• Title/Summary/Keyword: settlement space

Search Result 324, Processing Time 0.024 seconds

Reliability analysis of surface settlement during shield TBM tunneling (쉴드 TBM 터널 굴착시 지표침하에 관한 신뢰성해석)

  • Han, Myeong-Sik;Cho, Kuk-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.3
    • /
    • pp.305-318
    • /
    • 2016
  • This study is to evaluate the uncertainty of the soil parameters associated with the Gap parameter during shield TBM tunnel excavation of ${\bigcirc}{\bigcirc}$ International Airport Terminal 2 connecting railway construction basic design. And This study is to evaluate the adequacy of the shield TBM design by performing a reliability analysis of the Surface settlement. In addition, By analyzing the reliability indices of the design constants and Sensitivity probability of failure to be used in designing an integer parameter Gap, and By evaluating the design constants of a great influence on the surface subsidence, it was to provide a basis for carrying out an optimum design.

Test and analysis of settlement pattern of trackbed during pipe roof excavation (각관 추진 굴착시 궤도노반의 침하경향 실험분석)

  • Jung, Kwan-Dong;Eum, Ki-Young;Choi, Chan-Yong;Jo, Su-Ik;Hwang, In-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.895-902
    • /
    • 2010
  • The method in a bid to make better use of limited urban space amidst increasingly expanding urban area have been attempted in various ways. Efficient using underground space is one of the examples. The pipe roof and excavation for underground crossing implemented in this study was the part of evaluation of such attempt. However, the pipe roof method for underground crossing may cause the ground surface to be uplifted or settled down, having effect on structure above the ground. Thus in this study, a laboratory model test designed to evaluate the effect on surface during implementing pipe roof and excavation was carried out. The ground displacement during pipe roof advancing and excavation is usually occurred in a radial shape but as the study focused on trackbed, the evaluation included ground settlement only. Thus, appropriately-scaled model was selected considering domestic geological characteristics and operation characteristics of traditional and high-speed rail trains and the qualitative evaluation of displacement was carried out with a certain ground loss depending on excavation after categorizing trackbed settlement pattern depending on depth of top soil.

  • PDF

A Study on the Conservation of Named and Physiognomically Perceived Landform -case study on 'MOK'-MAEUL(settlement name include korean character 'mok' which is landform and space like neck) in Kyongsangnam-do (지명 명명공간의 형태와 상모적지각의 지형보전적 고찰 -경상남도 '목'마을을 대상으로-)

  • 강영조
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.21 no.2
    • /
    • pp.68-79
    • /
    • 1993
  • The purpose of this study is to establish a theory for conservation of named and physiognomically perceived landform. And this study investigated the characteristics of the spatial form and physiognomic perception of MOK(is landform and space like neck) in MOK-MAEUL(settlement name including korean character 'mok') in Kyongsangnamdo. The surveyed sites are 52 MOK-MAEUL. The MOK representing a particular landform is divided into 5 types and the characteristics of landform were analyzed. The residents recognized a MOK as a living form and thought that influenced their wealth and security.

  • PDF

Numerical investigation on the effect of backfill grouting on ground behavior during shield TBM tunneling in sandy ground (사질토 지반을 통과하는 쉴드 TBM에서 뒤채움 그라우팅이 지반 거동에 미치는 영향에 대한 수치해석적 연구)

  • Oh, Ju-Young;Park, Hyunku;Chang, Seokbue;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.375-392
    • /
    • 2018
  • The shield TBM method is widely adopted for tunneling works in urban area because it has more beneficial ways to control settlement at ground surface than conventional mined tunneling. In the shield tunneling, backfill grouting at tail void is crucial because it is supposed not only to restraint ground deformation around tail void during excavation but also to compensate precedent ground settlement by pushing up the ground with highly pressurized grout. However, the tail void grouting has been found to be ineffective for settlement compensation particularly in sandy ground, which might be caused by complicate interaction between ground and tail void grouting. In this paper, the effects of tail void grouting on behavior of ground in shield TBM tunneling were investigated based on 3-dimensional finite element analyses. The results of numerical analyses indicated that backfill grouting actually reduces settlement by degrading settlement increasing rate in excavation, which means decrease of volume loss. Meanwhile, the grouting could not contribute to compensate the precedent settlement, because reduction of volume loss by grouting was found to be counterbalanced by volume change of ground.

Critical face pressure and backfill pressure of shield TBM considering surface settlements of saturated clayey ground (쉴드 TBM 굴진에 따른 포화 점성토 지반의 침하거동을 고려한 한계 굴진면압과 한계 뒤채움압)

  • Kim, Kiseok;Oh, Ju-Young;Lee, Hyobum;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.433-452
    • /
    • 2018
  • The shield tunneling method can minimize surface settlements by preventing the deformation of tunnel face and tunnel intrados due to tunnel excavation. For this purpose, it is very important to control the operating conditions of shield TBM. The face pressure and backfill pressure for tail void grouting should be the most important and immediate measure not only to restrain surface settlement, but also to influence the effective stress and pore water pressure around the circumstance of tunnel during excavation. The reaction of the ground to the application of face pressure and backfill pressure relies on the stiffness and permeability of ground. Especially, the reaction of saturated clayey ground formations, which shows the time-dependent deformation, is different from the permeable ground. Hence, in this paper it was investigated how the TBM operating conditions, ground stiffness, and permeability impact on the surface settlement of saturated clayey ground. For this purpose, a series of parametric studies were carried out by means of the stress-pore water pressure coupled FE analysis. The results show that the settlement of soft clayey ground is divided into the immediate settlement and consolidation settlement. Especially, the consolidation settlement depends on the ground stiffness and permeability. In addition, the existence of critical face pressure and backfill pressure was identified. The face pressure and backfill pressure above the critical value may cause an unexpected increase in the ground settlement.

A case study of ground subsidence analysis using the InSAR technique (InSAR 기술을 이용한 지반침하분석 사례연구)

  • Moon, Joon-Shik;Oh, Hyoung-seok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.2
    • /
    • pp.171-182
    • /
    • 2022
  • InSAR (Interferometry SAR) technique is a technique that uses complex data to obtain phase difference information from two or more SAR image data, and enables high-resolution image extraction, surface change detection, elevation measurement, and glacial change observation. In many countries, research on the InSAR technique is being conducted in various fields of study such as volcanic activity detection, glacier observation in Antarctica, and ground subsidence analysis. In this study, a case of large ground settlement due to groundwater level drawdown during tunnelling was introduced, and ground settlement analyses using InSAR technique and numerical analysis method were compared. The maximum settlement and influence radius estimated by the InSAR technique and numerical method were found to be quite similar, which confirms the reliability of the InSAR technique. Through this case study, it was found that the InSAR technique reliable to use for estimating ground settlement and can be used as a key technology to identify the long-term ground settlement history in the absence of measurement data.

Comparative analysis of ground settlement and tunnel displacement due to tunnel excavation considering topographic information based on GIS (GIS 기반 지형 정보를 고려한 터널 굴착에 따른 지반침하와 터널 변위 비교 분석)

  • Jae-Eun, Cho;Ye-Rim, Jung;Seong-Min, Song;Ji-Seok, Yun;Sang-Gui, Ha;Han-Kyu, Yoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.1
    • /
    • pp.13-26
    • /
    • 2023
  • Recently, as the development of underground spaces has become active due to rapid urbanization and population density, interest in the ground behavior according to the construction of underground spaces is increasing. In large cities with high population density and many buildings, ground subsidence has a great impact on structures and there may be a risk of collapse, so the analysis of ground behavior due to underground construction is essential. Previous studies have been conducted on the subsidence pattern of the surface and the deformation of the tunnel when constructing the tunnel, but analysis has rarely been conducted by using actual topographic information. Therefore, this study analyzed the difference in ground behavior between the actual topography and the flat topography. As a result, it was confirmed that ground settlement occurs at higher elevations, such as in mountainous topography, and when the numerical analysis is performed considering topographical information, the crown settlement of the tunnel is up to about approx. It showed a difference of 10 mm, and it was found that the sensitivity was less in the case of displacement of tunnel wall compared to the crown settlement and ground settlement. The numerical analysis considering the actual GIS-based topographic information presented in this study can be used to obtain more accurate surface subsidence data to understand the behavior of the upper structure due to tunnel excavation.

Analysis of settlements of space frame-shear wall-soil system under seismic forces

  • Jain, D.K.;Hora, M.S.
    • Earthquakes and Structures
    • /
    • v.8 no.5
    • /
    • pp.1255-1276
    • /
    • 2015
  • The importance of considering soil-structure interaction effect in the analysis and design of RC frame buildings is increasingly recognized but still not penetrated to the grass root level owing to various complexities involved. It is well established fact that the soil-structure interaction effect considerably influence the design of multi-storey buildings subjected to lateral seismic loads. The shear walls are often provided in such buildings to increase the lateral stability to resist seismic lateral loads. In the present work, the linear soil-structure analysis of a G+5 storey RC shear wall building frame resting on isolated column footings and supported by deformable soil is presented. The finite element modelling and analysis is carried out using ANSYS software under normal loads as well as under seismic loads. Various load combinations are considered as per IS-1893 (Part-1):2002. The interaction analysis is carried out with and without shear wall to investigate the effect of inclusion of shear wall on the total and differential settlements in the footings due to deformations in the soil mass. The frame and soil mass both are considered to behave in linear elastic manner. It is observed that the soil-structure interaction effect causes significant total and differential settlements in the footings. Maximum total settlement in footings occurs under vertical loads and inner footings settle more than outer footings creating a saucer shaped settlement profile of the footings. Each combination of seismic loads causes maximum differential settlement in one or more footings. Presence of shear wall decreases pulling/pushing effect of seismic forces on footings resulting in more stability to the structures.

Characteristics of Subsidence of a Road During the New Tubular Roof Construction Around a Shallow Tunnel (저심도 터널주변의 NTR보강 중 발생한 도로면 침하의 특성)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.28 no.6
    • /
    • pp.620-634
    • /
    • 2018
  • The NTR(New Tubular Roof) method was used to secure the stability of the tunnel and minimize the subsidence of the road. The tunnel was constructed at about 7.5 meters deep below the highway. with a width of about 21 meters. Following the NTR method, 13 steel pipes with a diameter of 2.3 meters were digged and pushed in longitudinally along the tunnel profile and cut out sides of pipes to connect to adjacent pipes, then filled the inside of pipes and the connected space between pipes with concrete to complete the lining of the tunnel to be excavated. As the steel pipes were digged in sequentially, the area of relaxation was connected to each other and behaves like a gradually widening tunnel. When the steel pipes were digged in to the widest points of the tunnel, the settlement rate of the road surface was increasing to the maximum as 2.2 mm and the total settlement until the lining construction was approximately 7.7 mm. After that, by excavating a tunnel inside the pre-installed lining, an additional settlement of about 4.3 mm was occurred, resulting in the total settlement of about 11.8 mm after completing of tunnel construction.

The prediction of deformation according to tunnel excavation in weathered granite (화강 풍화암지반의 터널굴착에 따른 변형예측)

  • Cha, Bong-Geun;Kim, Young-Su;Kwo, Tae-Soon;Kim, Sung-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.4
    • /
    • pp.329-340
    • /
    • 2010
  • Mechanical behavior of underground cavity construction such as tunnel is very difficult to estimate due to complexity and uncertainty of ground. Prediction of behavior according to excavation of tunnel mainly uses method utilized of model test or numerical analysis. But scale model test is difficult to reappear field condition, numerical analysis is also very hard to seek choice of suitable constituent model and input data. To solve this problem, this paper forecasted the deformation of tunnel that applied to information of crown settlement and convergence, RMR in weathered granite by using the regression analysis. The result of the analysis shows that the crown settlement according to excavation occurs approximately 70~80% of total displacements within about 20 days. As a result of the prediction of crown settlement and convergence, an exponential function becomes more accurate at measurements than an algebraic function. Also this paper got a correlation in comparison of RMR and displacements of 6 sections.