• Title/Summary/Keyword: sewer rehabilitation

Search Result 44, Processing Time 0.026 seconds

Estimation of Water Quality Variation in Sewer Network using MOUSE TRAP Model (MOUSE TRAP 모델을 이용한 하수관거내 수질변화 예측)

  • Yang, Hae Jin;Jun, Hang Bae;Son, Dae Ik
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.6
    • /
    • pp.743-752
    • /
    • 2009
  • One of the major problems associated with operation of domestic sewer lines involves hydraulic problems such as insufficient conveyance capacity, exceeding maximum velocity, and deficiency of minimum velocity. It has also been pointed out that influent concentration lower than design concentration of pollutants, which is mainly caused by unidentified inflow and infiltration, degrades the operational efficiency of many sewage treatment plants (STPs). A computer-added analysis method supporting a coupled simulation of sewage quality and quantity is essentially required to evaluate the status of existing STPs and to improve their efficiency by a proper sewer rehabilitation work. In this study, dynamic water quality simulations were conducted using MOUSE TRAP to investigate the principal parameters that governs the changes of BOD, ${NH_4}^+$, and ${PO_4}^{3-}$3- concentrations within the sewer networks based on data acquired through on-site and laboratory measurements. The BOD, ${NH_4}^+$ and ${PO_4}^{3-}$3- concentrations estimated by MOUSE TRAP was lower than theoretical pollution loads because of sedimentation and decomposition in the sewer. The results revealed that sedimentation is a most important factor than other biological reactions in decreasing pollutant load in the sewers of C-city. The sensitivity analysis of parameters pertaining to water quality changes indicated that the effect of the BOD decay rate, the initial DO concentration, the half-saturation coefficient of dissolved BOD, and the initial sediment depth is marginal. However, the influence of settling rate and temperature is relatively high because sedimentation and precipitation, rather than biological degradation, are dominant processes that affect water quality in the study sewer systems.

Evaluation of influent changing effect on the STP performance using Dr. Wastewater (Dr. Wastewater program의 적용을 통한 하수처리장 운전에 미치는 유입수 변동 영향평가)

  • Kim, Youn Kwon;Kim, Hong Suck;Seo, In Seok;Kim, Byung Goon;Han, In Sun;Kim, Jin Sang
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.22 no.6
    • /
    • pp.647-655
    • /
    • 2008
  • Sewer Rehabilitation Project (SRP) is planed, designed and constructed to perform its intended performance as sewerage delivery systems. Recently, a subject of performance evaluation methodology development for SRP has become a great deal of concern among researchers in Korea. From the view point of Sewage Treatment Plant (STP), however, the estimation of improvement efficiency for SRP is in lack of reliability due to the fact that affections for the treatment efficiency and operating condition are not reflected on SRP design and construction. In this study, statistical methodology was used in the analysis of data, which are taken during 1,186 days ($1^{st}$ Jan. 2005 - $31^{th}$ Mar. 2008) from the influent, effluent and operating conditions of full-scale STP($25,000m^3/d$). Then the effect of SRP on the influent characteristics and operating conditions changing was compared and evaluated. Results from the statistical evaluation show that SRP causes characteristic changes in influent and exerts a significant effect especially on the performance of STP.

Development of Evaluation Methodology on the Performance of BTL Sewer Rehabilitation Projects (하수관거정비 BTL사업의 효과분석 및 방안 수립 연구)

  • Song, Ho-Myeon;Cho, Jeong-Il;Ahn, Choong-Hee
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.6
    • /
    • pp.743-751
    • /
    • 2010
  • It requires an interim performance assessment for BTL business of the sewerage rehabilitation which continues from 2005 till now. Means, It is necessary to make an interim performance assessment and an analysis of an business effect of the sewerage rehabilitation BTL projects which still continues, and we presented an improvement method of the new sewerage rehabilitation project in future. This paper has conducted an analysis of the business effect for 3 local government BTL projects which are completed and under operation as of now in Jincheon-Gun, Cheongju-Si and Gangjin-Gun. As a method of business effect analysis, we conducted a business effect of the 3 places using the index set which we previously set for the business effect analysis. The index set in this research was sectionalized to an improvement effect of operating wastewater treatment plant, an benefit effect of the direct cost, an benefit effect of the indirect cost and an environment friendly effect. We, in this paper, conducted an business effect analysis for 3 sewerage rehabilitation BTL projects which are completed or under operation recently as a demonstration, however we judge that an business effect analysis shall be conducted in a stage that a significant time for operation has passed since the completion of the construction in order to induce an actual business effect of the sewerage rehabilitation BTL project.

Investigating Wastewater Flow Characteristics - O and M Treatment Basins of A City - (처리분구별 하수발생 특성 조사 - A시 O, M 처리분구 -)

  • Hwang, Byung-Gi
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.19 no.3
    • /
    • pp.348-356
    • /
    • 2005
  • Water quality sampling surveys and continuous measurement of flow were conducted to identify wastewater flow characteristics for representative catchment of O and M treatment basins in A city. For HS-1 station representing commercial area, wastewater flow rises in the beginning of office-working hours, moves up and down within narrow range, and lasts till office-leaving hour, and falls gradually reflecting worker's returning home. However, in HS-2 station representing residential area, wastewater flow has two peaks, which are before office-going hour and after office-leaving hour. In residential area, the flow rate of weekends is higher than that of weekdays because it reflects population, being not contributed to generate wastewater during the working hours of weekdays, stay home and produce wastewater for weekends period. To determine the priority for rehabilitation of sewer system, infiltration rate was computed by dividing infiltration flow by mean diameter and total length of sewer, and HS-1 station ranked the first.

Analysis of the wastewater characteristics variation in sewerage by rehabilitation (관거 정비에 따른 하수발생특성 분석)

  • Jung, SiMon;Park, InHyeok;Park, JungHa;Ha, SungRyoung
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.3
    • /
    • pp.287-293
    • /
    • 2009
  • The study involved the measurement of flowrate and BOD in the Yeoju area and analyzed annual sewerage data by the I/I analysis technique which is common in Korea. The results of this study are as follows. The I/I for the Y-1 site before maintenance and after the completion of the whole process was reduced from 62% to 16.1% respectively with respect to maximum sewage flow per day. The average quality of water increased. The study measured the Y-2 site from a point of time corresponding to an 80% process rate and its I/I rate went up a little from 8.5% to 11.5%. At the Y-3 site, the I/I rate went up a little from 11% to 13.8%, while little change was noted in the average water quality. At the Y-4 site, the I/I rate was reduced from 43% to 16.9% and its average water quality went up. At the Y-5 site, the I/I quantity went up a little however its average water quality also went up largely. Therefore, it was concluded that the Y-5 site showed great improvement due to the sewer pipe maintenance.

Hydrologic Cycle Simulation of Urban River for Rehabilitation of Water Environment (II) - Dorimcheon Basin - (물 환경 건전화를 위한 도시하천의 물 순환 모의 (II) - 도림천 유역 -)

  • Lee, Sang-Ho;Lee, Jung-Min
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.5
    • /
    • pp.815-823
    • /
    • 2006
  • The hydrologic cycle in urban catchment has been changed due to the expansion of impervious area by rapid urban development. In this study, the SWMM 5 (Storm Water Management Model 5) model was used to simulate the hydrologic cycle of the Dorimcheon catchment which suffers from the distorted hydrologic cycle as a typical urban catchment. This study compare continuous simulation of urban runoff combining the channel and sewer system with that of channel only in the Dorimcheon catchment. Continuous simulations of urban runoff were performed for the upstream basin of Dorim bridge. The urban impervious regions were processed by the land use analysis from LANDSAT_TM images. It was performed from 1975 to 2000 for every five years. Surface, groundwater and wastewater runoffs were additionally included in the simulations one at a time. Such simulations made it possible to evaluate those components quantitatively. The result of continuous simulation of urban runoff combining the channel and sewer system is that peak flow and recession are well simulated. The analysis results of urbanization effect on runoff are as follows: the surface runoff in 2000 increases to 64% of the whole precipitation whereas the surface runoff in 1975 amounts to 46% of the precipitation; the groundwater runoff in 2000 amounts to 6% and shows 8% decrease during the period from 1975 to 2000.

Characterization of Repairing PVC profile for Trenchless Sewer Pipeline (비굴착 하수관로용 PVC 프로파일 보수재 특성 평가)

  • Park, Joon-Ha;Jeon, Sang-Ryeol;Lee, Kwan-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.7
    • /
    • pp.4977-4983
    • /
    • 2015
  • The full depth excavation induces couple of technical and social problems like increase of construction cost and time for excavation and backfill, increase of public complains and delay of traffic, and so force. In order to overcome these problems, lots of laboratory tests were carried out for sewer pipeline of maintenance materials with trenchless methods. The testing materials are PVC strip and then the lab tests were followed by Korean Standard. We will treat the structure safety and pipe integrity of PVC profile more excellent than the profile have application to SPR. There is no side-effect to process and to satisfy the criteria of tensile strength, impact strength and softening temperature. The profile with resin adhesive showed no leakage of water at specific pressure.

Performance analysis of flood prevention projects through flood simulation (침수 시뮬레이션을 통한 침수예방사업의 성과분석)

  • Shin, Jungsub;Chung, Seokhyun;Cho, Byoungog;Kang, Seonhong;Park, Byungman;Yoon, Joonjae
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.32 no.2
    • /
    • pp.169-181
    • /
    • 2018
  • For performance analysis of flood prevention projects, this study performed simulation (SWMM) for the five sites where the projects have been completed. The models were constructed using watershed and sewer information of the project sites and were verified using flood records in the past to improve accuracy. In this simulation, the design rainfall data (probability 30~50 years) and the rainfall data in the summer of 2017 were applied. When the design rainfall data was applied to the models, simulation results presented that all the sites were flooded before the projects, but after the projects all the sites were not flooded due to improve discharge capacity. And when the rainfall data in the summer of 2017 was applied to the models, simulation results presented that all the sites were flooded before the projects, but after the projects any sites did not occur flooding in this summer. So if the projects had not been completed, all the sites might be flooded in the summer of 2017. These effects were analyzed as the improvement of discharge capacity due to rehabilitation of sewer, construction of underground tunnel and pumping station, etc. As the results, ratio of sewer that water depth exceed diameter reduced from 52.3~75.8% to 17.1~39.8%.

Development of an Optimal Trajectory Planning Algorithm for an Automated Pavement Crack Sealer

  • Yoo, Hyun-Seok;Kim, Young-Suk
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.35-44
    • /
    • 2012
  • In the last two decades, several tele-operated and machine-vision-assisted systems have been developed in the construction and maintenance area, such as pavement crack sealing, sewer pipe rehabilitation, and excavation. In developing such tele-operated and machine-vision-assisted systems, trajectory plans are very important tasks for the optimal motions of robots whether their environments are structured or unstructured. This paper presents an optimal trajectory planning algorithm used for a machine-vision-assisted automatic pavement crack sealing system. In this paper, the performance of the proposed optimal trajectory planning algorithm is compared with the greedy trajectory plans, which are used in the previously developed pavement crack sealing systems. The comparison is based on the computational cost vs. the overall gains in crack sealing efficiency. Finally, it is concluded that the proposed algorithm plays an important role in the productivity improvement of the developed automatic pavement crack sealing system.