• Title/Summary/Keyword: site effects

Search Result 2,595, Processing Time 0.026 seconds

Strong ground motion characteristics of the 2011 Van Earthquake of Turkey: Implications of seismological aspects on engineering parameters

  • Beyen, Kemal;Tanircan, Gulum
    • Earthquakes and Structures
    • /
    • v.8 no.6
    • /
    • pp.1363-1386
    • /
    • 2015
  • The October 23 2011 Van Earthquake is studied from an earthquake engineering point of view. Strong ground motion processing was performed to investigate features of the earthquake source, forward directivity effects during the rupture process as well as local site effects. Strong motion characteristics were investigated in terms of peak ground motion and spectral acceleration values. Directiviy effects were discussed in detail via elastic response spectra and wide band spectograms to see the high frequency energy distributions. Source parameters and slip distribution results of the earthquake which had been proposed by different researchers were summarized. Influence of the source parameters on structural response were shown by comparing elastic response spectra of Muradiye synthetic records which were performed by broadband strong motion simulations of the earthquake. It has been emphasized that characteristics of the earthquake rupture dynamics and their effects on structural design might be investigated from a multidisciplinary point of view. Seismotectonic calculations (e.g., slip pattern, rupture velocity) may be extended relating different engineering parameters (e.g., interstorey drifts, spectral accelerations) across different disciplines while using code based seismic design approaches. Current state of the art building codes still far from fully reflecting earthquake source related parameters into design rules. Some of those deficiencies and recent efforts to overcome these problems were also mentioned. Next generation ground motion prediction equations (GMPEs) may be incorporated with certain site categories for site effects. Likewise in the 2011 Van Earthquake, Reverse/Oblique earthquakes indicate that GMPEs need to be feasible to a wider range of magnitudes and distances in engineering practice. Due to the reverse faulting with large slip and dip angles, vertical displacements along with directivity and fault normal effects might significantly affect the engineering structures. Main reason of excessive damage in the town of Erciş can be attributed to these factors. Such effects should be considered in advance through the establishment of vertical design spectra and effects might be incorporated in the available GMPEs.

Wind-induced response and loads for the Confederation Bridge -Part II: derivation of wind loads

  • Bakht, Bilal;King, J. Peter C.;Bartlett, F.M.
    • Wind and Structures
    • /
    • v.16 no.4
    • /
    • pp.393-409
    • /
    • 2013
  • This paper uses ten years of on-site monitoring data for the Confederation Bridge to derive wind loads and investigate whether the bridge has experienced its design wind force effects since its completion in 1997. The load effects derived using loads from the on-site monitoring data are compared to the load effects derived using loads from the 1994 and 2009 wind tunnel aerodynamic model tests. The research shows, for the first time, that the aerodynamic model-based methodology originally developed in 1994 is a very accurate method for deriving wind loads for structural design. The research also confirms that the bridge has not experienced its specified (i.e., unfactored) wind force effects since it was opened to traffic in 1997, even during the most severe event that has occurred during this period.

A study on the Use of site related to the site characteristics of the Elementary School in GwangJu-city (초등학교 입지특성에 따른 교지 이용에 관한 조사연구)

  • Kang, Man-Ho;Jeong, Joo-Seung;Joo, Seok-Joong
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.11 no.4
    • /
    • pp.15-24
    • /
    • 2004
  • The purpose of this study is to suggest some alternative on site planning of elementary school through investigating the effects of geographical and urban environment on the site. For this, we selected and surveyed 35 schools in Gwangju. The results of this study are as follows. 1) We cannot find out the differences from the use of elementary schools sites on slopes of sites. However, the sunken space between H type buildings in the site slopes facing east or west and the placing the playground on the north side of the site slopes facing north have some problems 2) The number of adjacent road and surrounding environment didn't show any effect. To separate between cars and pedestrians, we need some plans to block cars on the pedestrian gateway and it is much better to intensify the parking area near the school gate that cars come in and out. 3) The degree of satisfaction on the outdoor facilities of these cases shows low level. Therefore, to use the site of schools efficiently, we should secure the spacious playground and make plans to provide some spaces around school building for the static activities of students and teachers. 4) Most of all, the site which is suitable for educational environment should be selected. and also Special Code on the urban plan should be established to develop this one.

A Parametric Study on Site Amplification using Equivalent Linear Analysis (등가선형해석을 이용한 지반증폭 영향 요소 연구)

  • 김동수
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2000.10a
    • /
    • pp.98-107
    • /
    • 2000
  • Free-field ground motion during earthquake is significantly affected by the local site conditions and it is essential for the seismic design to perform the ground response analysis In this study, ground response analyses based on the equivalent linear method were carried out to evaluate the effects of various ground conditions on the site amplification. Four major factors including the depth of the site(very soft and dense soil), the impedance ratio between soil layer and bed rock, linear analysis versus equivalent linear analysis, and the location of soft soil layer were deeply discussed. Based on the analysis results, the importance of various local site conditions on the site amplification was emphasized.

  • PDF

Effects of A-Site and B-Site Vacancies on Structural and Dielectric Properties of PLZT Ceramics

  • Jeong, Cheol-Su;Park, Hyu-Bum;Hong, Young-Sik;Kim, Si-Joong
    • The Korean Journal of Ceramics
    • /
    • v.2 no.2
    • /
    • pp.76-82
    • /
    • 1996
  • PLZT ceramics having two nominal compositions, $Pb_{1-3x/2}La_xV_{x/2}(Zr_{03}Ti_{03})O_3$ and $Pb_{1-x}La_x(Zr_{0.2}Ti_{0.5})_{1-x/4}V_{x/4}O_3$ (V: vacancy) with x=0.00~0.30, were prepared. The physical, structural, and dielectric properties were investigated by X-ray diffraction, scanning electron microscopy, Raman spectroscopy, and measurements of bulk density and dielectric constant. The two series with A-stie and B-site vacancies showed different physical, structural, dielectric properties, and, specially, Curie temperature. In comparison to PLZT with B-site vacancies, PLZT with A-site vacancies showed high Curie temperatures and low maxima of dielectric constant. Consequently, it is evident that the properties of PLZT ceramics depend on the vacancy formula adopted as a batch composition in preparation.

  • PDF

Increasing Infiltration with Pervious Drainage facilities -The Effect of Simulation in Bun-Dang New town, Korea- (단지개발에 있어 강수량 지하침투 증대를 위한 침투시설의 도입가능성 연구 -분당신도시 사례를 중심으로-)

  • 김두하;박원규;안동만
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.25 no.1
    • /
    • pp.62-72
    • /
    • 1997
  • As a site is built up, runoff increases inevitably. This results in water deficit in the site and possible downstream flooding. It may cause irreversible site ecosystem disturbance. This study examined some techniques of increasing infiltration rates in a site development. The possible effects of applying such techniques at a new town development are calculated for four types of land uses-business area, low/high density residential areas, and park area- of Bun-Dang New Town. If the higher infiltration drainage systems are introduced, there may be additional infiltration of the precipitation as much as 59.8% in business area, 74.6% in low density residential area, 51.4% in high density residential area and 32.7% in park area. This much increase of infiltration, or decrease of runoff, may improve site water balance, and thus keep the site ecosystem much healthier.

  • PDF

Seismic Response Analyses of the Structure-Soil System for the Evaluation of the Limits of the Site Coefficients (지반계수의 한계값 평가를 위한 구조물-지반체계에 대한 지진응답해석)

  • Kim, Yong-Seok
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.11 no.1 s.53
    • /
    • pp.67-77
    • /
    • 2007
  • Site coefficients in IBC and KBC codes have some limits to predict the rational seismic responses of a structure, because they take into account only the effect of the soil amplification without the effects of the structure-soil interaction. In this study, upper and lower limits of the site coefficients are estimated through the pseudo 3-D elastic seismic response analyses of structures built on the linear or nonlinear soil layers taking Into account the effects of the structure-soil interaction. Soil characteristics of site classes of A, B and C were assumed to be linear, and those of site classes of D and E were done to be nonlinear and the Ramberg-Osgood model was used to evaluate shear modulus and damping ratio of a soil layer depending on the shear wave velocity of the soil layer, Seismic analyses were performed with 12 weak or moderate earthquake records scaled the peak acceleration to 0.1g or 0.2g and deconvoluted as earthquake records at the bedrock located at 30m deep under the outcrop. With the study results of the elastic seismic response analyses of structures, new standard response spectrum and upper and lower limits of the site coefficients of $F_{a}\;and\;F_{v}$ at the short period range and the period of 1 second are suggested including the effects of the structure-soil interaction, and new site coefficients for the KBC code are also suggested.

Estimation of Site Response Characteristics at Town Fortress Areas Damaged by Historical Earthquakes (역사 지진 피해 발생 읍성 지역의 부지 응답 특성 평가)

  • Sun, Chang-Guk;Bang, Eun-Seok;Chung, Choong-Ki;Kim, Dong-Soo
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2006.03a
    • /
    • pp.125-132
    • /
    • 2006
  • To estimate the local site effects at two town fortress areas where stone parapets were collapsed during historical earthquakes, site characteristics were evaluated using borehole drillings and seismic tests and equivalent-linear site response analyses were conducted based on the shear wave velocity (Vs) profiles determined from site investigations. The study sites are categorized as site classes C and B according to the mean Vs to 30 m ranging from 500 to 850 m/s, and their site periods are distributed in short period range of 0.06 to 0.16 sec. For site class C in the study areas, the short-period (0.1-0.5 sec) and mid-period (0.4-2.0 sec) site coefficients, $F_{\alpha}$ and $F_\nu$ specified in the Korean seismic design guide, underestimate the ground motion in short-period band and overestimate the ground motion in mid-period band, respectively, due to the characteristics showing high amplification in short period range, which can result in the collapse of stone parapets having the short natural period.

  • PDF

FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

Engineering Impact Assessment of the Site Coefficients In the Current Highway Bridge Code of Korea (현행 도로교시방서의 지반계수에 대한 공학적 영향평가)

  • 조양희
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 1998.04a
    • /
    • pp.89-97
    • /
    • 1998
  • This study is intended to investigate the seismic responses of bridge structures considering site effects. The site effects in the seismic analysis of bridge structures were classified into two parts. At first, the seismic responses of the structures on each "soil profile types" of the code were evaluated in accordance with code-specified method and compared with results of time-history analysis method. And next, as a second stage of the study, the responses of the two different soil with considerably different soil properties, even though they are classified to the same "soil profile types" of the code, were evaluated and compared each other. The first part of study is purposed to evaluate the applicability of code-specified method, while the other part is purposed to find the variance of the seismic responses from the different soil sites in the same soil profile types of the code. For the analysis, two major methods of the code, single-mode spectral anaysis and multi-mode spectral analysis, were used and the time-history analysis method which is expected to give more accurate responses was also used for the comparison purposes. For the time-history analysis, time-domain analysis technique of the lumped-mass model with frequency-independent soil springs and dampers was adopted and artificially generated spectra of the code was used as input motion. As the results of the study, the code specified methods for the seismic responses considering the site effects were verified to give the results in conservative side for the most of the cases. However, for the structures on the site with considerable flexibility, the responses of the bridge girders or deckplates by the code methods both in section forces and horizontal movement responses, may have much smaller values than the actual responses. Therefore, more detailed analysis considering the flexibility of the base soil may be required to have more reasonable results in girder responses.in girder responses.

  • PDF