• Title/Summary/Keyword: site feasibility

Search Result 494, Processing Time 0.026 seconds

A Study of Assessment Method for Site Feasibility of Municipal Solid Waste Incineration (생활폐기물소각장의 입지타당성 평가기법)

  • Lee, Mu-Choon
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.2
    • /
    • pp.123-135
    • /
    • 1997
  • The solid waste incineration facilities which cause environmental pollution. And those are some kind of loathing facilities for residents who do not want it. This problem could be solved by location feasibility study. The purpose of location feasibility study was to determine one site out of three candidate sites. This study which was done by the law, environmental and economic factor was considered for optimum site selection. Comparative evaluation among the candidate sites was done by ordinal scale and thus the optimum site was selected.

  • PDF

A Study on the Feasibility Assessment for Selecting Recreation Forest Sites: The Case of Gwangju-si in Gyeonggi-do (휴양림 조성 대상지 선정을 위한 타당성 평가 연구 - 경기도 광주시를 중심으로 -)

  • Seo, Jung-young;Yeom, Sung-Jin
    • Journal of Environmental Science International
    • /
    • v.28 no.11
    • /
    • pp.959-969
    • /
    • 2019
  • This study sought to contribute to the revitalization of local economy by developing a natural recreation forest, which is the base of ecotourism recreation, through utilizing forest resources and the natural environment of Gwangju-si. The study conducted a feasibility assessment through on-site surveys such as the suitability of the candidate sites, location analysis, and possibility of damage to the forest, before developing recreation forest sites in Gwangju-si and, based on the result, selected appropriate subject sites. The candidates for this study were 5 forest sites such as one site in the Mokheon-dong area, two in the Docheok-myeon area, and one in the Toechon-myeon area. For this study, the current status of the natural recreation forest was surveyed, its feasibility index and assessment process were investigated, and the local status and related regulations of Gyeonggi-do and Gwangju-si were reviewed. The final subject sites were selected after feasibility assessment utilizing assessment index in order to evaluate the candidate sites. The feasibility assessment was conducted after three separate on-site surveys for each candidate site between October 2018 and January 2019 utilizing "The Feasibility Assessment Criteria for Natural Recreation Forest (Notification 2018-71)" of the Korean Forest Service. The items instrumental to the feasibility assessment were classified into landscape, location, water system, induction of recreation, and development condition; the assessment was made after redefining each item into detailed items. Through this process, the Usan-ri area was selected as the final site for developing natural recreation forest, having obtained more than 100 points according to "The Feasibility Assessment Criteria for Natural Recreation Forest" of the Korean Forest Service. In order to develop natural recreation forest in the Usan-ri area in the future, further discussion is necessary with the relevant departments in consideration of the degree of ecological zoning map.

Evaluation of Air Quality and Site Feasibility for the Construction of the Incineration Facilities in Won Ju City (원주시 소각시설의 입지와 주변지역의 대기질예측에 관한 연구 - 입지여건의 평가를 중심으로)

  • 송동웅;김기현
    • Journal of Environmental Science International
    • /
    • v.9 no.1
    • /
    • pp.65-74
    • /
    • 2000
  • In this study, we investigated the site feasibility for the construction of the incineration facilities in Won Ju City. To assess the environmental impact of its construction, we examined the current status of air quality in the selected candidate sites and predicted the extent of air quality change upon its operation through modification of stack type. If the stack height is assumed to be 70 m, the concentrations of $SO_2$ and dioxin in the surrounding area were predicted to increase by 0.05 ppb and 0.09 pg/$m^3$, respectively. The impact of its operation was assessed and compared among different sites. According to this analysis, more impact was expected from the residential area for the Dan-Gye site than from agricultural areas of the Kwan-Sul and Sa-Je site.

  • PDF

A Basic Study on the Economic Feasibility Analysis of Busan Central Library Construction (부산대표도서관 건립의 경제적 타당성 분석에 관한 기초연구)

  • Kang, Hee-Kyung;Chang, Durk-Hyun;Lee, Soo-Sang
    • Journal of Korean Library and Information Science Society
    • /
    • v.45 no.3
    • /
    • pp.489-511
    • /
    • 2014
  • The purpose of this basic study is to examine the economic feasibility analysis of Busan Central Library, which was included the construction feasibility analysis conducted as one part of the Busan Central Library Construction Master Plan. To achieve the purpose of this study, it was accomplished to do Benefit-Cost analysis, Net Present Value, Internal Rate of Return. CVM(Contingent Valuation Method) was used for calculating the benefit; we investigated two CVMs for Busan Central Library, which are for central construction site and for outer construction site. The results show that the construction of Busan Central Library in the central site would be feasible from the economic point of view. On the contrary, the construction in the outer site would not be feasible economically.

Developing a Methodology for Stakeholder Participation in Site Feasibility Studies for Offshore Wind Farms (해상풍력 입지타당성 조사단계에서의 이해관계자 참여 방법론 개발)

  • Jongmun Park;Kongjang Cho
    • Journal of Wind Energy
    • /
    • v.14 no.2
    • /
    • pp.5-13
    • /
    • 2023
  • As offshore wind farms are developed, the importance of cooperation with stakeholders such as fishermen from the initial phase is gradually increasing. This study developed a methodology that can promote the involvement of fishermen in the site feasibility review process. The spatial scope is Gunsan City, which is establishing an initial offshore wind project strategy. A survey was conducted for representatives of 12 fishing villages on the location preference for offshore wind farms. As a result, fishermen suggested negotiable or absolute opposite locations by examining a local sea map. Location preference seems to depend on the degrees of vitalization of fisheries using vessels. This study shows that fishermen can have reasonable opinions according to the location, not unconditionally, in initial discussions on offshore wind power. Investigating stakeholders with various positions is essential, and adjustments are needed for conflicting points in the future.

Feasibility Assessment of Small Hydro Power Plants Using Diversion Weirs for Agricultural Purpose (농업용 보를 이용한 소수력발전소의 타당성 분석)

  • Lee, Chul-Hyung;Park, Wan-Soon
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2011.04a
    • /
    • pp.229-234
    • /
    • 2011
  • Feasibility assessment for small hydropower plants using diversion weirs located in stream for agricultural purpose has been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the inflow caused from rainfall. And another model to predict hydrologic performance for small hydropower plants is established. Preliminary survey was performed identifying several candidate sites, and two sites were selected finally for actual site reconnaissance. During the course of site survey, generating capacity, construction and equipment cost, and payback through life time of each sites were calculated for economical feasibility analysis. The results of this study have estimated that the small hydropower plants using diversion weirs for agricultural purpose may offer better opportunities in future with increasing fuel cost and nation's energy policy.

  • PDF

The Feasibility Study of Low-rise Housing Plans on Hilly Site and Design Model Proposals (경사지 활용 저층 집합주택의 개발가능성과 경사도별 모델 제안)

  • Lee, Hyun-Jin;Yang, Woo-Hyun
    • Journal of the Korean housing association
    • /
    • v.20 no.1
    • /
    • pp.45-58
    • /
    • 2009
  • This research starts from the questioning of current housing development on the hilly site in Korea. It aims to investigate various design techniques of low-rise housing as an alternative housing plan on hilly sites. Several generic solutions of the combination of building type and road pattern are tested for a simulation process, and evaluated in terms of crucial design issues; development density, parking space and open space. As a result, four reasonable models are selected for making full use of geographical features of hilly site, two models each land slope of $18^{\circ}$ and $26^{\circ}$. Several design techniques for each model are also suggested, in ensuring the development feasibility by considering land slope, vehicular access and parking, common open space, and community facilities.

Feasibility Analysis of Row-Rise Housing Plan on Hilly Sites (구릉지를 활용한 저층 집합주택 계획의 타당성 분석)

  • Lee, Hyun-Jin;Yoon, Yong-Suk;Yang, Woo-Hyun
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.04a
    • /
    • pp.259-265
    • /
    • 2008
  • This research starts from the questioning of current housing development situation on hilly sites in Korea. It aims to investigate various design techniques of row-rise housing as an alternative housing type on hilly sites. Several generic solutions are proposed by considering the density of dwelling, parking plans, exterior space and access patterns, making full use of geographical features of hilly site and existing facilities. In order to promote development feasibility of proposed plans, the efficiency of the proposed techniques are verified in terms of development density, enhancement of community space, habitability of housing.

  • PDF

Feasibility Study of Fine Dust Removal Technology in Construction Site (건설현장 미세먼지 제거기술의 타당성 분석)

  • Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.120-121
    • /
    • 2019
  • The construction industry is known to be one of the representative industries that generate fine dust. Therefore, reducing the amount of fine dust generated in construction sites is very important for the overall fine dust management. Based on this, this study proposed the concept of fine dust measurement and removal technology combined with advanced technologies such as drones and IoT. The qualitative, quantitative and risk elimination effects that can be expected when applying the proposed technique are analyzed. We will verify the effectiveness of the proposed concept through system development and field application, and evaluate specific economic feasibility through cost analysis. The proposed concept will be validated through system development and field application and evaluated specific economics through cost analysis.

  • PDF

EVALUATING THE FEASIBILITY OF THE HIGHWAY ENGINEERING SCHEDULE USING SIMULATION TECHNIQUE

  • Liu Weijun;Yuan Jianbo;Zhang Jianren
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.897-901
    • /
    • 2005
  • In the highway engineering, the performance, quantity and status of machines available for the project have direct impact on the project time. For instance, the status of machines, such as working or in trouble, have great influence on the activity execution. Therefore, while scheduling the project, the project manager always increases the spare machines or prolong the activity time to avoid delaying the project time when some of the machines are in trouble in construction site. However, how many are the spare machines and how long are the prolonged activity time, which are estimated subjectively by the manager. This subjective estimation has been criticized for systematically overestimating or underestimating quantity of the machines and the activity time. In the paper, we propose and prototype a model to simulate the status of the machines in construction site, and then to evaluate the schedule feasibility considering the performance, quantity and statues of the machines involved.

  • PDF