• Title/Summary/Keyword: settlement control

Search Result 228, Processing Time 0.033 seconds

The Effect of Construction Safety Supervision System on Risk Control and Reduction (건설안전감리제도가 위험제어 및 절감에 미치는 영향)

  • Lim, Jin-Sang;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.20 no.3
    • /
    • pp.1-9
    • /
    • 2018
  • This study is intended to look into the effect of construction safety supervision system on risk control and reduction. To achieve this, a survey was carried out to 114 companies in construction, ordering, contract and management. The overall findings were as follows. The effect of construction safety supervision system on risk control and reduction showed that factors of supervision system, supervision cost and supervision method had a positive effect on risk control and reduction. And their perception of the introduction of safety supervision system in construction sites according to process showed that there was a difference between them according to the field of ordering, contract and supervision. There was the biggest difference between owner and contractor in double supervision system, but no difference between them in the perception of risk reduction. These results show that all ordering, contract and supervision are positively needed for the introduction of construction safety supervision. This means that there is a difference between owner and contractor in the perception of process according to system operation. All companies agree to system improvement by the settlement of safety supervision system for the prevention of safety accidents and safe construction, but the systematic complement of safety supervision is the burden of contractor. And there is a big difference between owner and contractor in the perception of responsibility and concern for cost burden.

Grey algorithmic control and identification for dynamic coupling composite structures

  • ZY Chen;Ruei-yuan Wang;Yahui Meng;Timothy Chen
    • Steel and Composite Structures
    • /
    • v.49 no.4
    • /
    • pp.407-417
    • /
    • 2023
  • After a disaster like the catastrophic earthquake, the government have to use rapid assessment of the condition (or damage) of bridges, buildings and other infrastructures is mandatory for rapid feedbacks, rescue and post-event management. Many domain schemes based on the measured vibration computations, including least squares estimation and neural fuzzy logic control, have been studied and found to be effective for online/offline monitoring of structural damage. Traditional strategies require all external stimulus data (input data) which have been measured available, but this may not be the generalized for all structures. In this article, a new method with unknown inputs (excitations) is provided to identify structural matrix such as stiffness, mass, damping and other nonlinear parts, unknown disturbances for example. An analytical solution is thus constructed and presented because the solution in the existing literature has not been available. The goals of this paper are towards access to adequate, safe and affordable housing and basic services, promotion of inclusive and sustainable urbanization and participation, implementation of sustainable and disaster-resilient buildings, sustainable human settlement planning and manage. Simulation results of linear and nonlinear structures show that the proposed method is able to identify structural parameters and their changes due to damage and unknown excitations. Therefore, the goal is believed to achieved in the near future by the ongoing development of AI and control theory.

Settlement Instrumentation of Greenhouse Foundation in Reclaimed Land (간척지 온실 기초의 침하량 검토)

  • Choi, Man Kwon;Yun, Sung Wook;Yu, In Ho;Lee, Jong-Won;Lee, Si Young;Yoon, Yong Cheol
    • Journal of Bio-Environment Control
    • /
    • v.24 no.2
    • /
    • pp.85-92
    • /
    • 2015
  • This study examined the settlement of a 1-2W type greenhouse using a timber pile, which was recently established on Gyehwa-do reclaimed land, in order to obtain base data for the construction of a greenhouse on reclaimed land. The results of this study are as follows. foundation and timber pile increased over time, irrespective of the interior and exterior of the upon investigation of the ground, it was confirmed that there was no soft rock stratum (bedrock), and that a sedimentary stratum existed under the fill deposit, which is estimated to have been reclaimed during the site renovation. It was also found that a weathered zone was located under the fill deposit and sedimentary stratum, and that the soil texture of the entire ground floor consisted of clay mixed with sand, silty clay, and granite gneiss, in that order, regardless of boreholes. In addition, the underground water level was 0.3m below ground, regardless of boreholes. Despite a slight difference, the settlement of the greenhouse or measurement sites (channels). With regard to the pillar inside the greenhouse, except in the case of CH-2, the data at a site located on the side wall of the greenhouse (wind barrier side) indicated vibrations of relatively larger amplitude. Moreover, the settlement showed a significant increase during a certain period, which was subsequently somewhat reversed. Based on these phenomena, it was verified that the settlement range of each site in the interior and exterior of the greenhouse was between 1.0 and 7.5mm at this time, except in the case of CH-1. The results of the regression analysis indicated good correlation, with the coefficient of determination by site ranging between 0.6362 and 0.9340. Furthermore, the coefficient of determination ranged between 0.6046 and 0.8822 on the exterior of the greenhouse, which is lower than inside the greenhouse, but still indicates significant correlation.

Control System of Simulation-based Government Level Exercise for Emergency Preparedness (시뮬레이션 기반 비상대비 정부연습의 통제체제에 관한 연구)

  • Joo, Choong-Geun;Jin, Jong-Lok;Byun, Hae-Yun;Youn, Sang-Youn
    • The Journal of the Korea Contents Association
    • /
    • v.22 no.8
    • /
    • pp.54-72
    • /
    • 2022
  • This study is on the control system of simulation-based emergency preparedness 'government level exercise'(GOV-Ex), which provides main control elements required for each stage of planning, preparation, implementation, and follow-up measures and its operation concept. For this purpose, the control requirements of 'simulation-based government level exercise'(GOVSIM-Ex) was derived through the preceding studies on GOV-Ex and simulation exercise control in military exercise and disaster exercises and then the concept of operation was presented. The main contents are exercise planning and key event scenario, the linkage between simulation model and other models, the composition of the simulation control center and the organization's workstation(WS), DB, control and evaluation team etc. The study limited to the main control elements, not all the control elements required for the GOVSIM-Ex, and it has limitations that the specific implementation plan of some control elements proposed has not been presented. These are presented as a future research subject. The study will promote the development of the GOVSIM-Ex Control System and early settlement of GOSIMV-Ex in the future.

Type-2 Fuzzy Logic Predictive Control of a Grid Connected Wind Power Systems with Integrated Active Power Filter Capabilities

  • Hamouda, Noureddine;Benalla, Hocine;Hemsas, Kameleddine;Babes, Badreddine;Petzoldt, Jurgen;Ellinger, Thomas;Hamouda, Cherif
    • Journal of Power Electronics
    • /
    • v.17 no.6
    • /
    • pp.1587-1599
    • /
    • 2017
  • This paper proposes a real-time implementation of an optimal operation of a double stage grid connected wind power system incorporating an active power filter (APF). The system is used to supply the nonlinear loads with harmonics and reactive power compensation. On the generator side, a new adaptive neuro fuzzy inference system (ANFIS) based maximum power point tracking (MPPT) control is proposed to track the maximum wind power point regardless of wind speed fluctuations. Whereas on the grid side, a modified predictive current control (PCC) algorithm is used to control the APF, and allow to ensure both compensating harmonic currents and injecting the generated power into the grid. Also a type 2 fuzzy logic controller is used to control the DC-link capacitor in order to improve the dynamic response of the APF, and to ensure a well-smoothed DC-Link capacitor voltage. The gained benefits from these proposed control algorithms are the main contribution in this work. The proposed control scheme is implemented on a small-scale wind energy conversion system (WECS) controlled by a dSPACE 1104 card. Experimental results show that the proposed T2FLC maintains the DC-Link capacitor voltage within the limit for injecting the power into the grid. In addition, the PCC of the APF guarantees a flexible settlement of real power exchanges from the WECS to the grid with a high power factor operation.

Intelligent Microclimate Control System Based on IoT

  • Altayeva, Aigerim Bakatkaliyevna;Omarov, Batyrkhan Sultanovich;Cho, Young Im
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.16 no.4
    • /
    • pp.254-261
    • /
    • 2016
  • The present research paper is devoted to solving an urgent problem, i.e., the energy saving and energy efficiency of buildings. A rapid settlement method and experimental control of the energy conservation based on the specific characteristics of the thermal energy consumption for the heating and ventilation of the buildings, and as well as the rapid development of wireless sensor networks, can be used in a variety of monitoring parameters in our daily lives. Today's world has become quite advanced with smart appliances and devices such as laptops, tablets, TVs, and smartphones with various functions, and their use has increased significantly in our day-to-day lives. In this case, the most important role is played by a wireless sensor network with its development and use in heterogeneous areas and in several different contexts. The fields of home automation, process management, and health management systems make extensive use of wireless sensor networks. In this paper, we explore the main factors of the microclimate in an indoor environment. We control the temperature humidity, and other factors remotely using sensors and Internet-of-Things technologies.

Smoking and Health Control (흡연과 건강관리)

  • 박선섭
    • Korean Journal of Health Education and Promotion
    • /
    • v.6 no.2
    • /
    • pp.66-75
    • /
    • 1989
  • About smoking and health control by theorize of common with various records investigation prevent an injury from smoking Further, should be contribute for the national health improvement for application of guide to health education. The results of investigation are as follows; 1) Tobacco be transmitted the first year of KwangHea's(reign) from GeeRu(the year of GeeRu), before sixth year of KwangHea's GapIn. 2) By reason of smoking an extreme poison ingerdients is Nicotine, Co, Tar etc three kinds. 3) The number of chemicalcompound in the tobacco smoking. Nicotine play an important part of it makes continue to smoking act. 4) Co, Not only injury vascular in the cell wall but also influence in ardiac muscular tissue. 5) Tar, is play an important part tl determine taste of tobacco or fragrace(a sweet smell). 6) Be demaged in the body with harmful objects of tobacco is first lung cancer, next heart disease, and chronic lung disease etc. 7) Passive smoke(indirect smoke)is first smoker's when have smoking and blow smoke from cigarette take smoking. On second when take smoking as it is burning cagar to end. 8) Female smoker are no good and bring many trouble to the mother's body and fetal body(an unborn child). 9) Nicotine also, like drug and alcohol break out reliance, introspection, poisonous or obstinence syndrome 10) A counterplan about smoke should be settlement with propriety control of smoking and an antismoking(non-smoker).

  • PDF

A Study on Earned Value Management System (EVMS) For Project Using ERP System (ERP 시스템을 이용한 프로젝트 EVMS에 관한 연구)

  • Park, Je-Won;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.4
    • /
    • pp.145-151
    • /
    • 2010
  • It seems that a primary concern of the project-based company, which provides a large scale product or service over long term period, is to run a successful project through systematic project process control and control costs. One of the typical project control methods is Earned Value Management System(EVMS) which analyses the precess through performance measurement. Even though the EVMS is a highly efficient tool in the managerial aspect, it cannot easily determine the Planned Value(PV), Actual Cost(AC), or Earned Value(EV) due to the indistinct criteria and extensive data. The accurate calculation of AC in particular, is the basic of project management, but most companies record direct personnel expenses or direct expenses only. Since they calculate indirect expenses based on the estimated ratio, it limits the systematic project management that reflects changes in profit and loss of a company. This study introduces a EVMS for project management and its actual case based on EVMS and ERP system which some additional modules are installed for performance measurement. It is expected that this new method enables a company to save time and effort, and also to improve transparency by specifying expense items in detail and to switch quarterly settlement to monthly by reducing the time of calculation.

Bearing Capacity of Driven H-Piles in Embankment (성토지반에 타입된 H형강 말뚝의 지지거동)

  • 박영호;정경자;김성환;유성근;이재혁;박종면
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.173-182
    • /
    • 2000
  • To find axial and lateral responses of impact-driven H piles in embankment(SM), the H piles are instrumented with electric strain gages, dynamic load test is performed during driving, and then the damage of strain gages is checked simultaneously. Axially and laterally static load tests are performed on the same piles after one to nine days as well. Then load-settlement behavior is measured. Furthermore, to find the set-up effect in H pile, No. 4, 16, 26, and R6 piles are restriked about 1, 2, and 14 days after driving. As results, ram height and pile capacity obtained from impact driving control method become 80cm and 210.3∼242.3ton, respectively. At 15 days after driving, allowable bearing capacity by CAPWAP analysis, which 2.5 of the factor of safety is applied for ultimate bearing capacity, increases 10.8%. Ultimate bearing capacity obtained from axially static load test is 306∼338ton. This capacity is 68.5∼75.7% at yield force of pile material and is 4∼4.5 times of design load. Allowable bearing capacity using 2 of the factor of safety is 153∼169ton. Initial stiffness response of the pile is 27.5ton/mm. As the lateral load increases, the horizontal load-settlement behaves linearly to which the lateral load reaches up to 17ton. This reason is filled with sand in the cavity formed between flange and web during pile driving. As the result of reading with electric strain gages, flange material of pile is yielded at 19ton in horizontal load. Thus allowable load of this pile material is 9.5ton when the factor of safety is 2.0. Allowable lateral displacement of this pile corresponding to this load is 23∼36mm in embankment.

  • PDF

A Comparative Study on Fisheries Resource Management System between Korea and China (한·중 어업자원관리제도에 관한 비교연구)

  • Cha, Cheol-Pyo
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.13 no.2
    • /
    • pp.146-167
    • /
    • 2001
  • Korea and China are two opposite countries located aside Yellow Sea and co-utilize the East China Sea. The two countries are close together from geological point of view, however, the competitive development of resources was more emphasized than the cooperative development of resources between the two countries because the special policy relationship. Additionally, after the communist government of China was founded in 1949, the political conception between the two countries was quite different. Therefore the establishment of appropriate international fisheries co-operation was impossible, and the international management problems of fisheries resources in Yellow Sea and East China Sea were let alone. UN convention on the Law of the Sea came to force in 1994, Korea and China adopted the exclusive economic zone system in 1996. On the other hand, Fisheries Law in Korea was enacted in 1953 in order to management of fisheries resources, and also China was enacted fisheries law in 1986. The two countries control the fisheries effort through fisheries license system, meanwhile through prohibition fishing area, prohibition fishing period, limitation of net size, and limitation of body length to conserve and manage the fisheries resource. The serious management methods of resource management in the two countries are similar such as the creation of promptly decreased species and those species that have commercial value, discharge of fish seedling stock, settlement of artificial reef and clean of fishing ground. Therefore, the two countries should consider not only the improvement of formal law system, but also how to recover the fisheries resources in circumference water zone and how to improve the efficiency of fisheries resource management. Specially the settlement and management of artificial reef should be chosen in the area that have the highest benefit to two countries, and should establish the common management system of discharge of fish seedling stock. And the two countries should adopt the same criteria through technical management and limitation of net size, limitation of body length, and prohibition area of special fisheries to ensure the highest fisheries benefit of fisherman in the two countries and the highest efficiency of fisheries resource management.

  • PDF