• Title/Summary/Keyword: sewer systems

Search Result 110, Processing Time 0.018 seconds

Appropriate Sewerage Systems for Korea (우리나라 적합 하수도시설 및 관리방안)

  • 이상은
    • Journal of environmental and Sanitary engineering
    • /
    • v.7 no.2
    • /
    • pp.37-52
    • /
    • 1992
  • Since the first sewage treatment plant was constructed in 1976, the sewerage systems of Korea have been rapidly expanded. As of the end of 1991, 22 sewage treatment plants with total capacity of 5.4 million tons/day are in operation which is equivalent of 3395 total daily sewage generation. Total extension of sewer 39.534 km in 1990 which is 55% of the target extension for the year 2001. However, the most sewage treatment plants employ activated sludge process which may not be suitable for medium and/or small scale plants. The poor existing sewer systems do not effectively collect and transport sewage to adversely affect the function of sewage treatment plant. To select the appropriate treatment system, the cities are classified into 3 categories such as large and medium size inland cities, small size cities and coastal cities. Considering the criteria suggested during this study, appropriate treatment processes were selected for each category. Conventional activated sludge process and step aeration process were found to be the most appropriate for big inland cities while biological nutrient removal processes should be considered for the cities discharge the effluent to lakes or reservoirs. RBC or Oxidation Ditch process might be appropriate for the medium size cities while several processes which do not require skilled operation and maintenance were suggested for the small cities. Ocean discharge after primary treatment can be considered for some east coast cities, Appropriate methodology to rehabilitate the existing sewers and strategy to convert combined sewer system to separate sewer system were proposed. This paper also include the appropriate management system for industrial wastewater, sludge and nightsoil.

  • PDF

A Study on Development of Level of Service (LoS) in Asset Management for Separated Sewer Pipe by Function Analysis Systems Technique (기능계통도를 활용한 분류식 하수관거의 자산관리 서비스수준의 성능측정방법 개선에 대한 연구)

  • Ha, Seung Ho;Kim, Seok;Cho, Namho;Kim, Kyong Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.2D
    • /
    • pp.147-157
    • /
    • 2012
  • Recent studies on development of level of service (LoS) for separated sewer pipe have simply shown high-level of LoS from the perspective of users and financial/social/economical factors, which results in poor connectivity to real maintenance work. The objective of this study is to develope the evaluation indicators of level of service in the manner of function by analyzing the separated sewer pipes with FAST, function analysis systems technique, used in value engineering. The evaluation indicators suggested in this study include all the functions of separated sewer pipes and show an advantage of focused function maintenance. Moreover, developed indicators help to manage archival history and to perform asset management effectively.

Development of Optimal Urban Runoff System : I. Study of Inflow/Infiltration Estimation Considering AHP in Urban Runoff System (최적 도시유출시스템의 개발 : I. 도시유출시스템에서의 AHP를 고려한 불명수량 산정에 대한 연구)

  • Lee, Jung-Ho;Kim, Joong-Hoon;Kim, Hung-Soo;Kim, Eung-Seok;Jo, Deok-Jun
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.3
    • /
    • pp.195-206
    • /
    • 2004
  • One of the main factors which reduces the efficiency of a sewage treatment plant is the Inflow/Infiltration(Ⅰ/Ⅰ) in the sewer First we must calculate the quantity of Ⅰ/Ⅰ via the investigation of each sewer to establish the reduction plan of Ⅰ/Ⅰ. However, in Korea, we apply the results of a surveyed sample to the entire study area to establish the reduction plan of Ⅰ/Ⅰ. This methodology just considers the total Ⅰ/Ⅰ for the entire study area but it does not consider the quantity of Ⅰ/Ⅰ for the individual sewer systems. Therefore, we may need the model to consider the Ⅰ/Ⅰ in the individual sewer systems and we develop the model to calculate the Ⅰ/Ⅰ that happen in urban sewer systems. We estimate the Ⅰ/Ⅰ of individual systems by the developed model and the estimated Ⅰ/Ⅰ are utilized as the basic data for the establishment of Ⅰ/Ⅰ reduction plan. The observed Ⅰ/Ⅰ for the entire study area is distributed into the individual sewer systems according to their defect states. Here, the weights of defect elements are calculated using AHP(Analytic Hierarchy Process) and we perform the uncertainty analysis for considering the errors using MCS(Monte Carlo Simulation).

Suggestion of the Domestic CCTV Inspection Sewer Pipe Defect Codeby Sewer Defect Frequency Analysis (국내 하수관로 결함빈도 분석을 통한 CCTV 조사 결함항목 코드 제안)

  • Son, Jooyoung;Lee, Jaehyun;Kim, Jungryul;Oh, Jeill;Yoon, Sungsoo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.30 no.6
    • /
    • pp.623-634
    • /
    • 2016
  • Sewer condition assessment involves the determination of defective points and status of aged sewers by a CCTV inspection according to the standard manual. Therefore, it is important to establish a reliable and effective standard manual for identifying the sewer defect. In this study, analytic reviews of the CCTV inspection manuals of the UK, New Zealand, Canada and South Korea were performed in order to compare the defect codes and the protocols of condition assessment. Through this, we also established the standardized method for defect code and revised the calculation method of assigning the condition grade. Analyses of the types and frequencies of sewer defects that obtained by CCTV inspection of 7000 case results, showed that the joint defect and lateral defect were the most frequent defects that occurred in Korea. Some defect codes are found to be modified because those did not occur at all. This study includes a proposed new sewer defect codes based on sewer characteristics.

Odor Emission from Sediments in Sewer Systems and Odor Removal using an Electrolytic Oxidation Process (하수관거에 퇴적된 유기물에 의한 악취 발생과 산화전리시스템을 이용한 악취 저감)

  • Ahn, Hae-Young;Shin, Seung-Kyu;Song, Ji-Hyeon
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.27 no.6
    • /
    • pp.703-710
    • /
    • 2011
  • Odor emission from domestic sewer systems has become a serious environmental problem. An investigation on a sewer manhole revealed that anaerobic decay of sediment organic matters (SOMs) and related declines of oxidation reduction potential (ORP) in the sediment layer were the main reason of the production of volatile sulfur compounds. In addition, as the anaerobic decaying period continued, the odor intensity rapidly increased with increasing concentrations of $H_2S$ and dimethyl sulfide. As a feasible method to control SOMs and to minimize odor emission potentials, an electrolytic oxidation process has been employed to the sediment sludge phase. In this study, voltages applied to the electrolytic oxidation process were varied as a main system parameter, and its effects on odor removal efficiencies and reaction characteristics were investigated. At the applied voltages greater than 20 V, the system efficiently oxidized the organic matter, and the ORP in the sludge phase increased rapidly. As a consequence, the removal efficiency of hydrogen sulfide was found to be >99% within 60 minutes of the electrolytic oxidation. Overall, the electrolytic oxidation process can be an alternative to control odor emission from sewer systems, and a threshold input energy needs to be determined to achieve effective operation of the process.

Analysis of Infiltration/Inflow at Dry and Rainfall Periods in Separated Sewer System of Nakdong River Basin (건기와 우기시 낙동강 유역 분류식 하수관거의 유입수/침입수의 분석)

  • Gu, Joung-Eun;Lee, Hong-Shin;Son, Gun-Tae;Lee, Sung-Eok;Lee, Seung-Hwan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.1
    • /
    • pp.75-84
    • /
    • 2011
  • This study was conducted to provide a basic information for the establishment of operation and treatment processes in sewer system of Nakdong river basin to minimize the overall pollutants loading to water body. Sewage flowrates were regularly measured and monitored at various sampling points of newly-built separated sewer system located in G City GA sites. To assess the inflow sewage flowrate, various calculating methods such as water-use evaluation, average-minimum daily flow quality evaluation, minimum daily flow evaluation, night water-use evaluation were used. Average I/Is were calculated except water-use evaluation. Average I/Is were found to be 6.5 $m^{3}/d$, 3.5 $m^{3}/d$, 7.7 $m^{3}/d$ at GA-1, GA-2, GA-3 points respectively. I/I ratios of three areas were found to be 4.8 %, 2.0 % and 2.7 % respectively and were obviously lower than those of the other separated sewer systems as shown in the previous studies.

Development and Effects Analysis of The Decentralized Rainwater Management System by Field Application

  • Han, Young Hae;Lee, Tae Goo
    • KIEAE Journal
    • /
    • v.14 no.3
    • /
    • pp.15-21
    • /
    • 2014
  • In this study, we developed a modular rainwater infiltration system that can be applied for general purposes in urban areas to prepare for localized heavy rain caused by climatic change. This study also analyzed the system's effects on reducing runoff. An analysis of the system's effects on reducing runoff based on rainfall data and monitoring data obtained between September 2012 and December 2013 after the system was installed showed that approximately 20~22% of the runoff overflowed from the infiltration facility. Also, an analysis of the runoff that occurred during the monsoon season showed that 25% of the runoff overflowed through the storm sewer system of the urban area. These results show that the rainwater overflows after infiltrating the detention facility installed in the area during high-intensity rainfall of 100mm or higher or when precipitation is 100mm for 3~4 days without the prior rainfall. According to precipitation forecasts, torrential rainfall is becoming increasingly prevalent in Korea which is increasing the risk of floods. Therefore, the standards for storm sewer systems should be raised when planning and redeveloping urban areas, and not only should centralized facilities including sewer systems and rainwater pump facilities be increased, but a comprehensive plan should also be established for the water cycle of urban areas. This study indicates that decentralized rainwater management can be effective in an urban area and also indicates that the extended application of rainwater infiltration systems can offer eco-friendly urban development.

Development of Estimation Equations for Solid Deposition in Sewer Systems (관거 내 고형물 퇴적량 산정식 개발)

  • Lee, Jae-Soo
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.5
    • /
    • pp.409-418
    • /
    • 2007
  • Combined sewer solid deposition during dry weather periods and their resuspension during wet weather periods has long been recognized as a major contributor to the first-flush phenomenon. Also, these deposition of sewer solids results in a loss of flow capacity that may restrict flow and cause a local flooding at urban area. In order to solve these problems, measurement of solid deposition for a given sewer system for extended period is needed but this task is very difficult and extremely expensive. This paper presents the development and applicability of estimation equations for solid deposition in sewer systems based on the solid deposition estimated using MOUSE model. As results, the comparison between estimated and measured solid deposition is difficult due to the absent of measured data, but the estimated values using developed equations show applicability compared with the results of MOUSE model and the estimation equations developed by the EPA.

Development of Estimation Equations for Solid Deposition in Sewer Systems due to Rainfall (강우로 인한 관거 내 고형물 퇴적량 산정식 개발)

  • Lee, Jae-Soo;Lee, Se-Won
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.9
    • /
    • pp.885-894
    • /
    • 2008
  • The deposition of solids in combined sewer systems results in a loss of flow capacity that may restrict flow and cause a local flooding and enhanced solids deposition. In order to solve these problems and proper pipe management, estimations of solid loads on land surface in a drainage basin and solid deposition in sewer system due to rainfall are needed but these tasks are very difficult and very expensive. In this study, procedures for estimating solid loads on surface in a drainage basin were applied and analyzed in Gunja drainage basin in Korea. Also, this paper presents the development and application of estimation equation for solid deposition in sewer system due to rainfall based on the solid deposition estimated using MOUSE model. As results, the comparison between estimated and measured solid deposition is difficult due to the absent of measured data, but the estimated values using developed equations show applicability compared with the results of MOUSE model and the application of the other basin. The developed estimation equations can be used usefully for the management of combined sewer system.

Assessment of Design Method about Sanitary Sewer Network according to RDII and Established Scenario (RDII발생 및 기존 시나리오에 따른 오수간선 네트워크 설계방법 검토)

  • Kim, Jungryul;Oh, Jeill
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.4
    • /
    • pp.367-374
    • /
    • 2016
  • In this study, the RDII impact on sewer designing in the upstream monitoring area (A site) was considered. Based on the long-term (1/1/2011~12/31/2011) rainfall and flow data consisting of 10-min interval sampling in the nearby design area (B site), the maximum RDII/DWF ratio was selected. The sewer network system at B site was evaluated by the Manning equation. Scenario 1 considering the hourly maximum flow with respect to the flow velocity showed that none of the sewer pipes satisfied the minimum flow velocity condition (0.6 m/s), and 40 pipes did not achieve half of the velocity condition. In scenario 2 considering I/I, 1 the pipes satisfied 0.6 m/s, and 35 pipes showed 0.3 m/s. Scenario 3 reflected the effect of RDII. Velocities in 26 pipes were less than 0.3 m/s, and 4 pipes satisfied the velocity condition. With respect to the allowance rate, 17 pipes were shown to have more than 99%, and none of the pipes satisfied less than 95% of the allowance rate in scenario 1. In scenario 2, 17 Ed: Per the Table pipes showed more than 99% and one pipe showed less than 95%. In scenario 3, 16 pipes showed more than 99% of the allowance rate, and 19 pipes showed less than 95%. Based on these results, it is predicted that deposition would occur due to the slow flow velocity; however, capacity would not be a problem.