• 제목/요약/키워드: rush work of construction

검색결과 3건 처리시간 0.016초

건설 현장 강행공사 방지가 인적사고에 미치는 영향에 관한 연구 (A study on effects of the prevention of rush work of construction sites on human accidents)

  • 이성일;강경식
    • 대한안전경영과학회지
    • /
    • 제19권1호
    • /
    • pp.27-37
    • /
    • 2017
  • In the construction sites, rush (speedy construction) work have recently been overused because of budget reductions by reducing the construction duration after the long-term economic recession and construction business stagnation with institutional change including the instruction of the duration shortening bidding system and the introduction of the post-construction sales system by the Korea Research Institute for Human Settlements. Due to this, negligent accidents have frequently occurred by forcing manpower, equipment, finance, and material procurement and pressing ahead with impractical construction wok at night according to the reduction of construction schedules. Therefore, this paper has the necessity of this study to seek for alternatives to prevent negligent accidents by finding factors related to rush work in the reality that the importance for preventing negligent accidents is more emphasized while they have not been reduced in construction sites.

A COMPARATIVE STUDY OF CAUSES AND EFFECTS OF PROJECT DELAYS AND DISRUPTIONS IN CONSTRUCTION PROJECTS IN THE SOUTH AFRICAN CONSTRUCTION INDUSTRY

  • Oshungade, Oluwaseun O.;Kruger, Deon
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권1호
    • /
    • pp.13-25
    • /
    • 2017
  • Construction projects have been observed to have problems of project delays and disruptions and the South African construction industry is not an exception. This research identified causes and effects of project delay and disruption through a desktop study. Subsequently, a questionnaire was designed and used to conduct a survey to obtain the views of the three main construction project participants - clients, consultants, and contractors. The questionnaire contains 48 causes and 13 effects of project delay and disruption identified from the desktop study. This research identified sixteen most important causes of project delay and disruption and five most important effects of delay and disruption. Sixteen most important causes were: (1) strikes, (2) rework due to errors during construction, (3) shortage of materials in market, (4) suspension of work by the client, (5) poor communication between the parties, (6) ineffective planning and scheduling of project, (7) delays in issuing working drawings, (8) mistakes and discrepancies in design documents, (9) shortage of labours and equipment, (10) delay in decision making process by the client, (11) unforeseen ground conditions, (12) unclear and inadequate details in drawing, (13) inadequate contractor's experience, (14) delay in approving changes in the scope of works, (15) delay in material delivery and (16) unacceptable quality of materials. The five major effects include: (1) create stress on contractors, (2) cost overrun, (3) time overrun, (4) poor quality of work due to rush, and (5) disputes. Furthermore, the result of this research was compared with the result of previous studies conducted in other regions of Africa in terms of causes and effects of project delay and disruption. The research concludes that numerous causes and effects of delay and disruption are limited to South African construction projects based on the comparison. The causes limited to South African construction projects include: (1) strikes, (2) suspension of work by the client (3) mistakes and discrepancies in design documents (4) delay in approving changes in the scope of works and (5) unacceptable quality of materials, while the two major effects limited to South African construction projects includes: (1) create stress on contractors and (2) poor quality of work. In conclusion, some recommendations were made in order to minimise the causes of delay and disruption identified.

지하철건설에 따른 문화재 보호와 동대문역사시공 보고서(1) (Study on the measurement of blasting vibration response in construction a subway station at East gate of cultural treasure)

  • 최상열;이수복;허진;채수연
    • 기술사
    • /
    • 제17권3호
    • /
    • pp.32-49
    • /
    • 1984
  • The East gate station area is 205M long and 24m deep which is located 13 meter in front of cultural treasure east gate. The area to be excavated by blasting is composed of granite rocks from 10M depth to 25M. Surface earth extends to up 10M depth. This job site has in involves heavy traffic congestion such as over 10,000 cars passing in rush hour where clossing No 1 lint of subway running 3 minitues head way. This east gate station construction is to be executed for the provent of the setting down of underground level and blasting vibration effects to cultural treasure east gate. Therefore, the caltural treasure committee approved this execution subject to the following condition. 1. Subway gelogical foundation and measured natural frequency 2. Execution of water tight wall 3. Sellection and test of damping material for wall and under rail 4. Measurement of monitoring system during the execution 5. Measurement of histogram system The above two projects was carried out by Dr. Kwang team in KAIST and prof, Han in Hanyang University under accadamic study contract. In the blasting work, for the pourpose of reduced vibration and low explosion velocity such as CCR, Kovex slurry. The 2nd, used electrical caps shall be delay cap and M/S caps in multi delay. The 3rd, drilling pattern is bench cut in open cut and applied control blasting in tunnelling and also shall drill anti-vibration holes as line drilling.