• Title/Summary/Keyword: school facilities BTL project

Search Result 14, Processing Time 0.024 seconds

An overall valuation about propriety of school facilities BTL through AHP (AHP를 이용한 학교시설 민간투자사업(BTL)의 타당성 종합평가)

  • Ha, Ho-Sung
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.5 no.1
    • /
    • pp.22-39
    • /
    • 2006
  • The purpose of this study is an overall valuation about propriety study of school facilities BTL(Build-Transfer-Lease) by means of AHP(Analytic Hierarchy Process). The search point includes these questions. Is BTL of school facilities a reasonable project for school, or is the former government financial project on the position of comparative superiority? And, is a partial BTL possible as an alternative plan? The result of this study shows that preference rate about BTL is 39%, that of former government financial project is 32%, and that of partial BTL is 29%.

  • PDF

A Study on School Facilities Build Transfer Lease Project - Centering on the improvement of the assessment - (학교시설 임대형민자사업의 평가기준 개선연구)

  • Kwon, Byoung-Koo;Lee, Jae-Rim;Jo, Jin-Il
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.7 no.2
    • /
    • pp.30-46
    • /
    • 2008
  • In this study, were prepared after statistical analysis was conducted of assessment items and marks distribution for the selection of executors of the BTL project. When tests of the degree of dispersion and degree of appropriateness for each assessment item were analyzed, it was found that the degree of dispersion among assessment points has the power of discrimination since it is highly marked in the design field and operation management field. In contrast, 'business management plan' and 'investment composition for economic quality assessment' have a low level of the power of discrimination since points given to them have smaller difference between business projects.

  • PDF

A Case Study on the Improvement Plan for Cost Prediction of Educational BTL Project based on Running Cost Analysis (교육시설 BTL사업의 유지관리비용 비교분석을 통한 비용추정 개선방안에 관한 사례연구)

  • Park, Moon-Sun;Song, Chang-Youg;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.139-149
    • /
    • 2007
  • The purpose of this study is to examine the problem of BTL(Build Transfer Lease) projects through comparative analysis on running costs, focusing on primary school, junior and senior high school education facilities, and then to provide useful information on the estimation of running costs by suggesting valid cost criteria. For this, eight schools from A and B consulting firms were sampled from capital region and other areas. Sampled schools were classified into four categories according to school grade, and running cost data are collected and analyzed from relative view points. The results of this study are as follows: 1) running costs which are analyzed by categories show some difference among sub-items, 2) major problems related to running cost prediction of BTL projects are revealed and improvement schemes are suggested for two groups (Owner and Project applicants).

Item Establishment and Importance Analysis for Qualitative VFM of BTL System (임대형 민자사업(BTL) 적격성 조사의 정성적 VFM 평가항목 설정 및 중요도 분석)

  • Yang, Jin-Kook;Ri, Min-Hyeon;Kim, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.92-100
    • /
    • 2007
  • PFI(Private Finance Initiative) Project is carried to expand infrastructure effectively through participation of private investment. From the year 2005, the range is expanded not only industrial infrastructure such as made road, harbors and so on but living infrastructure such as school facilities, environmental facilities. For this reason BTL(Build-Transfer-Lease) system is mainly used in new private finance initiative project but in existing private finance initiative project BTO(Build-Transfer-Operate) system was used. BTL system is operated to judge fitness of private investment and classified into quantitative VFM(Value for Money) and qualitative VFM. In this research the estimation item of qualitative VFM which is hard to deduce the effect is created and after surveying of questionnaire in target of experts, relative importance and weight is established with AHP(Analytic Hierarchy Process). By estimating efficiency and benefit of quantitative VFM and qualitative VFM aspect effectively it is expected to support a rational making decision for operating BTL.

The Evaluation of Value at Risk in Build Transfer Lease Project (민간투자사업의 위험가치 평가 - 임대형 민간투자사업(BTL)의 위험가치 평가 제도를 중심으로 -)

  • Choi, Seok-Joon;Kim, Sang-Sin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2907-2916
    • /
    • 2009
  • PPPs(Public Private Partnerships) in Korea was introduced in 1990s, which mainly used for providing transportation facilities such as railroad and high-way. Since 2005, a service delivery type PPPs, in other words BTL(Build Transfer Lease) has been implemented, which focused on social infra-structure including school, military housing, and sewage facilities. According to previous literature, efficient risk evaluation and management is the key factor for successful PPPs in the UK and Australia. However, Korea doesn't have proper risk evaluation system for PPP type project. In this paper, we explore and analyze risk evaluation system of PPPs in Korea and other countries. Also, we apply empirical methodology used in the UK to a BTL project and set up a new PSC(Public Sector Comparator) with risk evaluation.

A Case Study on the Change of Space Organization of School Facilities on the Design Planning Step - By Analyzing on the Plan of Schools by PFI - (설계단계별 학교시설의 공간구성 변화에 관한 사례 연구 - 민간투자사업 대상 학교의 도면 분석을 통하여 -)

  • Sim, Yeong-Ju;Rieu, Ho-Seop
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.14 no.4
    • /
    • pp.53-65
    • /
    • 2007
  • The present research has been conducted on the arranged form, the number and kinds, the area, the location of the rooms and the variation on exterior designs, based on a layout and a ground plan of each step, which are general plan, VE proposal and the final negotiation, for 11 elementary and middle and high schools that are designed in the way of BTL project. In consequence, it has been found out that there are some changes in the number and position of the rooms. However, the changes are not exceeding the overall arrangement form. This could not have led to the original aim, which is to induce creativity by PFI. It can be supposed that it is because the BTL system is stick to the old process, the method of financial investment and it is true to say that there needs to be solution for that.

Changes of Spatial Composition by Project Phase of Homebase and Media-space on Variation Type Middle and High Schools (교과교실제 중등학교 홈베이스와 미디어스페이스의 사업단계별 공간구성 변화)

  • Park, Im-Ho;Jung, Jin-Ju
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.21 no.2
    • /
    • pp.13-24
    • /
    • 2014
  • This study compared and analyzed middle and high school's homebase and media space which are installed along with the introduction of subject classroom system operation method, with regard to the position of arrangement, the type of arrangement, and the change of area, etc. which were changed and applied per the phase of project. For this, design competitions were implemented since 2006 targeting the cases which participated in design directly-indirectly in the researcher's architectural firm, present construction documents among the selected BTL(Build-Transfer-Lease) were completed, and the examples of 10 schools(design competitions 2 schools, BTL selected plans 8 schools) were analyzed, which were operating variation type.

A Study on Standard Repair Periods, Repair Rates of School Facilities for Revitalizing of the School BTL Project (학교 BTL사업의 활성화를 위한 학교시설의 수선주기와 수선율 및 내용연수 산정에 관한 연구 -서울시내 초·중·고등학교를 중심으로-)

  • Ha, Ho-Sung
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.6 no.1
    • /
    • pp.60-84
    • /
    • 2007
  • This study purpose is seeing that the independent standard sufficiently reflecting the characteristics of the school facility as the basic material needed to calculate the maintenance and repair expenses is needed to make a more realistic and valid qualitative VFM analysis of the school BTL project. this study attempted to develop the standard for the repair cycle and rate and economic year of the school facility. The quantitative VFM analysis should be conducted based on the repair cycle and repair rate proper to the school facility, not the residential space, when calculating the maintenance and repair expenses of the operating expenses of the school facility. An attempt was made to calculate the repair cycle, repair rate and economic life of 114 component materials of the school facility judged to be able to explain the school field best. And it was confirmed that the repair and maintenance expenses more is needed to be set by about 35% than the existing maintenance and repair expenses.

  • PDF

A Study on the Improvement of Educational Buildings Constructed by BTL Method - Focused on Architectural Works - (BTL 방식에 의한 신축 교육시설의 개선방안연구 - 건축분야를 중심으로 -)

  • Joo, Jin-Kyu;Kim, Jang-Young;Kim, Sun-Kuk;Lee, Dong-Hoon
    • KIEAE Journal
    • /
    • v.9 no.5
    • /
    • pp.29-37
    • /
    • 2009
  • As with the January 2005 amendment of the Act on Private Participation in Infrastructure, schools are now included in the scope of privately-funded infrastructure projects. According to the announcement made by the Ministry of Education, Science and Technology in 2007, a total of 1.1 billion-won stimulus package has been proposed and is being implemented to operate private investments in social infrastructure helping to secure sufficient educational facilities for a period of five years from 2005 to 2010. Private participation offers first-priority infrastructure in a timely manner, raises efficiency with creative project conception and design, and stimulates economy by tapping into unemployed fund. This study limited its scope to new school construction projects in Gyeonggi Province which have been implemented via BTL system since January 2005. And using field-inspection and interview techniques, the study proposed improvement schemes applicable to the field. The results will be fully incorporated into new school construction projects to be carried out in the future, to help build creative learning space-student-oriented quality structures-where in Korea's leaders of the 21st century knowledge-based society will be educated.