• Title/Summary/Keyword: safety inspection and diagnosis

Search Result 151, Processing Time 0.028 seconds

Development of Expert System for Maintenance of Tunnel(I) (터널의 유지관리를 위한 전문가시스템 개발(I) : 시스템 구축 및 적용성 검토)

  • Kim, Do-Houn;Huh, Taik-Nyung;Kim, Moon-Kyum
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.4 no.2
    • /
    • pp.175-184
    • /
    • 2000
  • The maintenance of tunnels is often neglected since tunnels has tendency to become stable with time. The determination of safety of tunnels is a complicated problem. So the role of experienced engineer in the maintenance is very important and development of an expert system which can perform as these engineers has been needed. In this study, an expert system which can determine the safety of tunnels is developed. The developed knowledge base contains the maintenance procedure which is used in KlSTEC(Korea Infrastructure Safety & Technology Corporation). Field test, laboratory test and nondestructive test methods are considered in this knowledge base. Criteria for each item and integrated diagnosis criteria are implemented in the expert system based on literatures and reports. The expert system includes basic inspection. detail inspection and precision inspection. For precision inspection. it has the capacity to exchange the result from numerical analysis by a commercial program FLAC. To verify the expert system. the proposed procedure was compared with an existing tunnel diagnosis report.

  • PDF

A Study on the Improvement of Member Evaluation Method in the Condition Evaluation of Reinforced Concrete Buildings (철근콘크리트 건축물의 상태평가 중 부재평가방법 개선에 관한 연구)

  • Woo, Hye-Sung;Yi, Waon-Ho;Hwang, Kyung-Ran;Lee, Kwan-Hyeong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.3
    • /
    • pp.85-91
    • /
    • 2021
  • Type 1 and type 2 buildings must regularly conduct precise safety inspections and precise safety diagnosis for the safety and maintenance of facilities, and the safety grade of the building is determined according to the results of the implementation. In addition, the cycle of inspection and diagnosis is determined according to the safety grade of the building. In order to determine the safety grade of the building, a precise safety inspection conducts condition evaluation, and a precise safety diagnosis conducts condition evaluation and safety evaluation. Therefore, since the inspection and diagnosis cycle is determined according to the safety grade of the building, the condition evaluation and safety evaluation must be precise. However, in the case of member unit evaluation, which is the first step in evaluating the current condition, the evaluation grade is determined by using the representative value of the measurement result, and this may result in an error in the evaluation grade. To solve this problem, this study analyzed evaluation criteria for each evaluation item and presented evaluation criteria using inequalities to respond to measurement results and evaluation scores. In addition, we present a functional formula that can reflect performance scores for each evaluation item.

Tunnel Safety Diagnosis in Near-excavation by In-depth Inspection of Tunnel (기존터널 안전진단 결과를 통한 근접시공 시 터널 안정성 평가)

  • Kim, Seok-Jae;Kim, Min-Seok;Kim, Jun-Chul;Yoo, Young-Il;Oh, Joung-Bae;Oh, Sae-Joon
    • Tunnel and Underground Space
    • /
    • v.16 no.4 s.63
    • /
    • pp.347-356
    • /
    • 2006
  • We analyzed case studies doing in-depth inspection of tunnel to maintain safety of existing tunnel in constructing new tunnel near to a existing tunnel with single track. Futhermore, We accomplished in-depth inspection of existing tunnel and numerical analysis. We suggested remedies to security safety of existing tunnel. We applied line drilling and pre-large hole boring method not to have an effect on existing tunnel and convinced the safety of existing tunnel from blast-vibration and blast-noise of numerical analysis. We planed to install basset system to measure displacement of existing tunnel according to excavating new tunnel.

Establishment of a Safety Inspection System for Public Institutions Ordered Construction Projects (건설공사 발주 공공기관의 안전점검 체계구축에 관한 연구)

  • Eung Ho Park;Sudong Lee;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.3
    • /
    • pp.55-62
    • /
    • 2023
  • Public institutions have a responsibility to ensure the safety of their employees and the public. One way to do this is to implement a systematic safety inspection system based on risk assessments and continuous improvements. This study developed a systematic safety inspection system for public institutions that are ordered construction projects. The proposed system in this study consists of a three-step process: (1) developing safety grade evaluation tables, (2) preparing and conducting safety inspections, and (3) evaluating and improving safety management grades. The first step is to develop safety grade evaluation tables by analysis and diagnosis of the construction site's work type, disaster statistics, and related laws. The second step is to conduct safety inspections using the developed evaluation tables. The third step is to determine the safety management grade based on the results of the safety inspection, and to improve risk factors found during the safety evaluation. The proposed system was implemented in highway construction projects carried out by public institutions. The results showed that the proposed system has two major effects: (1) reducing accident-related deaths and injuries, (2) improving safety management levels by continuous evaluation and improvement. The proposed system can be utilized in construction projects ordered by public institutions to improve the level of occupational safety and health.

Remaining Service Life Estimation Model for Reinforced Concrete Structures Considering Effects of Differential Settlements (부등침하의 영향이 반영된 철근콘크리트 구조물 잔존수명 평가모델)

  • Lee, Sang-Hoon;Han, Sun-Jin;Cho, Hae-Chang;Lee, Yoon Jung;Kim, Kang Su
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.1
    • /
    • pp.133-141
    • /
    • 2020
  • Korea Infrastructure Safety and Technology Corporation (KISTEC) specifies that the safety inspection and precise safety diagnosis of concrete structures shall be conducted in accordance with the 'Special Law on Safety Management of Infrastructure'. The detailed safety inspection and precise safety diagnosis guidelines presented by KISTEC, however, gives only the grade of members and structures, and thus it is impossible to quantify remaining service life (RSL) of the structures and to quantitatively reflect the effect of differential settlements on the RSL. Therefore, this study aims to develop a RSL evaluation model considering the differential settlements. To this end, a simple equation was proposed based on the correlations between differential settlements and angular distortion, by which the angular distortion of structures was then reflected in nominal strengths of structural members. In addition, the effects of the differential settlements on the RSL of structures were analyzed in detail by using the safety diagnosis results of actual concrete structure.

Analysis and cause of occurrence of lining cracks on NATM tunnel based on the precise inspection for safety and diagnosis - Part I (정밀안전진단 결과를 활용한 NATM터널(무근)의 라이닝 균열 종류별 발생원인 및 분석 - Part I)

  • Choo, Jin-Ho;Park, Sung-Woo;Kim, Hyung-Tak;Jee, Kee-Hwan;Yoon, Tae-Gook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.3
    • /
    • pp.199-214
    • /
    • 2011
  • A crack is the main cause to affect the integrity of tunnel lining as well as leakage, spalling, exposed rebar, corrosion, carbonation and so on. Since the 1980, NATM has prevailed on excavation method and geotechnical philosophy in tunnel. Although the pattern of cracks has been reported by several engineers' effort, it was only focused on longitudinal cracks of lining. Eleven operational NATM tunnels have been conducted with the precise inspection for safety and diagnosis by KISTEC (Korea Infrastructure Safety and Technology Incorporation). With those results, the crack patterns by the spatial distribution and appearance for each tunnel have been analyzed and the cause of occurrence for seven common types of cracks in NATM tunnels was classified. Additionally, the longitudinal crack on lining above duct slab was figured out by numerical simulation and field inspection. Each crack has been analyzed by CCD (Charge-Coupled Device) scanner image with 3D configuration. Each type of cracks is also explained with output of experimental and condition of construction. Defined cracks on NATM tunnels will be good example for periodical inspection and precise inspection for safety and diagnosis.

A Study on the Improvement of Condition Evaluation Method through Correlation Analysis between Evaluation Items of Reinforced Concrete Buildings (철근콘크리트 건축물의 평가항목간 상관관계 분석을 통한 상태평가방법 개선에 관한 연구)

  • Woo, Hye-Sung;Yi, Waon-Ho;Hwang, Kyung-Ran;Lee, Kwan-Hyeong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.3
    • /
    • pp.92-99
    • /
    • 2021
  • In the case of precise safety inspection and precise safety diagnosis of a building, a condition evaluation must be conducted to determine the safety grade. Since 2004, an evaluation method using fuzzy theory has been introduced for quantitative condition evaluation,and the relationship and importance of reinforced concrete members using fuzzy theory have been applied. Generally, fuzzy theory is a method used to deal with ambiguous expressions with unclear correlations, but at the time of development, it seems that it was developed by applying fuzzy theory as an alternative in a situation where inspection and diagnosis result data were insufficient. Therefore, it is necessary to verify the relationship and importance of evaluation items derived based on the current fuzzy theory using actual inspection and diagnosis result data.In this study, the correlation between the evaluation items was derived by using the results of 19 precision safety inspections and 9 precision safety inspections and the performance score function formula, and using this, a reasonable durability score calculation formula of the member was presented.

Development of Inspection and Diagnosis System for Safety and Maintenance in Tunnel (터널 유지관리를 위한 안전진단시스템 개발에 관한 연구)

  • Kim, Young-Geun;Baek, Ki-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.3 no.1
    • /
    • pp.37-50
    • /
    • 2001
  • Recently, as tunnel structure is getting old, many deformations and defects have been occurred. As tunnel has the characteristics of underground structure, the estimation of the cause of deformation is very difficult. Then, it is necessary to investigate the state of tunnel lining and to estimate the deformation cause and safety for tunnel. In this study, inspection and diagnosis system for effective maintenance in tunnel was researched. Firstly, non-destructive techniques such as GPR (ground penetrating radar), impact echo test, and infrared thermal techniques were applied to tunnel lining inspection. Tunnel lining analysis system was developed to analyze the stability of tunnel. And, tunnel soundness evaluation system was developed to find the probable causes and indicate the method for repair and reinforcement for tunnel.

  • PDF