• 제목/요약/키워드: site assessment

Search Result 1,783, Processing Time 0.223 seconds

Development of logical structure for multi-unit probabilistic safety assessment

  • Lim, Ho-Gon;Kim, Dong-San;Han, Sang Hoon;Yang, Joon Eon
    • Nuclear Engineering and Technology
    • /
    • v.50 no.8
    • /
    • pp.1210-1216
    • /
    • 2018
  • Site or multi-unit (MU) risk assessment has been a major issue in the field of nuclear safety study since the Fukushima accident in 2011. There have been few methods or experiences for MU risk assessment because the Fukushima accident was the first real MU accident and before the accident, there was little expectation of the possibility that an MU accident will occur. In addition to the lack of experience of MU risk assessment, since an MU nuclear power plant site is usually very complex to analyze as a whole, it was considered that a systematic method such as probabilistic safety assessment (PSA) is difficult to apply to MU risk assessment. This paper proposes a new MU risk assessment methodology by using the conventional PSA methodology which is widely used in nuclear power plant risk assessment. The logical failure structure of a site with multiple units is suggested from the definition of site risk, and a decomposition method is applied to identify specific MU failure scenarios.

A Study of Assessment Method for Site Feasibility of Municipal Solid Waste Incineration (생활폐기물소각장의 입지타당성 평가기법)

  • Lee, Mu-Choon
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.2
    • /
    • pp.123-135
    • /
    • 1997
  • The solid waste incineration facilities which cause environmental pollution. And those are some kind of loathing facilities for residents who do not want it. This problem could be solved by location feasibility study. The purpose of location feasibility study was to determine one site out of three candidate sites. This study which was done by the law, environmental and economic factor was considered for optimum site selection. Comparative evaluation among the candidate sites was done by ordinal scale and thus the optimum site was selected.

  • PDF

Assessment of Landfill Hazard Using the Value-Structured Approach (가치구조화기법에 의한 매립지 유해성 등급화)

  • Hong, Sang-Pyo;Kim, Jung-Wuk
    • Journal of Environmental Impact Assessment
    • /
    • v.6 no.1
    • /
    • pp.93-103
    • /
    • 1997
  • LHR(Landfill Site Hazard Ranking Model) was developed for ranking the relative hazard of landfill sites by using the method of value-structured approach. LHR consists of combining a multiattribute decision-making method with a Qualitative risk assessment approach. A pairwise com parisian method was applied to determine weights of landfill site factors related. To determine the hazard of landfill site, hydrogeological factors, waste characteristics factors and receptors factors were evaluated by LHR. LHR can help decision-makers prioritization of remediation of landfill sites through the relatively convenient and concise evaluation method of landfill site features related. LHR focuses mainly on pathways of groundwater and surfacewater for evaluating landfill hazard to receptors including humans. To validiate the applicability of LHR, Nanjido Landfill site, Metropolitan Landfill site, and Hwasung Landfill site were evaluated.

  • PDF

An Empirical Study on General Deterrence Effects of the On-site Investigation System in the Korean National Health Insurance (건강보험 현지조사제도에서 일반적 억제이론에 대한 경험적 연구)

  • Kang, Hee-Chung;Hong, Jae-Seok;Kim, Se-Ra;Choi, Jee-Sook
    • Health Policy and Management
    • /
    • v.19 no.3
    • /
    • pp.109-124
    • /
    • 2009
  • Background: This study aimed to examine whether cases of punishing false claimants threat general physicians to check their medical cost claims with care to avoid being suspected, and identify empirically general deterrence effects of the on-site investigation system in the Korean National Health Insurance. Methods: 800 clinics were selected among a total of 15,443 clinics that had no experience of on-site investigation until June 2007 using a stratified proportional systematic sampling method. We conducted logistic multiple regression to examine the association between factors related to provider's perception of on-site investigation and high level of perceived deterrence referring to fear of punishment after adjusting provider's service experiences and general characteristics. Results: The probability of high perceived deterrence was higher 1.7 times (CI: 1.13-2.56), 2.73 times (CI: 1.68-4.45) each among clinics exchanging the information once or more per year or once or more for 2-3 months than among clinics no exchanging the information about on-site investigation. Also, the probability of high perceived deterrence was higher 2.27 times (CI: 1.28-4.45) among clinics that knows more than 3 health care institutions having experienced an on-site investigation than among clinics knowing no case. Conclusion: A clinic knowing more punishment cases by onsite investigation and exchanging more frequently information about on-site investigation is likely to present high perceived deterrence. This result will provide important information to enlarge preventive effects of on-site investigation on fraud and abuse claims.

Holistic Approach to Multi-Unit Site Risk Assessment: Status and Issues

  • Kim, Inn Seock;Jang, Misuk;Kim, Seoung Rae
    • Nuclear Engineering and Technology
    • /
    • v.49 no.2
    • /
    • pp.286-294
    • /
    • 2017
  • The events at the Fukushima Daiichi Nuclear Power Station in March 2011 point out, among other matters, that concurrent accidents at multiple units of a site can occur in reality. Although site risk has been deterministically considered to some extent in nuclear power plant siting and design, potential occurrence of multi-unit accident sequences at a site was not investigated in sufficient detail thus far in the nuclear power community. Therefore, there is considerable worldwide interest and research effort directed toward multi-unit site risk assessment, especially in the countries with high-density nuclear-power-plant sites such as Korea. As the technique of probabilistic safety assessment (PSA) has been successfully applied to evaluate the risk associated with operation of nuclear power plants in the past several decades, the PSA having primarily focused on single-unit risks is now being extended to the multi-unit PSA. In this paper we first characterize the site risk with explicit consideration of the risk associated with spent fuel pools as well as the reactor risks. The status of multi-unit risk assessment is discussed next, followed by a description of the emerging issues relevant to the multi-unit risk evaluation from a practical standpoint.

A Study on the Research & Analysis of the Health and Safety Managing's Understanding on the Applied Construction Work Site Risk Assessment - Focus on Site Manager & Manager - (건설업 위험성평가 적용사업장 종사자 안전보건 인식도 조사 연구 -사업장책임자 및 관리감독자를 중심으로-)

  • Choi, Soo-Hwan;Kim, Chi-Kyung
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.4
    • /
    • pp.62-67
    • /
    • 2012
  • Risk Assessment, a basis of health and safety management system, is an calamity prevention activity which regularly measure the level of a risk to passively improve potential hazard. A problem, the assessment not being improved to be applied to the construction work site where requires diversity and complexity, causes the assessment to be inefficient to bring quality results. A study on the investigates and compares the surveyed degree of recognitions of workers who works in companies executing the risk assessment By the investigation and comparison, it is expected to bring the better solution for early and efficient application for those companies which are not taking the risk assessment.

A study on the Research & Analysis of the Health and safety Managing's Understanding on the Applied Construction work site Risk Assessment - Focus on Site manager & manager - (건설업 위험성평가 적용사업장 종사자 안전보건 인식도 조사 연구 -사업장책임자 및 관리감독자를 중심으로-)

  • Choe, Su-Hwan;Bae, Jun-Tae;Lee, Yeon-Su;Kim, Chi-Gyeong
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.1-11
    • /
    • 2012
  • Risk Assessment, a basis of health and safety management system, is an calamity prevention activity which regularly measure the level of a risk to passively improve potential hazard. A problem, the assessment not being improved to be applied to the construction work site where requires diversity and complexity, causes the assessment to be inefficient to bring quality results. A study on the investigates and compares the surveyed degree of recognitions of workers who works in companies executing the risk assessment By the investigation and comparison, it is expected to bring the better solution for early and efficient application for those companies which are not taking the risk assessment.

  • PDF

A STUDY ON DEVELOPMENT OF MONITORING & ASSESSMENT MODULE FOR SITES

  • Park, Se-Moon;Yoon, Bong-Yo;Kim, Dae-Jung;Park, Joo-Wan;Kim, Chang-Lak
    • Nuclear Engineering and Technology
    • /
    • v.38 no.6
    • /
    • pp.575-584
    • /
    • 2006
  • As the development of total management systems for sites along with site environmental information is becoming standard, the system known as the Site Information and Total Environmental database management System (SITES) has been developed over the last two years. The first result was a database management system for storing data obtained from facilities, and a site characterization in addition to an environmental assessment of a site. The SITES database is designed to be effective and practical for use with facility management and safety assessment in relation to Geographic Information Systems. SITES is a total management program, which includes its database, its data analysis system required for site characterization, a safety assessment modeling system and an environment monitoring system. It can contribute to the institutional management of the facility and to its safety reassessment. SITES is composed of two main modules: the SITES Database module (SDM) and the Monitoring & Assessment (M&A) module [1]. The M&A module is subdivided into two sub-modules: the Safety Assessment System (SAS) and the Site Environmental Monitoring System (SEMS). SAS controls the data (input and output) from the SITES DB for the site safety assessment, whereas SEMS controls the data obtained from the records of the measuring sensors and facilities. The on-line site and environmental monitoring data is managed in SEMS. The present paper introduces the procedure and function of the M&A modules.

ASTM 규격을 통한 국내 부지조사 기법 개발

  • 안훈기;권영호;박신영;이영훈;공성호
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2002.04a
    • /
    • pp.291-294
    • /
    • 2002
  • The Environmental Site Assessment System(ESAS) in Korea which became effective as of 2002 is very similar to the ASTM standard practice in United States. Unlike the United States, however, we do not have Phase I ESA, enough environmental professionals with approved training and practical experiences, and detailed guidelines for a governmental action. As a result of comparison the ESAS with the ASTM standard practice, the ASTM standard practice is focused on the Innocent Landowner Defense and has a difference in data search process as well as legal and methodological ways from the ESAS. Therefore, the Transaction Screen Process in ASTM E-1528 standard practice is suggested to reduce the risk potentially produced under on-site assessment and to achieve efficient on-site assessment. In addition, social and executive supports are discussed to more activate on-site assessment. In near future this study is expected to be standardized more in detail with activation of on-site assessment and it is also expected to increase the role and responsibility of environmental professionals considerably.

  • PDF

Wind Analysis and Site Assessment for Test Site of 3MW Wind Power System (3MW 풍력발전시스템 개발품의 육상풍력실증단지 조성 타당성 평가를 위한 풍황 및 지형평가 연구)

  • Woo, Sangwoo;Lee, Ki-Hak;Lee, Sang-Il;Park, Jong-Po
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.11a
    • /
    • pp.35.2-35.2
    • /
    • 2011
  • A wind turbine power performance test is very important to wind turbine manufacturers because a wind farm developer or planner must want to define power performance characteristics and reliability of new wind turbines. Based on the IEC 61400-12-1, A wind turbine test site has to be nicely installed at flat terrain for testing. We are developing the wind power system which is IEC wind class IIa model with rated power of 3MW. KEPCO's Gochang power testing center was considered as candidates to build the test site without site calibration. This paper aims to verify the validity of the test site by using implement site assessment result that was based on IEC 61400-12-1.

  • PDF