • pp.1696-1703
    • /
    • 2016
  • In this paper, it verifies site environment aspect that NDGPS (Nationwide Differential Global Positioning System) operated by MOF (Ministry of Oceans and Fisheries) will be used as the same site of reference stations for SBAS (Satellite Based Augmentation System). In order to prove this feasibility, we analyze the site environment requirements for SBAS reference stations, as well as we establish the procedure for the verification of the site environment requirements. With this procedure of the site environment survey, we perform site survey in the real field and analyze the results. We select interim candidate sites for survey which currently operating 17 NDGPS reference stations. This paper could be utilized in the process of selection or installation of reference stations in the field of GNSS(Global Navigation Satellite System) and the drawing the consideration which NDGPS reference stations will be co-operated as SBAS reference stations.

A Study on the Development and Application of Movable Partition Components for Facilitating of Long-life Housing (장수명 주택의 활성화를 위한 가동칸막이벽체 개발현황 연구)

  • Lee, Sung-Ok;Kim, Soo-Am
    • Journal of the Korean housing association
    • /
    • v.21 no.6
    • /
    • pp.91-98
    • /
    • 2010
  • The purpose of this study is to develop the feasibility of movable partition wall components that are able to correspond changes of structure system and spatial configuration by the needs of residents for the activation of long-life housing. The key element of various movable partition wall components, a movable partition wall, was analyzed for problems through both as-is analysis and field installation in Korea and Japan, and then its feasibility was verified. The movable partition wall can break the uniformity of a fixed one, can integrate and separate limited space by changes in the demands of residents, can be easy to separate, and can be independent. The development of the movable partition wall is important for the realization of diverse residential space, ease of remodeling, environment adaptation, promotion of modularization, etc. It is comprised of surfacing materials, core materials, structural materials, and movable parts. The domestic movable partition wall was verified regarding the feasibility of an apartment house through on-site inspections and sound insulation tests by KOHP21, KICT. In conclusion, the construction of long-life housing that has sustainable values in the use of housing is nationally an important assignment, so as to secure good housing stock.

A Study on the Wind rower Generation and Its Economic Feasibility at Daekwanryung (대관령 풍력단지의 풍력발전량 및 경제성 분석)

  • Ha Jeong-woo;Kim Suduk
    • Journal of Energy Engineering
    • /
    • v.14 no.2 s.42
    • /
    • pp.123-132
    • /
    • 2005
  • An economic feasibility study is performed for the wind power generation with the examination of the wind speed and its distribution at Daekwanryung at which a wind fm is under construction. In this analysis, the distribution of wind speed is the key issue. The wind distribution which is usually expressed in terms of Weibull distribution with shape factor and scale factor needs to be reexamined to find the proper values of them according to the empirical wind speed data. After this kind of analysis is done, annual power generation of wind is calculated. Due to the lack of cost information, we applied EWEA data instead or the actual information from the site. The result would be of use to determine the 'reference price' of wind power under the current system of 'compensating subsidy for renewable power generation'.

Economic Feasibility Study for Providing Co-generation System in various Type of Apartment Complexes (아파트단지의 특성에 따른 열병합발전도입의 경제성 비교연구)

  • Gi, Woo-Bong;Kim, Gwang-Ho;Lim, Hee-Jin;Yoon, Kyung-Shick;Jang, Hyuk-Bong;Kim, Dong-Hwan
    • New & Renewable Energy
    • /
    • v.3 no.1 s.9
    • /
    • pp.27-37
    • /
    • 2007
  • This study is to analyse the feasibility for providing Co-generation plant in Apartment Complex for 4 typical Apartment Complexes located Seoul metropolitan area, The selected complexes are three midium-large size Apartment[nearby 35pyoug of floor area] and one complex of small size Apartment[below 25 pyoung of floor area] for comparison. The necessary data for the study were collected with visitation of each site. The study showed very positive result for the three medium-large size Apartment Complexes of which the average floor area is more than 25 pyoungs, while negative result for the Complex of which average floor area is less than 25 pyoungs. Other than floor size it was found that the electric consumption density also influence the economic feasibility. In study the unit fixed cost of the energy produced from Co-generation plant is one third of the unit variable cost[fuel cost] and it seems better to select high thermal efficiency machine for Co-generation plant even with some higher cost of the plant.

  • PDF

Rubber bearing isolation for structures prone to earthquake - a cost effectiveness analysis

  • Islam, A.B.M. Saiful;Sodangi, Mahmoud
    • Earthquakes and Structures
    • /
    • v.19 no.4
    • /
    • pp.261-272
    • /
    • 2020
  • Recent severe earthquakes in and around the vital public places worldwide indicate the severe vulnerability of ground excitation to be assailed. Reducing the effect of seismic lateral load in structural design is an important conception. Essentially, seismic isolation is required to shield the superstructure in such a way that the building superstructure would not move when the ground is shaking. This study explores the effectiveness, design, and practical feasibility of base isolation systems to reduce seismic demands on buildings of varying elevations. Thus, static and dynamic analyses were conducted based on site-specific bi-directional earthquakes for base-isolated as well as fixed-based buildings. Remarkably, it was discovered that isolators used in low-rise to high-rise structures tend to significantly decrease the structural responses of seismic prone buildings. The higher allowable horizontal displacement induces structural flexibility and ensure good structural health of the building stories. Reinforcement from vertical and horizontal members can be reduced in significant amounts for BI buildings. Thus, although incorporating base isolators increases the initial outlay, it considerably diminishes the total structural cost.

The Usefulness of Pre-operative Infertility Work-up in Assessing the Reversal Feasibility (난관복원술전에 실시한 불임검사의 임신율 예측지표로서의 유용성에 관한 연구)

  • Kang, Byung-Moon
    • Clinical and Experimental Reproductive Medicine
    • /
    • v.20 no.1
    • /
    • pp.71-78
    • /
    • 1993
  • Since the successful advent of IVF-ET, reproductive surgeons have been forced to compare pregnancy outcomes of surgical procedures for tubal infertility with those of IVF-ET. The current study was designed in an effort to determine the usefulness of pre-operative infertility work-up, especially diagnostic laparoscopy, in predicting the pregnancy rate and in assessing the reversal feasibility. 109 patients who underwent a microsurgical tubal reversal were reviewed. The patients were followed over one year. The total intrauterine pregnancy, spontaneous abortion, and ectopic pregnancy rates were 66.4%, 3.7%, and 7.3%, respectively. The result showed that the use of loupe might increase the chance of the ectopic pregnancy. I found that the final tubal length, especially the longest tubal length, the site of reanastomosis, and the methods of sterilization affected the pregnancy rates. A 85% intrauterine pregnancy rate was achieved in the patients with good preoperative assessments(Group II-1). There was only 10% incidence of intrauterine pregnancy in the patients with bad assessments(Group II-2). It is concluded that the pre-operative infertility work-up, especially diagnostic laparoscopy, is a good diagnostic tool in assessing the reversal feasibility.

  • PDF