• 제목/요약/키워드: single-track railway

검색결과 56건 처리시간 0.034초

추진운전 및 견인운전에 따른 곡선부 궤도부담력 비교 분석 (Analysis on Wheel Load and Lateral Force in Curve Section Between the Boost and Traction Driving Mode)

  • 이승열;김남홍;이석영
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.365-373
    • /
    • 2011
  • In general, when train drives boost and traction mode, force of delivering to the track was difference between boost and traction driving mode. But, in korea, we've never performed that measure the track wheel load and lateral force while boost and traction driving. This study measured wheel load and lateral force using combination of 7200type locomotive and six freight car. And the train used single and automatic brake. The train drives boost and traction mode. In order to the difference radius of curve, we had measured at 3 point in the curve of turnout.

  • PDF

Contact 요소를 이용한 신.구 콘크리트의 비선형 해석 (Nonlinear Analysis with contact element between old and new concrete)

  • 조선규;이종선;정우철;이종신
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 춘계학술대회 논문집
    • /
    • pp.1050-1055
    • /
    • 2007
  • In the case of a rail road bridge extension work, especially single track to double track, the foundation of new substructure which supports the extended part of superstructure could be interfered by the exist foundation of an old bridge. When these two foundations are jointed to prevent such fatal effects of the structure as unequal subsidence of soil foundations, it is important to prove the structural behaviour of the joining surfaces between new foundation and old foundation. 3-Dimensional Finite Element Analysis Method have been studied for the solutions of the structural behaviour of the foundations. In this analysis, 'Contact Element' which allows the sliding of each adjoining member is used for the joint of the boundary surface of the old and new pier foundations. Furthermore, Material Nonlinear Behaviour Analysis also supports the accuracy of the result in this study because the foundations consist of concrete main bodies and reinforced steel bars. These detailed analyses secure the verification of the structural safety of the foundations in the extension work more firmly.

  • PDF

Dynamics of a bridge beam under a stream of moving elements -Part 2 - Numerical simulations

  • Podworna, M.
    • Structural Engineering and Mechanics
    • /
    • 제38권3호
    • /
    • pp.301-314
    • /
    • 2011
  • The paper constitutes the second part of the author's study. The first part (Podworna 2010) formulates four fundamental tasks in dynamics of the bridge-track-train systems. The following cyclic moving loads are considered: a concentrated forces stream (model P), an unsprung masses stream (model M), a single-mass viscoelastic oscillators stream (model $M_o$) and a double-mass viscoelastic oscillators stream (model $MM_o$). Three problems precluding to the numerical simulations have been developed, i.e., prediction of the forced resonances, the parameters of integration of equations of motion, the output results. A computer programme was written in Pascal and numerical research in the scope of the fundamental tasks was worked out. The investigations were focused on adequacy evaluation of the moving load models, P, M, $M_o$, $MM_o$, in predicting dynamic processes in railway bridges.

대용폐색방식 시행방법 개선에 관한 연구 (A Study on the Improvement for the Implement Way of a Substitute Block System)

  • 송낙균;김해곤;김호순;주창훈;김대식
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.1860-1871
    • /
    • 2011
  • Presently, The Regular Block System(Automatic, Interlocking block system) is usually used during the operation of block section. However, In case that the regular block system fails because of the failure of the fixed signals and block equipment or in case of the unexpected emergent situation which should drive on the single-track due to the accidents in the double-track section or the repair work of the one-track, the Substitute Block System to make use of the driving permission license(mapping ticket, mapping paper) is used. In case of the operation of the opposite line and the temporary one-track, the safety gets worse and the SBS may cause the fatal accidents such as a head-on & a rear-end collision. Also, the unmanned railroad stations has recently increased owing to the effective operation of the stations, for it is difficult to execute the SBS in their absence. As a result, the increase of the operation time made the train delayed. Being on the rise of these problems, in this study, we analyzed the problems and difficulties of the SBS on the single line which is lacking stability and safety and on the sections combined between maned and unmaned railroad stations. And we proposed the method to improve the existing drive permission license used for 50 years into the brand-new one with state-of-the art technology and scientific way. In the era of the 21th century, Carrying out the new SBS equipped with stability and safety, we will contribute to the effective operation of trains and the satisfaction of our customers in the future.

  • PDF

A Basic Study on Wheel Flange Climbing using Model Wheelset

  • Nagumo, Yosuke;Tanifuji, Katsuya;Imai, Junichi
    • International Journal of Railway
    • /
    • 제3권2호
    • /
    • pp.60-67
    • /
    • 2010
  • This paper deals with an experimental study on the wheel flange climbing of railway vehicles, which is a major factor leading to derailment. An experiment is carried out on a 1/5-scale model wheelset of a truck used on a standard-gauge track, which is placed on a roller rig. The lateral external force acting on the wheelset is ramped up until derailment occurs under the condition of a fixed attack angle and wheel-load unbalance ratio. Three parameters, the height of wheel lift, the lateral force, and the wheel load acting on the outer rail, are measured until derailment occurs. From these measurements, it is possible to observe the behavior of the wheelset and to elucidate how the attack angle, the wheel-load unbalance ratio and the lateral external force affect flange-climb derailment. Then, a numerical simulation is carried out using an analytical model based on a single wheelset. As a result, the flange-climb behavior observed in the experiment can be explained theoretically on the bases of the analytical results, although further improvement of the model is desired.

  • PDF

단선 AT 급전계통의 전차선-레일 단락 고장전류 분석 (The Analysis of Trolley-Rail Short Circuit Current in a Single Track AT Feeding System)

  • 조규정;류규상;이훈도;허승훈;김철환;권성일;김철환
    • 전기학회논문지
    • /
    • 제64권12호
    • /
    • pp.1659-1665
    • /
    • 2015
  • In general, AT(Auto-transformer) is used to improve voltage sag and inductive interference in power lines and communication lines in AC electrical railway feeding system. Especially, Korean AT feeding system has different composition compared to other countries like Japan or France, so that it has some special characteristics. However, relays imported from other countries have been used in Korea, and settings of these relays should be modified and reflect distinct characteristics of Korean AT feeding system. Therefore, study about fault analysis based on modeled AT feeding system is important. In this paper, we modeled a single track AT feeding system by using PSCAD and analyzed fault current flow in case of trolley-rail short circuit fault. Finally, we presented current magnitude of each branch expressed by boosting current of AT.

철도교량 F.C.M(Free Cantilever Method) 공법 시공사례 연구 (The Application Of F.C.M(Free Cantilever Method) Case Study Of The Railway Bridge)

  • 권순섭;김경연;최동기;정인철;신상철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.562-567
    • /
    • 2005
  • F.C.M applied from Jin Jung Li to Yang Su Li(660m) in Puk Han River Bridge(1,414m) construction part is a construction method on the double-track construction which is the third section part of work, called Chung Ang Railroad Line(Deok-So${\sim}$Won-Ju). This method is the beginning application on Railroad Bridge. After completing upper slab structure, there are several following works such as setting up ballast, sleepers and laying long rails. So it is important to consider the properties of Railroad Bridge while designing the length of bridge and its single span. After the physical process study the shrinkage and creep of concrete, bending up by prestressing in general PSM bridge, relaxation of tendons as time goes by after post-tension, the conclusion of such a study is applied to the Puk-Han River Bridge in this construction field.

  • PDF

무절연구간을 위한 열차위치검지방식 검토 (A review of the train position detection method for neutral section with energized condition)

  • 이태훈;이시빈;홍현표;이희순;박기범
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2010년도 춘계학술대회 논문집
    • /
    • pp.1100-1105
    • /
    • 2010
  • The high speed line and conventional line are a single-phase AC feeding system; and power supplies of different phases meet at SS(SubStation)s or SP(Sectioning Post)s. These sections should be negotiated with the main circuit breaker in the traction vehicle switched off, whereby the length of the neutral zone prevents the pantographs shunting adjacent overhead line section. In order for electric railway vehicles to make power running there, there must be a power supply changeover section (approx. for 1km), where a changeover switch changes a power supply to the other power supply of a train running direction sequentially. For a thorough changeover switching control, the precise train position detection is necessarily required. In this paper, to realize the ground-based train position detection method, configuration scheme of train position detection equipment is suggested by using track circuit and axle counter.

  • PDF

틸팅열차 투입에 따른 추정가능한 편익계상 연구 (A Methodology Study for Estimating the Benefits of Tilting Train Deployment)

  • 이진선;김경태;엄진기
    • 한국철도학회논문집
    • /
    • 제12권5호
    • /
    • pp.700-706
    • /
    • 2009
  • 고속철도 개통 후 고속철도 혜택을 받지 못하는 지역의 형평성을 고려하고, 철도와 타 교통수단간의 경쟁력 증진을 위해 기존 철도의 속도 향상이 필요한 것이 틸팅열차 기술개발의 원동력이 되었다고 볼 수 있다. 틸팅열차는 곡선부를 주행할 때 원심력을 줄이기 위해서 열차를 곡선부 안쪽으로 약간 기울이는 것을 의미하는데, 실제로 틸팅열차는 승객의 승차감을 향상시키면서 결과적으로 속도 향상의 효과를 기대할 수 있다. 이에 틸팅열차를 이용한 기존선의 속도향상에 대한 많은 연구가 추진되어 왔으며, 우리나라와 같이 노선에 곡선부가 많은 경우 곡선통과 속도를 향상시켜 노선의 운행시간을 단축시키고 평균속도를 향상하는데 상당히 효과적일 수 있다. 본 논문의 목적은 이렇게 효과적인 수단으로 인식되는 틸팅열차의 운행에 따른 새로운 편익 및 효과의 정량차 방안을 연구하고자 하는 것이며, 이를 위해서는 기존 틸텅열차 연구시 계량화가 가능했던 편익이외에 추가적인 편익항목의 정량적 정성적 분석과정을 도출하고자 한다.

차량가속도데이터를 이용한 머신러닝 기반의 궤도품질지수(TQI) 예측 (Prediction of Track Quality Index (TQI) Using Vehicle Acceleration Data based on Machine Learning)

  • 최찬용;김현기;김영철;김상수
    • 한국지반신소재학회논문집
    • /
    • 제19권1호
    • /
    • pp.45-53
    • /
    • 2020
  • 철도분야에서도 계측자료를 바탕으로 머신러닝 기법을 이용하여 예측 분석하는 시도가 점차적으로 증가하고 있는 실정이다. 이 논문에서는 열차의 차상가속도 데이터를 기반으로 궤도의 품질을 결정하는 지표 중에 하나인 궤도품질지수를 머신러닝 기법을 활용하여 예측하였다. 머신러닝 기법으로 활용하고 있는 대표적인 3개의 모델로 궤도품질지수를 예측하여 가장 정확도가 높은 모델은 XGBoost으로 데이터셋에서 85% 이상의 예측정확도를 보였다. 또한 윤축과 대차의 z축의 진동가속도가 고저 궤도품질지수의 기여도가 높은 것으로 나타났으며, 이는 기존 연구결과와도 잘 일치하였다. 이러한 결과를 볼 때 단일 알고리즘인 서포터 벡터머신보다는 앙상블 알고리즘을 적용한 랜덤포레스트와 XGBoost이 정확도가 높은 것으로 판단된다. 따라서 머신러닝 기법에서 적용모델에 따라 정확도가 달라질 수 있기 때문에 차량진동가속도를 이용한 궤도품질지수를 예측하기 위해서는 앙상블 알고리즘을 가지는 모델을 적용하는 것이 적절할 것으로 판단된다.