• Title/Summary/Keyword: shield TBM

Search Result 192, Processing Time 0.021 seconds

Case of assembly process review and improvement for mega-diameter slurry shield TBM through the launching area (발진부지를 이용한 초대구경 이수식 쉴드TBM 조립공정 검토 및 개선 사례)

  • Park, Jinsoo;Jun, Samsu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.637-658
    • /
    • 2022
  • TBM tunnel is simple with the iterative process of excavating the ground, building a segment ring-build, and backfilling. Drill & Blast, a conventional tunnel construction method, is more complicated than the TBM tunnel and has some restrictions because it repeats the inspection, drilling, charging, blasting, ventilation, muck treatment, and installation of support materials. However, the preparation work for excavation requires time and cost based on a very detailed plan compared to Drill & Blasting, which reinforces the ground and forms a tunnel after the formation of tunnel portal. This is because the TBM equipment for excavating the target ground determines the success or failure of the construction. If the TBM, an expensive order-made equipment, is incorrectly configured at the assembly stage, it becomes difficult to excavate from the initial stage as well as the main excavation stage. When the assembled shield TBM equipment is dismantled again, and a situation of re-assembly occurs, it is difficult throughout the construction period due to economic loss as well as time. Therefore, in this study, the layout and plan of the site and the assembly process for each major part of the TBM equipment were reviewed for the assembly of slurry shield TBM to construct the largest diameter road tunnel in domestic passing through the Han River and minimized interference with other processes and the efficiency of cutter head assembly and transport were analyzed and improved to suit the site conditions.

Critical face pressure and backfill pressure in shield TBM tunneling on soft ground

  • Kim, Kiseok;Oh, Juyoung;Lee, Hyobum;Kim, Dongku;Choi, Hangseok
    • Geomechanics and Engineering
    • /
    • v.15 no.3
    • /
    • pp.823-831
    • /
    • 2018
  • The most important issue during shield TBM tunneling in soft ground formations is to appropriately control ground surface settlement. Among various operational conditions in shield TBM tunneling, the face pressure and backfill pressure should be the most important and immediate measure to restrain surface settlement during excavation. In this paper, a 3-D hydro-mechanical coupled FE model is developed to numerically simulate the entire process of shield TBM tunneling, which is verified by comparing with real field measurements of ground surface settlement. The effect of permeability and stiffness of ground formations on tunneling-induced surface settlement was discussed in the parametric study. An increase in the face pressure and backfill pressure does not always lead to a decrease in surface settlement, but there are the critical face pressure and backfill pressure. In addition, considering the relatively low permeability of ground formations, the surface settlement consists of two parts, i.e., immediate settlement and consolidation settlement, which shows a distinct settlement behavior to each other.

A Case Study on Penetrating Hard Rock with Alternative Methods of Shield TBM for Weathered Layer in Subway Construction (지하철공사에서 풍화대용 쉴드 TBM의 경암 구간 굴진 시 대체공법에 대한 사례연구)

  • Park, Hyung-Keun;Ko, Won Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.6D
    • /
    • pp.623-629
    • /
    • 2010
  • Recently, the Shield TBM (Tunnel Boring Machine) construction method is used gradually to increase at the Tunnel Constructin site. However the design and application of the Shield TBM were carried out without sufficient investigation of the ground conditions in the construction site. Due to insufficient understanding to the corresponding equipment is frequently occurring unexpected construction cost and extension of a construction period. The most suitable alternative construction method was determined by analyzing tunneling rate, duration, construction cost of shield machine and tunneling data of alternative method. The result of the case study is suggested as follows. First, the accurate soil exploration on the construction site should be preceded to prevent from tunneling stoppage and schedule delay. Second, the most suitable selection of the shield machine to the ground conditions of the construction site should be executed based on the investigation. Third, the best alternative method for boring of hard rock section is 'hard rock blasting after open cut and cover method'.

Infiltration behaviour of the slurry into tunnel face during slurry shield tunnelling in sandy soil (사질성 지반에서 이수식 쉴드 TBM 적용시 굴진면으로의 이수 침투특성에 대한 해석적 고찰)

  • Roh, Byoung-Kuk;Koh, Sung-Yil;Choo, Seok-Yeon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.3
    • /
    • pp.261-275
    • /
    • 2012
  • This paper presents numerical analysis of the mud cake infiltration behaviour which is influenced tunnel face stability during excavation by slurry shield TBM. This analysis method can make useful data to select proper shield TBM type and to set up the construction plan. But effective analysis did not proposed until now. In this paper, we carried out numerical analysis using by $PFC^{2D}$ fluid coupling simulation which is suitable for sandy soil modelling. As a analysis result, we checked that the slurry infiltration behaviour varied with soil permeability and slurry characteristic(specific weight, viscosity etc). This analysis method is helpful safety excavation through anticipating the proper slurry viscosity at the design stage and verifying the slurry quality at initial excavation stage.

A study on numerical modeling method considering gap parameter and backfill grouting of the shield TBM tunnel (쉴드 TBM 터널의 gap parameter와 뒤채움재를 고려한 수치모델링 방법에 대한 연구)

  • You, Kwang-Ho;Kim, Young-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.5
    • /
    • pp.799-812
    • /
    • 2017
  • Backfill grouting and realistic convergence distribution were not properly considered in previous studies on 2D numerical analysis of a shield TBM tunnel. In this study, a modeling method was suggested to cope with this problem by considering a realistic convergence distribution and proper properties of backfill grouting. To this end, the influence of gap parameter and depth of rock cover on volume loss and composed of ground volume loss around tunnel excavation and surface volume loss were analyzed with a single layer of weathered soil. As a result, most of surface settlements were occurred immediately after excavation. Additional, as depth of rock cover and gap parameter increased, the influence range of surface settlement curves obtained from 2D numerical analyses became broader than a suggested theoretical equation. Therefore, it is inferred that gap parameter should be applied based on load distribution ratio and the property of backfill grouting properly considered for the estimation of the precise behavior of a shield TBM tunnel in 2D numerical analysis.

Predicting ground condition ahead of tunnel face utilizing electrical resistivity applicable to shield TBM (Shield TBM에 적용 가능한 전기비저항 기반 터널 굴착면 전방 예측기술)

  • Park, Jin-Ho;Lee, Kang-Hyun;Shin, Young-Jin;Kim, Jae-Young;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.6
    • /
    • pp.599-614
    • /
    • 2014
  • When tunnelling with TBM (Tunnel Boring Machine), accessibility to tunnel face is very limited because tunnel face is mostly occupied by a bunch of machines. Existing techniques that can predict ground condition ahead of TBM tunnel are extremely limited. In this study, the TBM Resistivity Prediction (TRP) system has been developed for predicting anomalous zone ahead of tunnel face utilizing electrical resistivity. The applicability and prediction accuracy of the developed system has been verified by performing field tests at subway tunnel construction site in which an EPB (Earth Pressure Balanced) shield TBM was used for tunnelling work. The TRP system is able to predicts the location, thickness and electrical properties of anomalous zone by performing inverse analysis using measured resistivity of the ground. To make field tests possible, an apparatus was devised to attach electrode to tunnel face through the chamber. The electrode can be advanced from the chamber to the tunnel face to fully touch the ground in front of the tunnel face. In the 1st field test, none of the anomalous zone was predicted, because the rock around the tunnel face has the same resistivity and permittivity with the rock ahead of tunnel face. In the 2nd field test, 5 m thick anomalous zone was predicted with lower permittivity than that of the rock around the tunnel face. The test results match well with the ground condition predicted, respectively, from geophysical exploration, or directly obtained either from drilling boreholes or from daily observed muck condition.

Prediction of Uniaxial Compressive Strength of Rock using Shield TBM Machine Data and Machine Learning Technique (쉴드 TBM 기계 데이터 및 머신러닝 기법을 이용한 암석의 일축압축강도 예측)

  • Kim, Tae-Hwan;Ko, Tae Young;Park, Yang Soo;Kim, Taek Kon;Lee, Dae Hyuk
    • Tunnel and Underground Space
    • /
    • v.30 no.3
    • /
    • pp.214-225
    • /
    • 2020
  • Uniaxial compressive strength (UCS) of rock is one of the important factors to determine the advance speed during shield TBM tunnel excavation. UCS can be obtained through the Geotechnical Data Report (GDR), and it is difficult to measure UCS for all tunneling alignment. Therefore, the purpose of this study is to predict UCS by utilizing TBM machine driving data and machine learning technique. Several machine learning techniques were compared to predict UCS, and it was confirmed the stacking model has the most successful prediction performance. TBM machine data and UCS used in the analysis were obtained from the excavation of rock strata with slurry shield TBMs. The data were divided into 8:2 for training and test and pre-processed including feature selection, scaling, and outlier removal. After completing the hyper-parameter tuning, the stacking model was evaluated with the root-mean-square error (RMSE) and the determination coefficient (R2), and it was found to be 5.556 and 0.943, respectively. Based on the results, the sacking models are considered useful in predicting rock strength with TBM excavation data.

Disc Cutter Consumptions Prediction on Applying Shield TBM at the Han Riverbed Tunnel (한강하저터널의 쉴드TBM 적용시 디스크 커터 소모량 예측과 소모량)

  • Choi, Jung-Myung;Jung, Hyuk-Sang;Chun, Byung-Sik;Lee, Yong-Joo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.562-570
    • /
    • 2010
  • This study was conducted to estimate the number of disc cutter consumption and to predict amount of disc cutters when a shield TBM(Tunnel Boring Machine) of the Han Riverbed Tunnel was applied. In fact, it is almost impossible to change the machine after starting the excavation using the shield TBM method. Therefore, it is important to design an appropriate equipment in the shield method - an efficiency choice of the operation equipment plays a key role in the shield tunnel processing. For the above reason, the disc cutter consumption prediction is quite important so that the detailed analysis is required. A number of disc cutter consumption was predicted by the three methods, viz. KOMATSU, MITSUBISHI and NTNU. In addition, the predicted results were compared with field data. The prediction of disc cutter consumption showed that 237 for KOMATSU, 501 for MITSUBISHI, and 634 for NTNU, respectively. However, a total number of 1,263 disc cutter consumption were investigated during the tunnel construction. It was found that there was a huge difference between the predicted and real values of the disc cutter consumption. The more detailed investigation showed that the disc cutter was worn out bluntly in the northbound tunnel, meanwhile it was worn out sharply in the southbound tunnel. In particular, the disc cutter consumption in the southbound tunnel was increased rapidly because of rear abrasion for remaining mucks in the chamber.

  • PDF

A Case Study on Turkey Eurasia Tunnel Project (터키 유라시아 터널 프로젝트에 대한 사례연구)

  • Kim, Do-Hyung;Bang, Gyu-Min;Jun, Gy-Chan;Kim, Dong-Hyun;Kim, Taek-Kon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.58-69
    • /
    • 2010
  • Turkey Eurasia Tunnel Project is large scale road construction project of which the total length is 14.6km. The subsea shield TBM tunnel will be constructed under Bosphorus strait and the project site is in poor condition as composite ground, high water pressure and earthquake. The design procedure of subsea tunnel was introduced with tender design materials. That procedure contains tunnel type, TBM type and the principal design items considering geological condition such as high water pressure, composite ground and seismic area. This paper states the progress for geotechnical investigation, seismic analysis and TBM tunnel design. Analysis for geotechnical investigation is in progress, aseismatic design is going on stability study for liquefaction and structure. In addition, the performance of shield TBM to be considered such as advance rate and improvement of TBM was reviewed. The plan of fire safety was also reviewed with respect to fire protection.

  • PDF

Risk management applicable to shield TBM tunnel: I. Risk factor analysis (쉴드 TBM 터널에 적용 가능한 리스크 관리: I. 리스크 요인 분석)

  • Hyun, Ki-Chang;Min, Sang-Yoon;Moon, Joon-Bai;Jeong, Gyeong-Hwan;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.6
    • /
    • pp.667-681
    • /
    • 2012
  • In general, risk management consists of a series of processes or steps including risk identification, risk analysis, risk evaluation, risk mitigation measures, and risk re-evaluation. In this paper, potential risk factors that occur in shield TBM tunnels were investigated based on many previous case studies and questionaries to tunnel experts. The risk factors were classified as geological, design or construction management features. Fault Tree was set up by dividing all feasible risks into four groups that associated with: cutter; machine confinement; mucking (driving) and segments. From the Fault Tree Analysis (FTA), 12 risk items were identified and the probability of failure of each chosen risk item was obtained.