• 제목/요약/키워드: safety reinforcement

Search Result 771, Processing Time 0.029 seconds

사면녹화 보강토공법의 보강재길이 산정에 관한 연구 (The Computation of Reinforcement Length of Afforestation Slope)

  • 박춘식;남광온;김종환;이수양
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 춘계 학술발표회
    • /
    • pp.1302-1308
    • /
    • 2010
  • This study the change of the safety factor before and after the reinforcement were compared by performing the parameter research based on the limit equilibrium analysis regarding the same cross section after carrying out the safety factor before the reinforcement on the virtual section in order to observe the change of the safety factor of the slop reinforced with the slope planting reinforced earth, and the variation of the safety factor according to the increase of the length of the reinforcement materials and the change of the slope height was analyzed. As the result, the reinforcement effect was insignificant at no more than 0.6 of L/H, the reinforcement length ratio when the reinforcement length was increased, as the increase of the safety factor was slow comparing with the non-reinforced slope. At 3.0m of the slope height, reinforcement on the slope is not necessary, and at 3.0m to 5.0m of the slope height, the inclination was not influencing at no less than 0.6 of L/H. At 5.0m to 9.0m of the slope height, the safety factor was mostly secured on the slope at 0.8 of L/H and the over-reinforced slope appeared at no less than 1.0 of L/H. Also, the safety factor increased as the slope height increases and the slope gets steeper till 0.8 of L/H, but the slope steepness affects more on the increase of the safety factor than the reinforcement material, as the reinforcing force by the reinforcement material became steady.

  • PDF

사면보강공법 시공불량사례 검토를 통한 개선방안 연구 (A Case study on the construction badness for slope reinforcement)

  • 권성주;김용수;장범수;나광희
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.739-744
    • /
    • 2005
  • The construction road work are increasing now. And the domestic slope construction are steadily increased and changed the complicated and large-scale. Therefore ground reinforcement for slope stabilization has been increasingly used during the past few decades with a wide variety of techniques including soil nailing, rock bolt, anchor and different types. But in some cases which applied slope reinforcement construction by badness or mistake. So this paper is the study of construction badness for slope reinforcement.

  • PDF

Systems to prevent the load resistance loss of pallet racks exposed to cyclic external force

  • Heo, Gwanghee;Kim, Chunggil;Baek, Eunrim;Jeon, Seunggon
    • Structural Engineering and Mechanics
    • /
    • 제83권6호
    • /
    • pp.745-756
    • /
    • 2022
  • This study aims to determine the cause of the load resistance loss in storage racks that can be attributed to external forces such as earthquakes and to improve safety by developing reinforcement systems that can prevent load resistance loss. To this end, a static cyclic loading test was performed on pallet racks commonly used in logistics warehouses. The test results indicated that a pallet rack exposed to an external force loses more than 50% of its load resistance owing to the damage caused to column-beam joints. Three reinforcement systems were developed for preventing load resistance loss in storage racks exposed to an external force and for performing differentiated target functions: column reinforcement device, seismic damper, and viscoelastic damper. Shake table testing was performed to evaluate the earthquake response and verify the performance of these reinforcement systems. The results confirmed that, the maximum displacement, which causes the loss of load resistance and the permanent deformation of racks under external force, is reduced using the developed reinforcement devices. Thus, the appropriate selection of the developed reinforcement devices by users can help secure the safety of the storage racks.

완경사 사면붕괴 지역의 안전성 보강대책 연구 (A Study on Reinforcement for Slope Stability of Gentle Inclination Slope Collapse Occurrence Area)

  • 이승호;황영철;조성민;노흥제;이은동
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2003년도 사면안정학술발표회
    • /
    • pp.83-91
    • /
    • 2003
  • Always slope according to construct road exist danger because of environment unstability factor in slope, Since this research an inclination of slope is gentle slope (1:1.5∼1:9.0) but falling happened by conduct of continuous ground movement. And this study considered more economical and efficient reinforcement method for slope stability. The various reinforcement methods are applied to execute examination of slope stability. Applied reinforcement methods satisfied safety factor And this research region is performing continuous measurement about ground movements and displacements.

  • PDF

공용중인 터널의 변상에 대한 보강 및 자동화계측 사례 (Case Studies of Automatic Measurement and strength for Damage in the Public Tunnel)

  • 한자중;김영호;장기수;권영정;안상로
    • 한국터널공학회:학술대회논문집
    • /
    • 한국터널공학회 2005년도 학술발표회 논문집
    • /
    • pp.270-281
    • /
    • 2005
  • An especial attention for old tunnel safety is required on increasing of The various tunnel recently. Specially, the lining investigation method of the old tunnel will be able to presume condition of concrete lining indirectly. Because it is many restriction thought of environment and ground condition investigation method of tunnel lining rear. This study carried out section & convergence measurement of part which was deformed in tunnel lining. It had been observed for the change of tunnel behavior with a continuous measurement. It has been analyzed for a cause of tunnel deformation and inspected for the effect after a repair-reinforcement to tunnel compared with the effect before those by structure analysis. By establishing automatic measurement system after repair-reinforcement to tunnel, it would be accomplished to convergence measurement continually. As a result, it was observed that deflection and deformation of tunnel was convergent. but it should be followed to a continuous maintenance because of unstable ground condition, cause of inner tunnel, environment. The railroad tunnel which was executed a reinforcement of the tunnel lining must investigate the close condition of reinforcement lining and concrete lining.

  • PDF

휨과 전단을 고려한 철근콘크리트 방호벽 성능에 관한 연구 (Bending and Shear Capacity of Reinforced Concrete Protective Wall)

  • 권영범;박종일
    • 한국안전학회지
    • /
    • 제38권2호
    • /
    • pp.44-51
    • /
    • 2023
  • With the recent increase in gas energy use, risk management for explosion accidents has been emphasized. Protective walls can be used to reduce damage from explosions. The KOSHA GUIDE D-65-2018 suggests the minimum thickness and height of protective walls, minimum reinforcement diameter, and maximum spacing of reinforcements for the structural safety of the protective walls. However, no related evidence has been presented. In this study, the blast load carrying capacity of the protective wall was analyzed by the pressure-impulse diagrams while changing the yield strength of the reinforcement, concrete compressive strength, reinforcement ratio, protective wall height, and thickness, to check the adequacy of the KOSHA GUIDE. Results show that failure may occur even with design based on the criteria presented by KOSHA GUIDE. In order to achieve structural safety of protective walls, additional criteria for minimum reinforcement yield strength and maximum height of protective wall are suggested for inclusion in KOSHA GUIDE. Moreover, the existing value for minimum reinforcement ratio and the thickness of the protective wall should be increased.

GMO 안전성평가제도의 고찰 (Need for Reinforcement of Safety Assessment on Genetically Modified Organisms)

  • 김은진;최동근
    • 한국유기농업학회지
    • /
    • 제14권2호
    • /
    • pp.139-157
    • /
    • 2006
  • Biotechnology has reached the level of giving birth to new forms of life and with this is a growing controversy in the conflict between science and ethics. Especially, GMOs are closely linked to the food products we consume and thus, the majority of the public shows a very sensitive reaction to the safety of GMO food products. Many perspectives arose surrounding the issues of safety on the human body and the ecology. This outlines diverse structural mechanisms to be set up to ensure safety such as risk assessment, risk management etc. Despite the precautionary principle guaranteed in many ways, the problem arises whether and how this principle can be taken in the safety assessment. GMOs due to its uniqueness do not end with just the possession of the technology involved but must also be considered with the prerequisite that they could be cultured again. Therefore the reinforcement of safety assessment system is necessary. That is, the reinforcement of risk assessment including field tests, the consideration of socio-economic effects, the coordinated system of relevant authorities, the development of technology for safety assessment.

  • PDF

국가산업단지의 지진재난 내진보강대책 수립 연구 (Study on Establishing Earthquake-resistance Reinforcement Measures for Earthquake Disasters in National Industrial Complexes)

  • 송창영
    • 한국재난정보학회 논문집
    • /
    • 제19권4호
    • /
    • pp.882-896
    • /
    • 2023
  • 연구목적: 국가산업단지 공장시설물이 보유한 내진설계의 잠재적 위험과 안전지도 및 점검의 미비점을 효과적으로 향상시킬 수 있는 안전관리 및 내진보강대책 마련을 목적으로 한다. 연구방법: 본 연구에서는 국가산업단지의 지진재난 대비 안전관리 현황 및 관리체계 등 지진재난 안전관리 전반에 관한 조사·분석을 통해 문제점 및 개선방안을 도출하였고, 국가산업단지 내 입주기업체 내진설계 실태조사를 실시하여 시설유형과 구조적 특성에 기반한 개선방안을 제시하였다. 연구결과: 결론적으로 국가산업단지 지진재난 대비 안전관리 및 내진보강에 대한 문제점을 정리하여 4가지 유형별(내진성능 평가 및 관련 제도 보완, 입주기업 및 지자체 권한, 내진보강 및 안전관리 지원대책, 조직의 역량강화)로 개선방안을 도출하였다. 결론: 이를 기반으로 국가산업단지 입주기업이 지진재난을 대비하여 추진해야 하는 내진보강 대책을 마련하였으며, 각 대책별 세부적인 방안을 제시하였다.

터널 시공 중 보강공법 선정용 퍼지 전문가 시스템 개발 (Development of the Fuzzy Expert System for the Reinforcement of the Tunnel Construction)

  • 김창용;박치현;배규진;홍성완;오명렬
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 봄 학술발표회 논문집
    • /
    • pp.101-108
    • /
    • 2000
  • In this study, an expert system was developed to predict the safety of tunnel and choose proper tunnel reinforcement system using fuzzy quantification theory and fuzzy inference rule based on tunnel information database. The expert system developed in this study have two main parts named pre-module and post-module. Pre-module decides tunnel information imput items based on the tunnel face mapping information which can be easily obtained in-situ site. Then, using fuzzy quantification theory II, fuzzy membership function is composed and tunnel safety level is inferred through this membership function. The comparison result between the predicted reinforcement system level and measured ones was very similar. In-situ data were obtained in three tunnel sites including subway tunnel under Han river, This system will be very helpful to make the most of in-situ data and suggest proper applicability of tunnel reinforcement system developing more resonable tunnel support method from dependance of some experienced experts for the absent of guide.

  • PDF

지하철 터널 균열밀도 분석을 통한 합리적인 보수보강 방안 연구 (Study on a rational repair and reinforcement by analysis of crack density in OO subway)

  • 윤태국;신용석;안상로;이송
    • 한국터널공학회:학술대회논문집
    • /
    • 한국터널공학회 2005년도 학술발표회 논문집
    • /
    • pp.262-269
    • /
    • 2005
  • The priority order about a rational repair and reinforcement is generally decided by subjective decision of engineer. An appearance investigation by tunnel scanner that is widely used in foreign nation was carried out to decide about a rational repair and reinforcement through systematic and objective analysis in box and NATM tunnel. We have decided on the order of priority of an rational repair and reinforcement through the crack density analysis by span, distance and location with the result of tunnel scanner.

  • PDF