• Title/Summary/Keyword: short-term cost

Search Result 284, Processing Time 0.057 seconds

Purposes, Results, and Types of Software Post Life Cycle Changes

  • Koh, Seokha;Han, Man Pil
    • Journal of Information Technology Applications and Management
    • /
    • v.22 no.3
    • /
    • pp.143-167
    • /
    • 2015
  • This paper addresses the issue how the total life cycle cost may be minimized and how the cost should be allocated to the acquirer and developer. This paper differentiates post life cycle change (PLCC) endeavors from PLCC activities, rigorously classifies PLCC endeavors according to the result of PLCC endeavors, and rigorously defines the life cycle cost of a software product. This paper reviews classical definitions of software 'maintenance' types and proposes a new typology of PLCC activities too. The proposed classification schemes are exhaustive and mutually exclusive, and provide a new paradigm to review existing literatures regarding software cost estimation, software 'maintenance,' software evolution, and software architecture from a new perspective. This paper argues that the long-term interest of the acquirer is not protected properly because warranty period is typically too short and because the main concern of warranty service is given to removing the defects detected easily. Based on the observation that defects are caused solely by errors the developer has committed for software while defects are often induced by using for hardware (so, this paper cautiously proposes not to use the term 'maintenance' at all for software), this paper argues that the cost to remove defects should not be borne by the acquirer for software.

A Study on Contant Power Control for Virtual Implementation of Solar Cell (태양전지의 가상구현을 위한 정전력제어에 관한 연구)

  • 이정민
    • Proceedings of the KIPE Conference
    • /
    • 2000.07a
    • /
    • pp.10-13
    • /
    • 2000
  • This paper proposes the virtual implementation of solar cell(VISC) for photovoltaic system. It is required to make operation condition of solar cell arrays where is the limit of time and space, The main advantage of the simulator is its ability to simulate different types and sizes of arrays considering V-I characteristics of data sheet. The VISC with buch-boost converter can be used to study the short-term and long-term performances of PV cells. The simulator is a far more cost effective and reliable replacement for field and filight testing.

  • PDF

Application of cost-sensitive LSTM in water level prediction for nuclear reactor pressurizer

  • Zhang, Jin;Wang, Xiaolong;Zhao, Cheng;Bai, Wei;Shen, Jun;Li, Yang;Pan, Zhisong;Duan, Yexin
    • Nuclear Engineering and Technology
    • /
    • v.52 no.7
    • /
    • pp.1429-1435
    • /
    • 2020
  • Applying an accurate parametric prediction model to identify abnormal or false pressurizer water levels (PWLs) is critical to the safe operation of marine pressurized water reactors (PWRs). Recently, deep-learning-based models have proved to be a powerful feature extractor to perform high-accuracy prediction. However, the effectiveness of models still suffers from two issues in PWL prediction: the correlations shifting over time between PWL and other feature parameters, and the example imbalance between fluctuation examples (minority) and stable examples (majority). To address these problems, we propose a cost-sensitive mechanism to facilitate the model to learn the feature representation of later examples and fluctuation examples. By weighting the standard mean square error loss with a cost-sensitive factor, we develop a Cost-Sensitive Long Short-Term Memory (CSLSTM) model to predict the PWL of PWRs. The overall performance of the CSLSTM is assessed by a variety of evaluation metrics with the experimental data collected from a marine PWR simulator. The comparisons with the Long Short-Term Memory (LSTM) model and the Support Vector Regression (SVR) model demonstrate the effectiveness of the CSLSTM.

THREE-STAGED RISK EVALUATION MODEL FOR BIDDING ON INTERNATIONAL CONSTRUCTION PROJECTS

  • Wooyong Jung;Seung Heon Han
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.534-541
    • /
    • 2011
  • Risk evaluation approaches for bidding on international construction projects are typically partitioned into three stages: country selection, project classification, and bid-cost evaluation. However, previous studies are frequently under attack in that they have several crucial limitations: 1) a dearth of studies about country selection risk tailored for the overseas construction market at a corporate level; 2) no consideration of uncertainties for input variable per se; 3) less probabilistic approaches in estimating a range of cost variance; and 4) less inclusion of covariance impacts. This study thus suggests a three-staged risk evaluation model to resolve these inherent problems. In the first stage, a country portfolio model that maximizes the expected construction market growth rate and profit rate while decreasing market uncertainty is formulated using multi-objective genetic analysis. Following this, probabilistic approaches for screening bad projects are suggested through applying various data mining methods such as discriminant logistic regression, neural network, C5.0, and support vector machine. For the last stage, the cost overrun prediction model is simulated for determining a reasonable bid cost, while considering non-parametric distribution, effects of systematic risks, and the firm's specific capability accrued in a given country. Through the three consecutive models, this study verifies that international construction risk can be allocated, reduced, and projected to some degree, thereby contributing to sustaining stable profits and revenues in both the short-term and the long-term perspective.

  • PDF

Characteristic Analysis of Utilization of Security Deposit for Repairing Defects Using Statistical Analysis (통계분석을 이용한 공동주택 하자보수보증금 특성 분석)

  • Seo, Deok-Seok;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.2
    • /
    • pp.209-215
    • /
    • 2015
  • This study was conducted to analyze the actual utilization rate of the deposit for defect repair of apartment complexes and its influential factors. We analyzed the data on enforced defect deposit cases by using one-sample t-test, Pearson's correlation analysis, and simple linear regression analysis. The difference between the deposit amount specified and the enforcement amount actually disbursed was found to about 0.51%. The change rates for short-term costs amounted approximately to $839KRW/m^2$ and 130,000 KRW/household per year, and those for long-term costs were $647KRW/m^2$ and 123,207 KRW/household per year. The results warrant the need for further research on establishing a deposit amount based on actual statistical data.

Short-Term Generation Scheduling Considering Transmission Line Capacity Limits (선로용량한계를 고려한 단기 발전계획)

  • 김준현;송현선;유인근
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.35 no.12
    • /
    • pp.594-602
    • /
    • 1986
  • This paper proposes an effective algorithm for short-term generation scheduling for the purpose of economic and secure operation of thermal power systems. Especially, in the procedure of solution by Dynamic Programming, Linear Programming is introduced to promote the possibility of optimal solution and the security of power systems, and evaluation of security function is improved by the application of seven step approximation of normal distribution. Several necessary considerations, that is, time dependent start-up and constant down cost of generating units, demand and spinning reserve constraints, minimum up and sown time constraints, the number of possible start-up of a generating unit in a d and the number of generating units which can be started up at the same time at the same bus, are also incoporated to elevate the usability and flexibility of the algorithm. Finally, the effectiveness of the proposed algorithm has been demonstrated by applying to the 6-gen. 21-bus model power system.

  • PDF

A Study on the Short-term Load Forecasting using Support Vector Machine (지원벡터머신을 이용한 단기전력 수요예측에 관한 연구)

  • Jo, Nam-Hoon;Song, Kyung-Bin;Roh, Young-Su;Kang, Dae-Seung
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.7
    • /
    • pp.306-312
    • /
    • 2006
  • Support Vector Machine(SVM), of which the foundations have been developed by Vapnik (1995), is gaining popularity thanks to many attractive features and promising empirical performance. In this paper, we propose a new short-term load forecasting technique based on SVM. We discuss the input vector selection of SVM for load forecasting and analyze the prediction performance for various SVM parameters such as kernel function, cost coefficient C, and $\varepsilon$ (the width of 8 $\varepsilon-tube$). The computer simulation shows that the prediction performance of the proposed method is superior to that of the conventional neural networks.

Building Process of Domestic Residential Container Architecture and Suggestions for Vitalization (국내 거주용 컨테이너 건축물의 구축현황과 활성화 방안)

  • Gil, Bit-Na;Kim, Mi-Kyung
    • Korean Institute of Interior Design Journal
    • /
    • v.25 no.6
    • /
    • pp.79-88
    • /
    • 2016
  • The purpose of this study was to suggest ways to vitalize residential container architecture by identifying the building process of domestic residential container architecture and analyzing various problems appeared in the process and status of construction related to planning, design, and construction. Conclusion and suggestions of this study are as follows.; firstly, according to the current situation of domestic residential container architecture, the usage was planned mainly for accommodation. Secondly, For planning background of planning preparation stage, economic benefit for long-term residence individuality and diversity for long short term complex residence were the primary planning backgrounds. Thirdly, for floor planning of planning design stage, space planning for various purposes is necessary as creating inter-space, wide LDK space, and loft by using narrow and long container for the long-term residence. Lastly, For construction stage, ways to reduce personnel expenses are being required by reducing the term of works and simplifying the processing stage by running factory production and field construction in parallel. If reduction method of construction cost through energy saving and mass production system is considered in the future, it would be possible to expand the development to dormitory and community housing for university students who are pressured by housing cost.

Can Properly Raised Debts Help Increase the Profits of Industrial Enterprises?

  • Zhang, Cheng;Song, Li-Yuan
    • Journal of Information Processing Systems
    • /
    • v.15 no.4
    • /
    • pp.920-930
    • /
    • 2019
  • To figure out the impact of debt financing on the profits of industrial enterprises, it starts with calculating the first differences against the logarithms of the cost profit ratios and the debt asset ratios of Chinese industrial enterprises during 179 months from 2002 to 2016; next, it runs the cointegration test and afterwards the regression test to analyze the obtained first differences, and still next uses the Simulink software to get the regularity of those changes. It finds out that there is not only a long-term stable relationship between the enterprises' profits and debts, but also a steady time series trend within a short term. The profit rate positively correlates to the debt asset ratio, and profit for the current term positively correlates to the profit for the previous term. It indicates that properly raised debts can help increase the profit rate of the industrial enterprises, and a higher previous profit level can help improve the current profit level.

A Study on the Radioactive Products of Components in Proton Accelerator on Short Term Usage Using Computed Simulation (몬테칼로 시뮬레이션을 활용한 양성자가속기 단기사용 시 구성품의 방사화 평가)

  • Bae, Sang-Il;Kim, Jung-Hoon
    • Journal of radiological science and technology
    • /
    • v.43 no.5
    • /
    • pp.389-395
    • /
    • 2020
  • The evaluation of radioactivated components of heavy-ion accelerator facilities affects the safety of radiation management and the exposure dose for workers. and this is an important issue when predicting the disposal cost of waste during maintenance and dismantling of accelerator facilities. In this study, the FLUKA code was used to simulate the proton treatment device nozzle and classify the radio-nuclides and total radioactivity generated by each component over a short period of time. The source term was evaluated using NIST reference beam data, and the neutron flux generated for each component was calculated using the evaluated beam data. Radioactive isotopes caused by generated neutrons were compared and evaluated using nuclide information from the International Radiation Protection Association and the Korea Radioisotope association. Most of the nuclides produced form of beta rays and electron capture, and short-lived nuclides dominated. However, In the case of 54Mn, which is a radioactive product of iron, the effect of gamma rays should be considered. In the case of tritium generated from a material with a low atomic number, it is considered that handling care should be taken due to its long half-life.